HomeMy WebLinkAbout09. 15-383AUGUST 25, 2015 15-383 RESOLUTION
(CARRIED___7-0_____LOST________LAID OVER________WITHDRAWN________)
PURPOSE: APPROVE & SUBMIT 2014 WISCONSIN DEPARTMENT OF
NATURAL RESOURCES COMPLIANCE MAINTENANCE ANNUAL
REPORT / WASTEWATER TREATMENT PLANT
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
BE IT RESOLVED by the Common Council of the City of Oshkosh that the 2014
Compliance Maintenance Annual Report, having been reviewed, is approved, and the
proper City officials are authorized and directed to submit the Report to the Department of
Natural Resources.
�
OIHKOIH
o� ��� wA.�a
MEMORANDUM
TO: Honorable Mayor and Members of the Common Council
FROM: Stephan M. Brand, Public Works Utility Bureau Manager ���
DATE: August 20, 2015
RE: 2014 Wisconsin Department of Natural Resources (WDNR) Compliance Maintenance
Annual Report for the Wastewater Treatment Plant
The City of Oshkosh is required by the WDNR as part of the Wisconsin Pollution Discharge Elimination
System Permit to complete a Compliance Maintenance Annual Report. This report outlines the
pertormance of the Wastewater Treatment Plant and sanitary sewer collection system for the previous
year. This report needs to be formally approved by the Common Council and submitted to the WDNR by
August 31, 2015.
ANALYSIS
The report is broken down into sections that address specific areas of performance for the wastewater
system. Based on the responses in each section, a score is determined and a letter grade is given based
on the score. This grade is used by the WDNR to determine the need for improvements to the wastewater
treatment system. A letter grade of an A or B does not require any action be taken based on the
information provided. The following is a brief summary of each section:
Influent Flow and Loadinq: This looks at plant flow capacity and treatment ability based on the design
of the facility. Our highest flow month for 2014 was May with a monthly average of 21.44 million gallons
per day, which is 61 percent of the design flow of 35 million gallons per day. Our normal months are
closer to 36 percent of design flow or an average of 12.7 million gallons per day. The treatment capacity
is based on Biochemical Oxygen Demand (BOD) in pounds per day. Our highest influent loading monthly
average was 15,842 pounds in the month of April. Our design loading is 33,360 pounds, which puts us at
47.0 percent of our design loading for the facility. Based on the available capacity of the facility, this
section scored a letter qrade A.
Effluent Qualitv — BOD TSS (Total Suspended Solidsl Ammonia and Phosphorus: Each of these
sections look at the quality of our treatment individually for each of these parameters based on our permit
requirements. There were no treatment issues for BOD, TSS, or Ammonia. In January, we exceeded our
1.0 mg/I Phosphorus monthly average with a monthly average of 1.02 mg/I. This was due to the extremely
low flows in January that affected our ability to feed enough chemical at low flow for phosphorus removal.
An adjustment to the chemical feed system for low flows corrected the situation and no other issues have
occurred. Due to this exceedance, the section for BOD TSS Ammonia Phosphorus scored a letter
rag de B,
I�.\Engineering\Tracy Taylor\Memos to Mayor 8 Common Counci1�2015�2�14 WONR WW�P Comp Main� Page 1 Of 2
Annual Report 8-2�-15.tlocx
Biosolids Manaqement: Solids are generated from the treatment process, due to the growth of the
microorganisms that are used for the treatment of wastewater. We have a separate process to treat this
material as it is removed and turn it into a product that can be beneficially re-used as fertilizer on
approved agricultural land. This section of the report looks at the treatment process and management of
the biosolids in compliance with the permit requirements. All requirements were met and this section
scored a letter qrade A.
Preventative Maintenance and Staffinq: This section asks general questions about plant maintenance
procedures, record keeping, and staffing levels. There were no issues identified with either plant
maintenance or staffing and this section scored a letter qrade A.
Operetion Certification: The WDNR requires that facilities have certified operators on staff to operate
and manage a wastewater treatment facility and that they attend approved conferences and training to
obtain continuing education credits for certification renewal every three years. We have certified
operators on staff who are certified at the appropriate levels for the wastewater treatment plant. This
section scored a letter qrade A.
Financial Manaqement: This section looks at the financial aspects of the utility and is done with the
assistance of the Finance Department. In addition to rates, it looks at the funding in the Equipment
Replacement Fund, which is required as a condition of the Clean Water Fund when financing projects
through the Clean Water Fund Financial Assistance Program. We also have started including projects
listed in the Capital Improvements Program in the Future Planning section to show future potential
spending requirements. There were no issues identified and this section scored a letter qrade A.
Collection Svstem: This section is completed using information provided by the Streets and Sanitation
Division and Engineering Division based on the activities reported for sanitary sewer maintenance and
construction in 2014. This section scored a lettergrade A.
Efforts are continuing to reduce clear water entry into the system. Flow monitoring and inspection of
manholes for rehabilitation continues, along with televising to identify sanitary sewers in need of
replacement. Sanitary sewer repairs and replacement projects are ongoing and are reflected in the
Capital Improvements Program. Work plans for the Capacity Management Operations and Maintenance
(CMOM) program and Sewer Evaluation and Capacity Assurance Plan (SECAP) are continuing to be
updated and refined for the 2015 program year. The CMOM work plan is providing opportunities to further
identify, define, and implement additional operation and maintenance activities related to the sanitary
sewer system. The SECAP project first phase modeling is completed. It is being used to analyze the
capacity of the sanitary sewer system under various dry and wet weather scenarios to determine where
there may be capacity issues and to look at corrective action opportunities. The second phase will include
collection of additional sanitary sewer information to be included in the model to further define and identify
capacity issues and corrective action opportunfties. This phase is schedufed for 2015.
RECOMMENDATIONS
I recommend approval of the 2014 Compliance Maintenance Annual Report for submittal to the WDNR.
Approved:
/y� �`-e��'v � (/
/ l
Mark A. Rohloff
City Manager
SMB/tlt
I\Engineering\Trecy Taylor\Memos lo Mayor & Common CounciP2015�2014 WDNR WW�P Gomp Maint
Annual Report 840-15.tloca
Page 2 of 2
Compliance Maintenance Annual Report
Last Updated:Reporting For:
OshkoshWastewaterTreatmentPlant
8/19/20152014
Influent Flow and Loading
1.MonthlyAverageFlowsand(C)BODLoadings
1.1Verifythefollowingmonthlyflowsand(C)BODloadingstoyourfacility.
OutfallNo.InfluentMonthlyxInfluentMonthlyx8.34=InfluentMonthly
701AverageFlow,MGDAverage(C)BODAverage(C)BOD
Concentrationmg/LLoading,lbs/day
January8.1527x187x8.34=12,736
February8.1297x190x8.34=12,862
March10.8096x158x8.34=14,285
April21.4411x89x8.34=15,842
May16.2651x94x8.34=12,719
June20.4862x82x8.34=14,088
July12.8292x123x8.34=13,156
August11.8773x131x8.34=13,019
September11.0259x127x8.34=11,642
October10.7808x134x8.34=12,056
November9.7005x133x8.34=10,748
December11.1210x130x8.34=12,094
2.MaximumMonthDesignFlowandDesign(C)BODLoading
2.1Verifythedesignflowandloadingforyourfacility.
DesignDesignFactorx%=%ofDesign
MaxMonthDesignFlow,MGD35x90=31.5
x100=35
Design(C)BOD,lbs/day33360x90=30024
x100=33360
2.2Verifythenumberoftimestheflowand(C)BODexceeded90%or100%ofdesign,points
earned,andscore:
MonthsNumberoftimesNumberoftimesNumberoftimesNumberoftimes
offlowwasgreaterflowwasgreater(C)BODwasgreater(C)BODwasgreater
Influentthan90%ofthan100%ofthan90%ofdesignthan100%ofdesign
January10000
February10000
0
March10000
April10000
May10000
June10000
July10000
August10000
September10000
October10000
November10000
December10000
Pointspereach2132
Exceedances0000
Points0000
TotalNumberofPoints0
Compliance Maintenance Annual Report
Last Updated:Reporting For:
OshkoshWastewaterTreatmentPlant
8/19/20152014
3.FlowMeter
3.1Wastheinfluentflowmetercalibratedinthelastyear?
YesEnter last calibration date (MM/DD/YYYY)
12-8-2014
No
IfNo,pleaseexplain:
4.SewerUseOrdinance
4.1Didyourcommunityhaveaseweruseordinancethatlimitedorprohibitedthedischargeof
excessiveconventionalpollutants((C)BOD,SS,orpH)ortoxicsubstancestothesewerfrom
industries,commercialusers,hauledwaste,orresidences?
Yes
No
IfNo,pleaseexplain:
4.2Wasitnecessarytoenforcetheordinance?
Yes
No
IfYes,pleaseexplain:
ThepretreatmentcoordinatorissuedNoticeofViolationlettersto3industriesin2014.Theyall
cameintocomplianceduringtheretestandwereneveratriskofbeingsignificantlynon
compliant.
5.SeptageReceiving
5.1Didyouhaverequeststoreceiveseptageatyourfacility?
Septic TanksHolding TanksGrease Traps
YesYesYes
NoNoNo
5.2Didyoureceiveseptageatyourfaclity?Ifyes,indicatevolumeingallons.
SepticTanks
Yesgallons
125,000
No
HoldingTanks
Yesgallons
24,635,850
No
GreaseTraps
Yesgallons
22,000
No
5.2.1Ifyestoanyoftheabove,pleaseexplainifplantperformanceisaffectedwhenreceiving
anyofthesewastes.
Nonegativeeffectsinplantperformancewerenoted.
6.Pretreatment
6.1Didyourfacilityexperienceoperationalproblems,permitviolations,biosolidsqualityconcerns,
orhazardoussituationsinthesewersystemortreatmentplantthatwereattributableto
commercialorindustrialdischargesinthelastyear?
Yes
No
Ifyes,describethesituationandyourcommunity'sresponse.
Compliance Maintenance Annual Report
Last Updated:Reporting For:
OshkoshWastewaterTreatmentPlant
8/19/20152014
6.2Didyourfacilityaccepthauledindustrialwastes,landfillleachate,etc.?
Yes
No
Ifyes,describethetypesofwastesreceivedandanyproceduresorotherrestrictionsthatwere
inplacetoprotectthefacilityfromthedischargeofhauledindustrialwastes.
TotalPointsGenerated0
Score(100-TotalPointsGenerated)100
SectionGradeA
Compliance Maintenance Annual Report
Last Updated:Reporting For:
OshkoshWastewaterTreatmentPlant
8/19/20152014
Effluent Quality and Plant Performance (BOD/CBOD)
1.Effluent(C)BODResults
1.1Verifythefollowingmonthlyaverageeffluentvalues,exceedances,andpointsforBODor
CBOD
OutfallNo.Monthly90%ofEffluentMonthlyMonthsofPermitLimit90%Permit
001AveragePermitLimitAverage(mg/L)DischargeExceedanceLimit
Limit(mg/L)>10(mg/L)withaLimitExceedance
January2522.55100
February2522.55100
March2522.56100
April2522.53100
May2522.52100
June2522.51100
July2522.51100
August2522.52100
September2522.51100
October2522.51100
0
November2522.52100
December2522.53100
*Equalslimitiflimitis<=10
Monthsofdischarge/yr12
Pointspereachexceedancewith12monthsofdischarge73
Exceedances00
Points00
Totalnumberofpoints0
NOTE:Forsystemsthatdischargeintermittentlytostatewaters,thepointspermonthly
exceedanceforthissectionshallbebaseduponamultiplicationfactorof12monthsdividedby
thenumberofmonthsofdischarge.Example:Forawastewaterfacilitydischargingonly6months
oftheyear,themultiplicationfactoris12/6=2.0
1.2Ifanyviolationsoccurred,whatactionwastakentoregaincompliance?
2.FlowMeterCalibration
2.1Wastheeffluentflowmetercalibratedinthelastyear?
YesEnter last calibration date (MM/DD/YYYY)
6-16-14
No
IfNo,pleaseexplain:
3.TreatmentProblems
3.1Whatproblems,ifany,wereexperiencedoverthelastyearthatthreatenedtreatment?
Nooperationalproblemsin2014.
4.OtherMonitoringandLimits
4.1Atanytimeinthepastyearwasthereanexceedanceofapermitlimitforanyotherpollutants
suchaschlorides,pH,residualchlorine,fecalcoliform,ormetals?
Yes
No
IfYes,pleaseexplain:
Compliance Maintenance Annual Report
Last Updated:Reporting For:
OshkoshWastewaterTreatmentPlant
8/19/20152014
4.2Atanytimeinthepastyearwasthereafailureofaneffluentacuteorchronicwholeeffluent
toxicity(WET)test?
Yes
No
IfYes,pleaseexplain:
4.3Ifthebiomonitoring(WET)testdidnotpass,werestepstakentoidentifyand/orreduce
source(s)oftoxicity?
Yes
No
N/A
Pleaseexplainunlessnotapplicable:
TotalPointsGenerated0
Score(100-TotalPointsGenerated)100
SectionGradeA
Compliance Maintenance Annual Report
Last Updated:Reporting For:
OshkoshWastewaterTreatmentPlant
8/19/20152014
Effluent Quality and Plant Performance (Total Suspended Solids)
1.EffluentTotalSuspendedSolidsResults
1.1Verifythefollowingmonthlyaverageeffluentvalues,exceedances,andpointsforTSS:
OutfallNo.Monthly90%ofEffluentMonthlyMonthsofPermitLimit90%Permit
001AveragePermitLimitAverage(mg/L)DischargeExceedanceLimit
Limit(mg/L)>10(mg/L)withaLimitExceedance
January30279100
February302710100
March302710100
April30277100
May30275100
June30275100
July30275100
August30278100
September30277100
October30277100
0
November302710100
December30278100
*Equalslimitiflimitis<=10
MonthsofDischarge/yr12
Pointspereachexceedancewith12monthsofdischarge:73
Exceedances00
Points00
TotalNumberofPoints0
NOTE:Forsystemsthatdischargeintermittentlytostatewaters,thepointspermonthly
exceedanceforthissectionshallbebaseduponamultiplicationfactorof12monthsdividedby
thenumberofmonthsofdischarge.
Example:Forawastewaterfacilitydischargingonly6monthsoftheyear,themultiplication
factoris12/6=2.0
1.2Ifanyviolationsoccurred,whatactionwastakentoregaincompliance?
TotalPointsGenerated0
Score(100-TotalPointsGenerated)100
SectionGradeA
Compliance Maintenance Annual Report
Last Updated:Reporting For:
OshkoshWastewaterTreatmentPlant
8/19/20152014
Effluent Quality and Plant Performance (Ammonia - NH3)
1.EffluentAmmoniaResults
1.1Verifythefollowingmonthlyandweeklyaverageeffluentvalues,exceedancesandpointsfor
NH3
OutfallNo.MonthlyWeeklyEffluentMonthlyEffluentEffluentEffluentEffluentWeekly
001AverageAverageMonthlyPermitWeeklyWeeklyWeeklyWeeklyPermit
NH3NH3AverageLimitAverageAverageAverageAverageLimit
LimitLimitNH3ExceedforWeekforWeekforWeekforWeekExceed
(mg/L)(mg/L)(mg/L)ance1234ance
January38.6371428570
February3814.5089285710
March3818.0967741940
April237.7637931030
May
June
July
August
September
0
October
November39.0770
December39.0650
PointspereachexceedanceofMonthlyaverage:10
Exceedances,Monthly:0
Points:0
Pointspereachexceedanceofweeklyaverage(whenthereisnomonthlyaverge):2.5
Exceedances,Weekly:0
Points:0
TotalNumberofPoints0
NOTE:LimitexceedancesareconsideredformothlyORweeklyaveragesbutnotboth.Whena
monthlyaveragelimitexistsitwillbeusedtodetectexceedancesandgeneratepoints.Thiswill
betrueevenifaweeklylimitalsoexists.Whenaweeklyaveragelimitexistsandamonthlylimit
doesnotexist,theweeklylimitwillbeusedtodetectexceedancesandgernatepoints.
1.2Ifanyviolationsoccurred,whatactionwastakentoregaincompliance?
TotalPointsGenerated0
Score(100-TotalPointsGenerated)100
SectionGradeA
Compliance Maintenance Annual Report
Last Updated:Reporting For:
OshkoshWastewaterTreatmentPlant
8/19/20152014
Effluent Quality and Plant Performance (Phosphorus)
1.EffluentPhosphorusResults
1.1Verifythefollowingmonthlyaverageeffluentvalues,exceedances,andpointsforPhosphorus
OutfallNo.001MonthlyAverageEffluentMonthlyMonthsofPermitLimit
phosphorusLimitAveragephosphorusDischargewithaExceedance
(mg/L)(mg/L)Limit
January11.011
February10.610
March10.610
April10.410
May10.310
June10.310
July10.210
August10.510
September10.310
October10.310
November10.410
December10.410
10
MonthsofDischarge/yr12
Pointspereachexceedancewith12monthsofdischarge:10
Exceedances1
TotalNumberofPoints10
NOTE:Forsystemsthatdischargeintermittentlytowatersofthestate,thepointspermonthly
exceedanceforthissectionshallbebaseduponamultiplicationfactorof12monthsdividedby
thenumberofmonthsofdischarge.
Example:Forawastewaterfacilitydischargingonly6monthsoftheyear,themultiplicationfactor
is12/6=2.0
1.2Ifanyviolationsoccurred,whatactionwastakentoregaincompliance?
TheplanthadFerricfeedproblemsduetotheextremelylowinfluentflowsthatwereoccurringat
nightwhichwerecausingourflowbasedFerricfeedsystemtounderfeedchemical,aswellas
pipingchangesthatweretakingplaceinpreparationforourphosphorousoptimizationplan.
ChangesweremadeinthePLCandinoperatingproceduressothatregardlessofhowlowour
influentflowsgoourpumpscan'trampdowntoofar,causingustounderfeedtheFerric.All
pipingchangeswerecompletedsothattherewerenoflowrestrictionsorinterruptions.
TotalPointsGenerated10
Score(100-TotalPointsGenerated)90
SectionGradeB
Compliance Maintenance Annual Report
Last Updated:Reporting For:
OshkoshWastewaterTreatmentPlant
8/19/20152014
Biosolids Quality and Management
1.BiosolidsUse/Disposal
1.1Howdidyouuseordisposeofyourbiosolids?(Checkallthatapply)
Land applied under your permit
Publicly Distributed Exceptional Quality Biosolids
Hauled to another permitted facility
Landfilled
Incinerated
Other
NOTE:Ifyoudidnotremovebiosolidsfromyoursystem,pleasedescribeyoursystemtypesuch
aslagoons,reedbeds,recirculatingsandfilters,etc.
1.1.1IfyoucheckedOther,pleasedescribe:
2.LandApplicationSite
2.1LastYear'sApprovedandActiveLandApplicationSites
2.1.1Howmanyacresdidyouhave?
576acres
2.1.2Howmanyacresdidyouuse?
acres
535
2.2Ifyoudidnothaveenoughacresforyourlandapplicationneeds,whatactionwastaken?
0
2.3Didyouoverapplynitrogenonanyofyourapprovedlandapplicationsitesyouusedlastyear?
Yes (30 points)
No
2.4Haveallthesitesyouusedlastyearforlandapplicationbeensoiltestedintheprevious4
years?
Yes
No (10 points)
N/A
3.BiosolidsMetals
Number of biosolids outfalls in your WPDES permit:
3.1Foreachoutfalltested,verifythebiosolidsmetalqualityvaluesforyourfacilityduringthelast
calendaryear.
OutfallNo.002-Cakesludge
Parameter80%H.Q.CeilingJanFebMarAprMayJunJulAugSepOctNovDec80%HighCeiling
ofLimitLimitValueQuality
Limit
Arsenic4175128.51112121100
Cadmium39851.6.711.9.9.6500
Copper1500430065050056054051051000
Lead30084030214329282700
Mercury1757.9.6.58.19.64.5200
Molybdenum6075138.79.716151400
Nickel33642027202725272800
Selenium80100<4.58.4<2.53.63.76.600
Zinc2800750066045064067063061000
3.1.1NumberoftimesanyofthemetalsexceededthehighqualitylimitsOR80%ofthelimitfor
molybdenum,nickel,orselenium=0
ExceedencePoints
0 (0 Points)
Compliance Maintenance Annual Report
Last Updated:Reporting For:
OshkoshWastewaterTreatmentPlant
8/19/20152014
1-2 (10 Points)
> 2 (15 Points)
3.1.2Ifyouexceededthehighqualitylimits,didyoucumulativelytrackthemetalsloadingat
eachlandapplicationsite?(checkapplicablebox)
Yes
No (10 points)
N/A - Did not exceed limits or no HQ limit applies (0 points)
N/A - Did not land apply biosolids until limit was met (0 points)
3.1.3Numberoftimesanyofthemetalsexceededtheceilinglimits=0
ExceedencePoints
0
0 (0 Points)
1 (10 Points)
> 1 (15 Points)
3.1.4Werebiosolidslandappliedwhichexceededtheceilinglimit?
Yes (20 Points)
No (0 Points)
3.1.5Ifanymetallimit(highqualityorceiling)wasexceededatanytime,whatactionwastaken?
Hasthesourceofthemetalsbeenidentified?
4.PathogenControl(peroutfall):
4.1Verifythefollowinginformation.Ifanyinformationisincorrect,ContactUs.
OutfallNumber:002
BiosolidsClass:B
BacteriaTypeandLimit:
SampleDates:01/01/2014-12/31/2014
Density:
SampleConcentrationAmount:
RequirementMet:Yes
LandApplied:Yes
Process:ANAER
ProcessDescription:Hydraulicdetentiontimegreaterthan15daysat
35degreescentigrade.
OutfallNumber:002
BiosolidsClass:B
BacteriaTypeandLimit:
SampleDates:01/01/2014-02/28/2014
Density:
SampleConcentrationAmount:
RequirementMet:Yes
LandApplied:No
Process:ANAER
ProcessDescription:Hydraulicdetentiontimegreaterthan15daysat
35degreescentrigrade.
Compliance Maintenance Annual Report
Last Updated:Reporting For:
OshkoshWastewaterTreatmentPlant
8/19/20152014
OutfallNumber:002
BiosolidsClass:B
BacteriaTypeandLimit:
SampleDates:03/01/2014-04/30/2014
Density:
SampleConcentrationAmount:
RequirementMet:Yes
LandApplied:No
Process:ANAER
ProcessDescription:Hydraulicdetentiontimegreaterthan15daysat
35degreescentigrade.
OutfallNumber:002
BiosolidsClass:B
BacteriaTypeandLimit:
SampleDates:05/01/2014-06/30/2014
Density:
SampleConcentrationAmount:
RequirementMet:Yes
LandApplied:Yes
Process:ANAER
ProcessDescription:Hydraulicdetentiontimegreaterthan15daysat
35degreescentigrade.
OutfallNumber:002
BiosolidsClass:B
BacteriaTypeandLimit:
SampleDates:07/01/2014-08/31/2014
Density:
SampleConcentrationAmount:
RequirementMet:Yes
LandApplied:Yes
Process:ANAER
ProcessDescription:Hydraulicdetentiontimegreaterthan15daysat
35degreescentigrade.
OutfallNumber:002
BiosolidsClass:B
BacteriaTypeandLimit:
SampleDates:09/01/2014-10/31/2014
Density:
SampleConcentrationAmount:
RequirementMet:Yes
LandApplied:Yes
Process:ANAER
ProcessDescription:Hydraulicdetentiontimeisgreaterthan15days
at35degreescentigrade.
Compliance Maintenance Annual Report
Last Updated:Reporting For:
OshkoshWastewaterTreatmentPlant
8/19/20152014
OutfallNumber:002
BiosolidsClass:B
BacteriaTypeandLimit:
SampleDates:11/01/2014-12/31/2014
Density:
SampleConcentrationAmount:
RequirementMet:Yes
LandApplied:Yes
Process:ANAER
0
ProcessDescription:Hydraulicdetentiontimegreaterthan15daysat
35degreescentigrade.
4.2IfexceededClassBlimitordidnotmeettheprocesscriteriaatthetimeoflandapplication.
4.2.1Wasthelimitexceededortheprocesscriterianotmetatthetimeoflandapplication?
Yes (40 Points)
No
Ifyes,whatactionwastaken?
5.VectorAttractionReduction(peroutfall):
5.1Verifythefollowinginformation.Ifanyoftheinformationisincorrect,ContactUs.
OutfallNumber:002
MethodDate:08/20/2014
OptionUsedToSatisfyRequirement:VSR
RequirementMet:Yes
LandApplied:Yes
Limit(ifapplicable):38
Results(ifapplicable):91.70
OutfallNumber:002
MethodDate:02/28/2014
OptionUsedToSatisfyRequirement:INC
RequirementMet:Yes
LandApplied:No
Limit(ifapplicable):
Results(ifapplicable):
OutfallNumber:002
MethodDate:12/31/2014
OptionUsedToSatisfyRequirement:INC
RequirementMet:Yes
LandApplied:Yes
Limit(ifapplicable):
Results(ifapplicable):
Compliance Maintenance Annual Report
Last Updated:Reporting For:
OshkoshWastewaterTreatmentPlant
8/19/20152014
OutfallNumber:002
MethodDate:02/19/2014
OptionUsedToSatisfyRequirement:VSR
RequirementMet:Yes
LandApplied:No
Limit(ifapplicable):38
Results(ifapplicable):55.90
OutfallNumber:002
MethodDate:04/02/2014
OptionUsedToSatisfyRequirement:VSR
RequirementMet:Yes
LandApplied:No
Limit(ifapplicable):38
Results(ifapplicable):62.90
OutfallNumber:002
MethodDate:04/30/2014
OptionUsedToSatisfyRequirement:INC
RequirementMet:Yes
LandApplied:No
Limit(ifapplicable):
Results(ifapplicable):
OutfallNumber:002
MethodDate:06/30/2014
OptionUsedToSatisfyRequirement:INC
RequirementMet:Yes
LandApplied:Yes
Limit(ifapplicable):
Results(ifapplicable):
OutfallNumber:002
MethodDate:06/11/2014
OptionUsedToSatisfyRequirement:VSR
RequirementMet:Yes
LandApplied:Yes
Limit(ifapplicable):38
Results(ifapplicable):57.40
Compliance Maintenance Annual Report
Last Updated:Reporting For:
OshkoshWastewaterTreatmentPlant
8/19/20152014
OutfallNumber:002
MethodDate:08/20/2014
OptionUsedToSatisfyRequirement:VSR
RequirementMet:Yes
LandApplied:Yes
Limit(ifapplicable):38
Results(ifapplicable):91.70
OutfallNumber:002
MethodDate:08/31/2014
OptionUsedToSatisfyRequirement:INC
RequirementMet:Yes
LandApplied:Yes
Limit(ifapplicable):
Results(ifapplicable):
OutfallNumber:002
MethodDate:10/31/2014
OptionUsedToSatisfyRequirement:INC
RequirementMet:Yes
LandApplied:Yes
Limit(ifapplicable):
Results(ifapplicable):
OutfallNumber:002
MethodDate:11/12/2014
OptionUsedToSatisfyRequirement:VSR
RequirementMet:Yes
LandApplied:Yes
Limit(ifapplicable):38
Results(ifapplicable):56
OutfallNumber:002
MethodDate:12/31/2014
OptionUsedToSatisfyRequirement:INC
RequirementMet:Yes
LandApplied:Yes
Limit(ifapplicable):
Results(ifapplicable):
Compliance Maintenance Annual Report
Last Updated:Reporting For:
OshkoshWastewaterTreatmentPlant
8/19/20152014
OutfallNumber:002
MethodDate:12/03/2014
OptionUsedToSatisfyRequirement:VSR
RequirementMet:Yes
LandApplied:Yes
Limit(ifapplicable):38
Results(ifapplicable):65.10
0
5.2Wasthelimitexceededortheprocesscriterianotmetatthetimeoflandapplication?
Yes (40 Points)
No
Ifyes,whatactionwastaken?
6.BiosolidsStorage
6.1Howmanydaysofactual,currentbiosolidsstoragecapacitydidyourwastewatertreatment
facilityhaveeitheron-siteoroff-site?
>= 180 days (0 Points)
150 - 179 days (10 Points)
120 - 149 days (20 Points)
0
90 - 119 days (30 Points)
< 90 days (40 Points)
N/A (0 Points)
6.2IfyoucheckedN/Aabove,explainwhy.
7.Issues
7.1Describeanyoutstandingbiosolidsissueswithtreatment,useoroverallmanagement:
Noissuesnoted.
TotalPointsGenerated0
Score(100-TotalPointsGenerated)100
SectionGradeA
Compliance Maintenance Annual Report
Last Updated:Reporting For:
OshkoshWastewaterTreatmentPlant
8/19/20152014
Staffing and Preventative Maintenance (All Treatment Plants)
1.PlantStaffing
1.1Wasyourwastewatertreatmentplantadequatelystaffedlastyear?
Yes
No
IfNo,pleaseexplain:
Couldusemorehelp/stafffor:
1.2Didyourwastewaterstaffhaveadequatetimetoproperlyoperateandmaintaintheplantand
fulfillallwastewatermanagementtasksincludingrecordkeeping?
Yes
No
IfNo,pleaseexplain:
2.PreventativeMaintenance
2.1DidyourplanthaveadocumentedANDimplementedplanforpreventativemaintenanceon
majorequipmentitems?
Yes (Continue with question 2)
No (40 points)
IfNo,pleaseexplain,thengotoquestion3:
2.2Didthispreventativemaintenanceprogramdepictfrequencyofintervals,typesoflubrication,
andothertasksnecessaryforeachpieceofequipment?
0
Yes
No (10 points)
2.3Werethesepreventativemaintenancetasks,aswellasmajorequipmentrepairs,recordedand
filedsofuturemaintenanceproblemscanbeassessedproperly?
Yes
Paper file system
Computer system
Both paper and computer system
No (10 points)
3.O&MManual
3.1DoesyourplanthaveadetailedO&MManualthatcanbeusedasareferencewhenneeded?
Yes
No
4.OverallMaintenance/Repairs
4.1Ratetheoverallmaintenanceofyourwastewaterplant.
Excellent
Very good
Good
Fair
Poor
Describeyourrating:
ThefacilitystaffinOshkoshareproactivewithoperations,facilitymaintenanceandequipment
maintenanceandrepairs.
Compliance Maintenance Annual Report
Last Updated:Reporting For:
OshkoshWastewaterTreatmentPlant
8/19/20152014
TotalPointsGenerated0
Score(100-TotalPointsGenerated)100
SectionGradeA
Compliance Maintenance Annual Report
Last Updated:Reporting For:
OshkoshWastewaterTreatmentPlant
8/19/20152014
Operator Certification and Education
1.Operator-In-Charge
1.1Didyouhaveadesignatedoperator-in-chargeduringthereportyear?
Yes (0 points)
No (20 points)
0
Name:
KEVINRSORGE
Certification No:
33081
2.CertificationRequirements
2.1InaccordancewithChapterNR114.08and114.09,WisconsinAdministrativeCode,whatgrade
andsubclass(es)wererequiredfortheoperator-in-chargetooperatethewastewatertreatment
plantandwhatgradeandsubclass(es)wereheldbytheoperator-in-charge?
Required:
4-ACEFGIJ;A-PRIMARYSETTLING;C-ACTIVATEDSLUDGE;E-DISINFECTION;F-
ANAEROBICDIGESTION;G-MECHANICALSLUDGE;I-PHOSPHORUSREMOVAL;J-
LABORATORY
0
Held:
4-ACEFGIJ;4-A=PRIMARYSETTLINGGRADE4;C=ACTIVATEDSLUDGEGRADE4;
E=DISINFECTIONGRADE4;F=ANAEROBICDIGESTIONGRADE4;G=MECHANICALSLUDGE
GRADE4;I=PHOSPHORUSREMOVALGRADE4;J=LABORATORYGRADE4
2.2Wastheoperator-in-chargecertifiedattheappropriateleveltooperatethisplant?
Yes (0 points)
No (20 points)
3.SuccessionPlanning
3.1Intheeventofthelossofyourdesignatedoperator-in-charge,didyouhaveacontingencyplan
toensurethecontinuedproperoperationandmaintenanceoftheplantthatincludesoneormore
ofthefollowingoptions(checkallthatapply)?
One or more additional certified operators on staff
An arrangement with another certified operator
An arrangement with another community with a certified operator
0
Anoperatoronstaffwhohasanoperator-in-trainingcertificateforyourplantandisexpectedto
becertifiedwithinoneyear
A consultant to serve as your certified operator
None of the above (20 points)
If"Noneoftheabove"isselected,pleaseexplain:
4.ContinuingEducationCredits
4.1Ifyouhadadesignatedoperator-in-charge,wastheoperator-in-chargeearningContinuing
EducationCreditsatthefollowingrates?
GradesT,1,and2:
Averaging 6 or more CECs per year.
Averaging less than 6 CECs per year.
Grades3and4:
Averaging 8 or more CECs per year.
Averaging less than 8 CECs per year.
TotalPointsGenerated0
Score(100-TotalPointsGenerated)100
SectionGradeA
Compliance Maintenance Annual Report
Last Updated:Reporting For:
OshkoshWastewaterTreatmentPlant
8/19/20152014
Financial Management
1.ProviderofFinancialInformation
Name:KenGabrielson
(XXX) XXX-XXXX
Telephone:920-232-5321
E-MailAddress
(optional):
2.TreatmentWorksOperatingRevenues
2.1AreUserChargesorotherrevenuessufficienttocoverO&Mexpensesforyourwastewater
treatmentplantAND/ORcollectionsystem?
Yes (0 points)
No (40 points)
IfNo,pleaseexplain:
2.2WhenwastheUserChargeSystemorotherrevenuesource(s)lastreviewedand/orrevised?
Year:
2014
0
0-2 years ago (0 points)
3 or more years ago (20 points)
N/A (private facility)
2.3Didyouhaveaspecialaccount(e.g.,CWFPrequiredsegregatedReplacementFund,etc.)or
financialresourcesavailableforrepairingorreplacingequipmentforyourwastewatertreatment
plantand/orcollectionsystem?
Yes (0 points)
No (40 points)
REPLACEMENTFUNDS[PUBLICMUNICIPALFACILITIESSHALLCOMPLETEQUESTION3]
3.EquipmentReplacementFunds
3.1WhenwastheEquipmentReplacementFundlastreviewedand/orrevised?
Year:
2014
1-2 years ago (0 points)
3 or more years ago (20 points)
N/A
IfN/A,pleaseexplain:
3.2EquipmentReplacementFundActivity
3.2.1 Ending Balance Reported on Last Year's CMAR$
1,873,203.60
$
3.2.2Adjustments-ifnecessary(e.g.earnedinterest,0.00
auditcorrection,withdrawalofexcessfunds,increase
makinguppreviousshortfall,etc.)
$
3.2.3AdjustedJanuary1stBeginningBalance1,873,203.60
3.2.4AdditionstoFund(e.g.portionofUserFee,
$
earnedinterest,etc.)+21,801.12
3.2.5SubtractionsfromFund(e.g.,equipment
replacement,majorrepairs-usedescriptionbox
$
3.2.6.1below*)-0.00
3.2.6EndingBalanceasofDecember31stfor
$
CMARReportingYear1,895,004.72
Compliance Maintenance Annual Report
Last Updated:Reporting For:
OshkoshWastewaterTreatmentPlant
8/19/20152014
AllSources:Thisendingbalanceshouldincludeall
EquipmentReplacementFundswhetherheldina
bankaccount(s),certificate(s)ofdeposit,etc.
3.2.6.1Indicateadjustments,equipmentpurchases,and/ormajorrepairsfrom3.2.5above.
3.3 What amount should be in your Replacement Fund?$
1,895,004.72
Pleasenote:IfyouhadaCWFPloan,thisamountwasoriginallybasedontheFinancial
AssistanceAgreement(FAA)andshouldberegularlyupdatedasneeded.Furthercalculation
0
instructionsandanexamplecanbefoundbyclickingtheHELPlinkunderInfointheleft-side
menu.
3.3.1IstheDecember31EndingBalanceinyourReplacementFundabove,(#3.2.6)equalto,or
greaterthantheamountthatshouldbeinit(#3.3)?
Yes
No
IfNo,pleaseexplain.
4.FuturePlanning
4.1Duringthenexttenyears,willyoubeinvolvedinformalplanningforupgrading,rehabilitating,
ornewconstructionofyourtreatmentfacilityorcollectionsystem?
Yes - If Yes, please provide major project information, if not already listed below.
No
ProjectProjectDescriptionEstimatedApproximate
#CostConstruction
Year
1AdditionalAerationBasin27000002020
22FinalClarifiers26000002020
3Digesterdrafttubemixers25000002018
4TreatmentPlantAutomation60000002015
5Rebuildtwoprimaryclarifiers3200002016
6WWTProoftopexhaustfanreplacementengineering1000002016
7WWTProoftopexhaustfanreplacement-construction5000002016
8InflowandInfiltrationStudycontinuationandimplementationofimprovementsfrom10000002015
previousyearsCIP.
9SanitarySewerImprovements50610002015
10Digester#1cleaningandpainting1200002015
11Computerandserverreplacement150002018
12MCC1-11replacement66000002017
13Replacegritclassifiers8500002016
14Waukauliftstationstudyanddesignconstruction9500002016
15Headworksmodifications1100002015
16NewFountainavenueliftstation40000002016
5.FinancialManagementGeneralComments
TotalPointsGenerated0
Score(100-TotalPointsGenerated)100
SectionGradeA
Compliance Maintenance Annual Report
Last Updated:Reporting For:
OshkoshWastewaterTreatmentPlant
8/19/20152014
Sanitary Sewer Collection Systems
1.CMOMProgram
1.1DoyouhaveaCapacity,Management,Operation&Maintenance(CMOM)requirementinyour
WPDESpermit?
Yes
No
1.2Didyouhaveadocumented(writtenrecords/files,computerfiles,videotapes,etc.)sanitary
sewercollectionsystemoperation&maintenance(O&M)orCMOMprogramlastcalendaryear?
Yes (Continue with question 1)
No (30 points) (Go to question 2)
1.3ChecktheelementslistedbelowthatareincludedinyourO&MorCMOMprogram.
Goals
Describethespecificgoalsyouhaveforyourcollectionsystem:
Systemwidecleaningeveryfiveyears,televisingmainsandlateralsonaregularbasis,
especiallyinolderpartsofthesystem,makingthenecessaryrepairsinidentifiedproblem
areas.
Organization
Doyouhavethefollowingwrittenorganizationalelements(checkonlythosethatapply)?
Ownership and governing body description
Organizational chart
Personnel and position descriptions
Internal communication procedures
Public information and education program
Legal Authority
Doyouhavethelegalauthorityforthefollowing(checkonlythosethatapply)?
Sewer use ordinanceLast Revised Date (MM/DD/YYYY)
11/26/2013
Pretreatment/industrial control Programs
Fat, oil and grease control
Illicit discharges (commercial, industrial)
Private property clear water (sump pumps, roof or foundation drains, etc.)
Private lateral inspections/repairs
Service and management agreements
Maintenance Activities (provide details in question 2)
Design and Performance Provisions
Howdoyouensurethatyoursewersystemisdesignedandconstructedproperly?
State plumbing code
DNR NR 110 standards
Local municipal code requirements
Construction, inspection, and testing
Others:
Overflow Emergency Response Plan:
Doesyouremergencyresponsecapabilityinclude(checkonlythosethatapply)?
Alarm system and routine testing
Emergency equipment
Emergency procedures
Communications/notifications (DNR, internal, public, media, etc.)
Capacity Assurance:
Howwelldoyouknowyoursewersystem?Doyouhavethefollowing?
Compliance Maintenance Annual Report
Last Updated:Reporting For:
OshkoshWastewaterTreatmentPlant
8/19/20152014
Current and up-to-date sewer map
Sewer system plans and specifications
Manhole location map
Lift station pump and wet well capacity information
Lift station O&M manuals
Withinyoursewersystemhaveyouidentifiedthefollowing?
Areas with flat sewers
Areas with surcharging
Areas with bottlenecks or constrictions
Areas with chronic basement backups or SSOs
Areas with excess debris, solids, or grease accumulation
Areas with heavy root growth
Areas with excessive infiltration/inflow (I/I)
0
Sewers with severe defects that affect flow capacity
Adequacy of capacity for new connections
Lift station capacity and/or pumping problems
AnnualSelf-AuditingofyourO&M/CMOMProgramtoensureabovecomponentsarebeing
implemented,evaluated,andre-prioritizedasneeded
Special Studies Last Year (check only those that apply):
Infiltration/Inflow (I/I) Analysis
Sewer System Evaluation Survey (SSES)
Sewer Evaluation and Capacity Managment Plan (SECAP)
Lift Station Evaluation Report
Others:
2.OperationandMaintenance
2.1Didyoursanitarysewercollectionsystemmaintenanceprogramincludethefollowing
maintenanceactivities?Completeallthatapplyandindicatetheamountmaintained.
% of system/year
Cleaning60.40
% of system/year
Rootremoval1.07
% of system/year
Flowmonitoring12
% of system/year
Smoketesting0
Sewerline
% of system/year
televising11.68
Manhole
% of system/year
inspections84.91
# per L.S./year
LiftstationO&M104
Manhole
% of manholes rehabbed
rehabilitation4.15
Mainline
% of sewer lines rehabbed
rehabilitation0.66
Privatesewer
% of system/year
inspections.88
PrivatesewerI/I
% of private services
removal.88
Pleaseincludeadditionalcommentsaboutyoursanitarysewercollectionsystembelow:
Compliance Maintenance Annual Report
Last Updated:Reporting For:
OshkoshWastewaterTreatmentPlant
8/19/20152014
3.PerformanceIndicators
3.1Providethefollowingcollectionsystemandflowinformationforthepastyear.
Total actual amount of precipitation last year in inches
42.76
Annual average precipitation (for your location)
31.53
Miles of sanitary sewer
266.354
Number of lift stations
16
Number of lift station failures
0
Number of sewer pipe failures
15
Number of basement backup occurrences
15
Number of complaints
161
Average daily flow in MGD (if available)
12.72
Peak monthly flow in MGD (if available)
643.23
Peak hourly flow in MGD (if available)
3.2Performanceratiosforthepastyear:
Lift station failures (failures/year)
0.00
Sewer pipe failures (pipe failures/sewer mile/yr)
0.06
Sanitary sewer overflows (number/sewer mile/yr)
0.00
Basement backups (number/sewer mile)
0.06
Complaints (number/sewer mile)
0.60
Peaking factor ratio (Peak Monthly:Annual Daily Avg)
50.6
Peaking factor ratio (Peak Hourly:Annual Daily Avg)
0.0
4.Overflows
LISTOFSANITARYSEWER(SSO)ANDTREATMENTFACILITY(TFO)OFERFLOWSREPORTED**
DateLocationCauseEstimated
Volume(MG)
Nonereported
**IftherewereanySSOsorTFOsthatarenotlistedabove,pleasecontacttheDNRandstopwork
onthissectionuntilcorrected.
5.Infiltration/Inflow(I/I)
5.1Wasinfiltration/inflow(I/I)significantinyourcommunitylastyear?
Yes
No
IfYes,pleasedescribe:
5.2Hasinfiltration/inflowandresultanthighflowsaffectedperformanceorcreatedproblemsin
yourcollectionsystem,liftstations,ortreatmentplantatanytimeinthepastyear?
Yes
No
IfYes,pleasedescribe:
5.3Explainanyinfiltration/inflow(I/I)changesthisyearfrompreviousyears:
Weexperiencedlesshighintensity,longdurationraineventsin2014.Thisreducedtheimpact
ofwetweatherfloweventsonthefacility.
Compliance Maintenance Annual Report
Last Updated:Reporting For:
OshkoshWastewaterTreatmentPlant
8/19/20152014
5.4Whatisbeingdonetoaddressinfiltration/inflowinyourcollectionsystem?
Continuedcommitmenttosanitarysewercleaning,televising,sewerlinereplacementduring
streetconstruction,manholerehabilitationprogram,addressingprivatesewerlateral
replacementwhenissuesarediscovered,stormwatermanagementprogramCMOMandSECAP
programs.
TotalPointsGenerated0
Score(100-TotalPointsGenerated)100
SectionGradeA
Compliance Maintenance Annual Report
Last Updated:Reporting For:
OshkoshWastewaterTreatmentPlant
8/19/20152014
Grading Summary
WPDES No: 0025038
SECTIONSLETTERGRADEGRADEPOINTSWEIGHTINGSECTION
FACTORSPOINTS
InfluentA4312
BOD/CBODA41040
TSSA4520
AmmoniaA4520
PhosphorusB339
BiosolidsA4520
Staffing/PMA414
OpCertA414
FinancialA414
CollectionA4312
TOTALS37145
GRADEPOINTAVERAGE(GPA)=3.92
Notes:
A = Voluntary Range (Response Optional)
B = Voluntary Range (Response Optional)
C = Recommendation Range (Response Required)
D = Action Range (Response Required)
F = Action Range (Response Required)
Compliance Maintenance Annual Report
Last Updated:Reporting For:
OshkoshWastewaterTreatmentPlant
8/19/20152014
Resolution or Owner's Statement
NameofGoverning
BodyorOwner:
DateofResolutionor
ActionTaken:
ResolutionNumber:
ACTIONSSETFORTHBYTHEGOVERNINGBODYOROWNERRELATINGTOSPECIFICCMAR
SECTIONS(OptionalforgradeAorB.RequiredforgradeC,D,orF.Regardlessofgrade,required
forCollectionSystemsifSSOswerereported):
InfluentFlowandLoadings:Grade=A
EffluentQuality:BOD:Grade=A
EffluentQuality:TSS:Grade=A
EffluentQuality:Ammonia:Grade=A
EffluentQuality:Phosphorus:Grade=B
BiosolidsQualityandManagement:Grade=A
Staffing:Grade=A
OperatorCertification:Grade=A
FinancialManagement:Grade=A
CollectionSystems:Grade=A
ACTIONSSETFORTHBYTHEGOVERNINGBODYOROWNERRELATINGTOTHEOVERALLGRADE
POINTAVERAGEANDANYGENERALCOMMENTS(OptionalforG.P.A.greaterthanorequalto3.00,
requiredforG.P.A.lessthan3.00)
G.P.A.=3.92