Subject: Change Order No. 1(Final)
Contract 14-17
Dear Mr. Raboine:
�
O1HKOlH
ON THE WATER
Enclosed is an executed copy of Change Order No. 1(Final) between the City of Oshkosh and Vinton
Construction Company regarding the abovementioned project.
If you have any questions, please call our office at (920)236-5065.
Sincerely,
� � �
� ������
Steven M. Gohde, P.E. �
Interim Director of Public Works
SMG/tlt
Enclosure: Change Order No. 1(Final)
cc: Pam Ubrig, City Clerk (w/original)
Tara Wendt, Assistant Finance Director (w/copy)
File (w/original)
C�Engineering�2014 CONTRACTS\14-17 Marion Rd Storm Swr Outfall�Project_Information\Contract Info\Change Page 1 Of 1
Orders\14-17 Executed CO #1 (Final) Ltr_9-9-15.docx
TO: Vinton Construction Company
PO Box 1987
Manitowoc, WI 54229-1987
CHANGE ORDER #1 (Final)
DA7"E; September 2, 2095
Your present contract with the City of Oshkosh, Contract No. 14-17, awarded November 11, 2014, is hereby
amended and changed as follows:
NET DECREASE TO: SEC710N I- PAVING
NET DECREASE TO: SECTION II - STORM SEWER
NET INCREASE TO: SECTION IV - WATER MAIN
NET DECREASE TO CONTRACT
Bid Totaf
c.o. ��
Contract Total
Section I
(Paving)
$26,900.00
Section II
{Storm}
$163,479.37
($1,610.75)
($18,942,65)
1 231.60
{$19,321.80)
Section IV
(Water) Totals
$7,770.00 ' $198,149.3'
ciYY o� osNKOSt�
78,827.57 -
BY;
,�
Recommended: City Manager \\
���l �� ��>�� �� .�� ���� -�
(nterim Director of Public Works City Clerk �
Approved and accepted:
4 �
C actor
I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconstn,
under the within Change Order.
,,
��I��f��,��'`�,'- �� i �
Comptroller
Approve s to forrn•
�. ��r
___ City A�or e
CONTRACT 14•t7 CHANGE OROER #1 (�Inal}
SEC710N I - PAVINO
lTEM DESCRIA)70N UN17 B1D INSTALCED NE7 NET UNlT INCREASElN PECREASEIN
NUMBER QUANTITY QUAN7lTIES 1NCREASE DECREASE PRICE CON7RACTPRfCE CONTRACTPRlCE
110o Removing pavement, Square
com leta as s citied Yards 268 219.75 •48.25 $7.00 $337.75
1120 Removing concrele and
asphali sidewatk and
driveway, complele as Square
s ecified Feet 63A 787.b0 163.b0 $1.00 S153.50
131 f 8" concrete pavemenl, wilh 6"
CABC and grading, complete Square
as s ecified Yards 134 146.59 12.50 560.00 $750.00
1335 Temporary concrele
pavement, vrilh CABC and
grading, complefe as Square
s eciFled Yards 182 112.60 -49.40 $60,00 32,964.00
1449 30" curb and gutter, 7", vnth
5" CABC and grading, Llnear
com lete as s ecified Feet 65 88.70 23.70 535.00 $829.50
1500 A" concrete sidewalk with 3°
CABC and greding, complele Squers
as s ecified Feet 125 158.00 33.00 58.00 5198.00
1616 7" concreto sidewalk with
steel refnforcement, CABC,
and grading (Rivervralk), Square
com lete as s ecified Feet 255 27b.00 20.�0 57.00 S1AO.o0
1700 Sawing exis4ng pavement, Linear
com lete as s ecified Feet 230 135.00 -95.00 $4.00 5380.06
SECTION I-(B1D ITEMS 11U0 • 1700) • SU9TOTAL 52,071.00 (53,881.75)
NET DECREASE T0: SECTI6N I (51,610.76)
SECTION 11 - STORM SEWER
1TEM DESCRIPTION UN1T g!D INS7ALLED NET NET UNlT lNCRF.�ISEIN DECREASElN
NUh18E'H QUANTlTY QUANTITIES INCREASE OECREASE PRfCE CONTRACiARICE CON7RACTPRfCE
2002 Strip and stockpile lopsoil, Square
com lete as s ecified Yards 1805 0.00 -1 805.00 $1.00 $1 805.00
2028 Excavation balow subgrade,
com lete as s eciFied Tons 1A7 17.00 -130.00 $22.77 S2 960.10
2050 Furnlsh and install 58" RCP
Class I!I storm sewer, Linear
com lete as s eci6ed Feet 16 18.50 2.50 S77.38 8183.45
2078 Furnish and install 36" storm Linear
sewer com lete as s ecified Feet 174 162.00 -12.00 3146.15 S� 753.80
2080 Furnish and Install 38" RCP
Class III storm sewer, Li�ear
com lete as s cifed Feet 140 138.00 -2.00 5158.15 $316.30
2538 Furnish and instail standard
stotm sewer manhole (6'
diameter), complete as Vertical
s edfied Feet 8 5.00 -1.00 5708,00 5708.00
2556 Furnish and install s4andard
storm sewer inlet manhole, Vertical
com lete as s cified Feet 8 5.50 -0.50 $493.00 5201.50
2858 Furnlsh, install, mainlain, and
remove Type D modified inlet
protection, complete as
s cified Each 7 5.00 -8.00 $99.00 5540.00
2860 Sediment removal -Type D
modified INet protection,
com fele as s eciffed Eacft 21 0.00 -21.00 $5.00 Si05.00
2884 Furnish, install, maintain, and
remove silt fence, complete Linear
ass edlied Feet 520 �59.00 -361.00 $3.00 $1083.00
2802 Insiall salvaged topsoil 8"
depth, compfe�e as specified Square
Yards 1805 20.00 -1,755.00 50.80 $1 a28.o0
Page t ol z
CONTRAC714-i7 CHANGE ORDER #1 (Final)
lTEM DESCRfPTION UNIr 81D lNSTALtED NEr NET UNlT lNCREASEIN DECREASElN
NUTABER QUANTI7Y QUANT171ES 1NCREASE DECRERS[ PRICE CONTRAC7PRlCE CONTRACTPRIC[
2922 Furnish and install no-mow
fescue, complete as specifed Square
Yards 1805 20,00 -1785.00 32.00 $3,570.00
2924 Furnish and InstaU annuai
cover crop, complate as Square
s acified Yards 1805 20.U0 -1 785.00 50.20 $357.00
2990 Excavation special (storm),
com lete as s cified Tons 2500 1 437.92 -1 062.08 $5.00 S5 310.40
SECTION II -(B1EJ 17EMS 2002 - 2990) - SUBTOTAL $193.45 (520,136.10}
ADDITtONAL WORK REQUIRED; CO #1 - SECTION II
ITEM pfSCRfPT10N UNI7 810 fNS7AL1E0 NET NET UNIT lNCREAS&IN PECRF�7SEIN
NUM�ER QUANi17Y QUANT171ES INCREASE PBCREASE YRICE COMWICTPRlCE CONTRACTPHICE
12082 Furnish and install24" RCP
Class Ul storm sewer, Linear
com lete as s ecified Foot 0.00 8.00 8.00 $125.00 $1 000.00
ADDI710NA1 WORK: CO li1 -(ITEM 12062) - SUBTO7AL 51,0OO.OD Sfl.00
NEi DECREASE 70: SECTtON II (S18,9A2.85)
SECTION 3V • WA7ER MAIN
/iEM DESCRIPTfON UNI7 81D lNS7ACLEA NET NET UNlT INCRfASE1N DECREASEIN
NUlABER QUANTITY QUANTITlES 1RCRF1iSE DECREASE PR10E CONTRACTPRICE CONT72ACTPRICE
4008 Furnlsh and InslaN 12" ductile
iron water main (relay) with
poly�vrap, complete as Linear
s ecifed Feel 18 15.59 -2.50 5133.00 3332.50
SECTION fV •(BID ITEM 4008) • SUBTOTAL 50.00 (5332,50)
ADDITIOIVAL WORK REQUIRE�: CO #1 -SEC7iON 1V
��M DESCRlPTfON UNIT B!D 1NSTALLEP NET NET UNIT 1NCREASBfN OECREASElN
NUTABER QUANTlTY QUAN7filES IFICREASE DE'CREASE PRlCE CONTRACTPRlCE CONTRAGTPRICE
14302 Furnish and install 12" water
main sleeve, complate as
s ecified £ach 0.00 1.00 1.00 5805.00 5805.00
14998 Repair mis-located fire
protection line, complete as l.ump
s ecified Sum 0.00 1.00 1.00 5959.10 5859.10
ADDITIONAL WORK: CO #1 (iTEMS 14362 • i4999) • SUBTOTAL
NET INCREASE TO: SECTtON IV
NET tNCREASE TO SECTIONS I, II, &, tV
NET DECREASE TO SECT�ONS I, II, & IV
NET DECREASE TO CONTftACT:
Page 2 of 2
S�,ssa.�o So.00
S1,231.80
54,828.55
(524,1b0.36)
(519,321.80)