HomeMy WebLinkAboutPlumbing (storm drain) - 09/25/1992 �
�
O.IHKOIH City of Oshkosh
oNTr+EwarER September 25 ' 1992
Oscar J. Boldt Const . Co .
2525 N. Roemer Rd.
A�pleton, WI 54915
RE: Grace Lutheran Gym
919 Nebraska
Plan #F9-54-992P
Storm Drainage
Gentlemen:
Examination of the plumbing plans and specifications for the
abovementioned project has been completed.
In accord with Cha�ter 145 , Wisconsin Statutes , and ILHR 81 through
85 , Wisconsin Administrative Code, the plumbing plans and :
specifications are apProved contingent upon compliance with the
stipulation noted below:
1 . None
The architect , professional engineer, registered designer, owner or
plumbing contractor shall keep, at the construction site, one set
of plans bearing the stamp of approval .
In the event installation of this plumbing system has not commenced
within two years from this date, this approval shall become void.
A new application accompaned by full examination fee shall be filed
and an u�dated approval received before work may commence.
In granting this approval , the City of Oshkosh or its
representative does not hold itself liable for any defects in plans
or specification, plan omissions , examination oversight ,
construction or any damage that may result in or after installation
and reserves the right to order changes or additions should
conditions arise making this necessary.
It shall be necessary for installing plumber to obtain a plumbing
permit from the City of Oshkosh before proceeding with actual
installation of this plumbing system or any of its parts .
Sincerely,
WALTER CALLIES
Plumbing Inspector