DEMOLITlQN CONTRACT
1233 CEAPE, OSFtiKOSH WI 54901
THIS AGREEMENT, is entered into on the 8TH day of JULY, 2015, by and between
the CITY OF OSHKOSH, (CITY), and WALLY SCHMID EXC INC (name) 7821 SWISS
ROAD, OSHKOSH WI 54902 (address), an entity formed pursuant to the laws of the State
of Wisconsin, (CONTRACTOR). Based upon the promises and consideration described in
this document, the parties' agreement is as follows:
ARTICLE I. SCOPE OF WORK
The Contractor hereby agrees to furnish all of the materials and all of Yhe equipment
and labor necessary, and to perform all of the work shown on the plans and described in
the specifications for the project entitled or described as follows:
Demolition Quotation No. 2015-1
for 1233 CEAPE, OSHKOSH WI 54901 and appurtenanY work, for the City of Oshkosh, all
in accordance and in strict compliance with the City's request for quotations and the other
documents referred to in ARTICLE V of this contract and which are fully incorporated into
this contract as if fully restated.
ARTICLE II. TIME OF COMPLETION
The work to be performed under this contract shall commence be completed within
the time limits specified in the General Conditions.
ARTICLE IIi. PAYMENT
(a) The City shall pay to the Contractor for the performance of the contract the total
sum of $8,600.00, adjusted as allowed in the General Conditions or as allowed
by law, or any changes hereafter mutually agreed upon in writing by the parties.
(b) Progress Payments. In the event the time necessary to complete this Contract
is such that progress payments are required, they shall be made according to
the provisions set forth in the General Conditions.
ARTICLE IV. CONTRACTOR TO lNDEMNlFY AND HOLD CITY HARMLESS
The Contractor covenants and agrees to protect and hold the City of Oshkosh
harmless against all actions, claims and demands of any kind or character whatsoever
which may in any way be caused by or result from the intentional or negligent acts of the
Contractor, his agents or assigns, his employees or his subcontractors related however
remotely to the performance of this Contract or be caused or result from any violation of
any law or administrative regulation. The contractor shall indemnify the City for all sums
including court costs, attorney fees, damages, and punitive damages which the City may be
obliged or adjudged to pay on any such claims or demands within thirty (30) days of the
date of the City's written demand for indemnification.
Demolition Contract - 1
ARTICLE V. INSURANCE
The Insurance required by the City of Oshkosh as specified in the City's General
Conditions, Supplemental Conditions, and addenda, or plans, or instructions, or
advertisements, shall be primarv coveraqe and that any insurance or self insurance
maintained by the City of Oshkosh, its officers, council members, agents, employees or
authorized volunteers will not contribute to a loss. All insurance shall be based upon the
occurrence of an event, and not based on claims made. All insurance shall be in full force
prior to commencing work and remain in force until the entire job is completed and the
length of time that is specified, if any, in this contract, the specifications, whichever is
longer.
ARTICLE VI. COMPONENT PARTS OF THE CONTRACT
This contract between the City and the Contractor consists of the following
component parts, all of which are as fully a part of this contract as if herein set out verba-
tim, or if not attached, as if hereto attached. :
1 . This Document
2. The City's General and any Supplemental Conditions
3. Specifications, including any addenda
4. City of Oshkosh Standard Specifications
5. Invitation for Quotations
6. Advertisement for Quotations
7. Contractor's Proposal
The contract documents are complementary; what is required by one is as binding
as if required by all. Before undertaking each part of the work, the Contractor shall
carefully study and compare the Contract Documents and check and verify all pertinent
figures and measurements required therein. Contractor shall promptly report in writing to
the Engineer any conflict, error, ambiguity or discrepancy which Contractor may discover
and shall obtain written clarification from the Engineer before proceeding with any work
affected thereby.
In the event that any provision in any of the above component parts of this contract
conflicts with any provision in any other of the component parts, the provision in the
component part first enumerated above shall govern over any other component part which
follows it numerically except as may be otherwise specifically stated.
IT IS HEREBY DECLARED, UNDERSTOOD AND AGREED that the word
"Contractor" wherever used in this contract means the undersigned contractor and their
legal representatives, successors and assigns.
IN WITNESS WHEREOF, the City of Oshkosh, Wisconsin, has caused this contract
to be sealed with its corporate seal and to be subscribed to by its City Manager and City
Clerk and countersigned by the Comptroller of said City, and the party of the second part
hereunto set its, his or their hand and seal the day and year first above written.
In the Presence of: CONTRACTOR
Demolition Contract - 2
(Seal of Contractor
if a Corporation.)
APPROVED:
( �
,�a �" �:.�G�1 �.I.�i1/�
.r . - � ; -
/ (
♦ � �� II� � � /
��� � �,
�
(Specify Title)
CITY OF OSHKOSH
By: /7a'—��` `'l�/!�
M ra�hloff, City Manager
And: �l/�1 W - �
Pamela R. Ubrig, City erk �
I hereby certify that the necessary provisions
have been made to pay the liability which
will accrue under this contract.
;�(�[%.1� �,(�,nrY�
City Comptroller
Demolition Contract - 3
EXHIBIT A
EXHIBIT A
QUOFATfON FOR
CfTY OF OSHKOSH , WISCONSIN
Price Quote On: Demoiifion and Removal af:
Address: 1233 Ceape Ave
Oshkosh WI 54901
Gross Cost of Projec#:
Less Salvage Value"*:
QlfO7ED PRfCE
� 8la�o =°
�—�
� �C� oo�
Quote for removing sanitary sewer lateral from property line to the Cify's main in the right of
way if necessary: $ 35U°—°
"` Describe: a) the objects and/or demoiition maferials expected fo be sold for sa(vage; b)
the value anticipated to 6e received; and, c) to whom fhe abjecfs/materia( �s expected to be
sold:
U /V KNO (n1 N
Demoliiion materiafs and debris wi11 be disposed of at (the City mvst be noiified of
any changes):
Name of Landfli: W I NKE c?�l 60 (�OUNT�
Address of LandfilL• lu U USff/ o fN
Operafor of Landfill: I� (.Cf2T � ifQ, 5 T£( N EQ
Operafar Address: I ��l C�"� R �
Telephone number: y2 U- Z3 2- 1 p'O'L
If contaminated/hazardous tanks, soil, or other materials are known fo be �resent, atfach a
separate page wifh disposal information for hazardous material.
I agree to complete the razing, removal, disposai, and sife restoraiion of the above
described property according to the requirements of 'the City's Request for Price
Quotations. I will not sfart work until all permits, licenses, and approvafs have been
obtained, and I have been nofified ihat all asbestos has been removed and the paperwork
has been completed relative to any asbestos work ihaf may need to be done. Based upon
my experience, 1 assert fhaf any salvage values idenfifled in this Quote represent fhe
highest NET value which could be obtained for these materials in fhe locaf area.
Demolition Quotafion Form - 1
EXF!lBIT A
initial here if you have reviewed Supplemental Conditions for this projecf, which are
atfached to fhe General Conditions as Exhibit B.
This price quotation shafl be valid for thirty (30) days from the City's due date for price
quotaftons.
(,� R c,�Y SC�P hn �� �� e
Name of Person, Firm, or Corporafion
l.��c�1.�„ � _ �C c..tn.�„rt.<��
Authorized Signature and Tit[e
i1��1 G '� � r2 ��, Sc
Print Name and Tifle
�ri �
i r2 `C"IZ � a f.
7 g�.l S�/ I S S ►2�
Address of Person, Firm, or Corporation
i�S�`�OS�-) �E/1 S��( �i0 "L
Cily State Zip Code
r���a h ��—a��
Telephone Number
demo(ition Quotation Form - 2