Loading...
HomeMy WebLinkAbout10. 15-412SEPTEMBER 8, 2015 15-412 RESOLUTION (CARRIED___7-0_____LOST________LAID OVER________WITHDRAWN________) PURPOSE: APPROVE ENGINEERING SERVICES AGREEMENT WITH AECOM TECHNICAL SERVICES, INC. FOR DESIGN SERVICES FOR SOUTH PARK AREA BASIN RETROFIT ($299,900.00) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the proper City officials are hereby authorized to enter into and take those steps necessary to implement an appropriate professional services agreement with AECOM Technical Services, Inc. for design services including topographic and bathymetric surveying, wetland delineation and reporting, geotechnical investigation and reporting, storm water modeling and design, historic bridge evaluation and rehabilitation, sediment sampling and disposal assistance, structural analysis and design, preparation of construction documents, preparation of construction permits, and project management and meeting attendance related to the South Park Area Basin Retrofit in the amount of two hundred ninety-nine thousand nine hundred dollars ($299,900.00) Acct. No. 561-2010-1799-00000 Storm Utility – Construction in Progress 325-0610-7216-xxxxx Park Improvement Fund – Land Improvement OIHKOH ON THE WATER MEMORANDUM TO: Honorable Mayor and Members of the Com ouncil FROM: James Rabe, Civil Engineering Supervises!/ DATE: September 3, 2015 RE: Engineering Services Agreement for Design Services for South Park Area Basin Retrofit / AECOM Technical Services, Inc. (AECOM) ($299,900) BACKGROUND The Departments of Public Works and Parks requested a proposal from AECOM to provide design services associated with the South Park Area Basin retrofit. The basins, or lagoons, in South Park provide a recreational amenity within South Park, as well as providing a storm water management function. The basins have become full of sediment which reduces the aesthetic amenity of the basins, and the banks have become severely eroded, creating safety concerns. The Departments of Public Works and Parks are working together to develop a design to reconstruct the basins. AECOM is utilizing Rettler Corporation as a sub-consultant to assist with design features in coordination with the South Park Master Plan. Rettler Corporation completed the South Park Master Plan in 2014, the Rainbow Park Master Plan in 2013, and the Comprehensive Outdoor Recreation Plan in 2011. These design services will include, but are not limited to, topographic surveying, wetland delineation and reporting, geotechnical investigation and reporting, storm water modeling and design, historic bridge evaluation and rehabilitation, sediment sampling and disposal assistance, structural analysis and design, preparation of construction documents, preparation of construction permits, and project management and meeting attendance. ANALYSIS AECOM was chosen due to their experience within the Stringham Watershed, and their experience in projects of this type with the City. Rettler Corporation was chosen as a sub-consultant due to their experience with the South Park Master Plan, and other park master plan documents. In order to have a reasonable estimate of construction costs to include in the 2017 Capital Improvement Program, it is critical to begin design work now. FISCAL IMPACT The proposed fee is not to exceed $299,900. Funds for this project are included in the Storm Sewer section of the 2014 Capital Improvement Program and the Park Improvements Section of the proposed 2016 Capital Improvement Program. The money allocated in the Park Improvements Section of the proposed 2016 Capital Improvement Program will not be spent until that program has been approved. RECOMMENDATIONS Chapter 12 of the Municipal Code of the City of Oshkosh provides that professional services of a specialized nature, including engineering services, may be procured without the use of formal, sealed quotes. I have reviewed the proposal and in accordance with Section 12-16 of the Code, I am hereby recommending that the Common Council approve this agreement. Approved, Mark A. Rohloff City Manager JER/tlt I.\Engineering\2015 CONTRACTS\1 5-28 S Park Area Basin Retrofit Des\Project_Information\Correspondence\Memo\15-28 AECOM-Design Sery Agreement Memo_9-3-15.docx