Loading...
HomeMy WebLinkAbout0122213-Building (roof) � CITY OF OSHKOSH No 122213 � OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 7921 NEBRASKA ST Owner DAVID VIENOLA Create Date 10/23/2006 Designer Contractor OWNER Category 141 -Exterior Remodeling Plan Type � Building � Sign � Canopy � Fence _ � Raze I Zoning Class of Const: Size Unfinished/Basement Sq.Ft. Rooms Height Ft. ❑ Projection I Finished/Living Sq.Ft. Bedrooms Stories Canopies Garage Sq.Ft. Baths Signs Foundation � Poured Concrete � Floating Slab � Pier � Other � Concrete Block � Post � Treated Wood - - Occupancy Permit Not Required Flood Piain Height Permit Park Dedication #Dwelling Units 0 #Structures 0 Use/Nature j�FR/Installing rubber roofing for the flat sections of the house roof and garage roof. Re-roofing the south side of the house(complete of Work tear off-No structural work). Repairing damaged sections of the garage fascia. � I HVAC Contractor Plumbing Contractor Etectric Contractor Fees: Valuation $4,000.00 Plan Approval $0.00 Permit Fee Paid $46.00 Park Dedication $0.00 Issued By: �,�/'— Date 10/23/2006 Final/O.P._00/00/0000 } � Permit Voided I Parcel Id# 1400820300 In the performance of this work I agree to perform ali work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a parry,if you perform the work described in this permit ap i tion within an easement,the City str gly urges the permit applicant to contact the easement holder(s)and to secure rty ecessary ro als efo�e startin ch activiry. Signature Date��-� f0 Q AgenUOwner Address 1921 NEBRASKA OSHKOSH WI 54902 - 0490 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address,Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.