HomeMy WebLinkAbout0122213-Building (roof) � CITY OF OSHKOSH No 122213
�
OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 7921 NEBRASKA ST Owner DAVID VIENOLA Create Date 10/23/2006
Designer Contractor OWNER
Category 141 -Exterior Remodeling Plan
Type � Building � Sign � Canopy � Fence _ � Raze I
Zoning Class of Const: Size
Unfinished/Basement Sq.Ft. Rooms Height Ft. ❑ Projection I
Finished/Living Sq.Ft. Bedrooms Stories Canopies
Garage Sq.Ft. Baths Signs
Foundation � Poured Concrete � Floating Slab � Pier � Other
� Concrete Block � Post � Treated Wood - -
Occupancy Permit Not Required Flood Piain Height Permit
Park Dedication #Dwelling Units 0 #Structures 0
Use/Nature j�FR/Installing rubber roofing for the flat sections of the house roof and garage roof. Re-roofing the south side of the house(complete
of Work tear off-No structural work). Repairing damaged sections of the garage fascia.
�
I
HVAC Contractor Plumbing Contractor
Etectric Contractor
Fees: Valuation $4,000.00 Plan Approval $0.00 Permit Fee Paid $46.00 Park Dedication $0.00
Issued By: �,�/'— Date 10/23/2006 Final/O.P._00/00/0000 }
� Permit Voided I Parcel Id# 1400820300
In the performance of this work I agree to perform ali work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a parry,if you perform the work
described in this permit ap i tion within an easement,the City str gly urges the permit applicant to contact the easement
holder(s)and to secure rty ecessary ro als efo�e startin ch activiry.
Signature Date��-� f0 Q
AgenUOwner
Address 1921 NEBRASKA OSHKOSH WI 54902 - 0490 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address,Permit Number,Type of
Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.