Loading...
HomeMy WebLinkAboutPlumbing (storm drain) - 09/25/1992 � � O.IHKOIH City of Oshkosh oNTr+EwarER September 25 ' 1992 Oscar J. Boldt Const . Co . 2525 N. Roemer Rd. A�pleton, WI 54915 RE: Grace Lutheran Gym 919 Nebraska Plan #F9-54-992P Storm Drainage Gentlemen: Examination of the plumbing plans and specifications for the abovementioned project has been completed. In accord with Cha�ter 145 , Wisconsin Statutes , and ILHR 81 through 85 , Wisconsin Administrative Code, the plumbing plans and : specifications are apProved contingent upon compliance with the stipulation noted below: 1 . None The architect , professional engineer, registered designer, owner or plumbing contractor shall keep, at the construction site, one set of plans bearing the stamp of approval . In the event installation of this plumbing system has not commenced within two years from this date, this approval shall become void. A new application accompaned by full examination fee shall be filed and an u�dated approval received before work may commence. In granting this approval , the City of Oshkosh or its representative does not hold itself liable for any defects in plans or specification, plan omissions , examination oversight , construction or any damage that may result in or after installation and reserves the right to order changes or additions should conditions arise making this necessary. It shall be necessary for installing plumber to obtain a plumbing permit from the City of Oshkosh before proceeding with actual installation of this plumbing system or any of its parts . Sincerely, WALTER CALLIES Plumbing Inspector