BE IT RESOLVED by the Co�nn Council of the City of Oshkosh that the .
£ollaaing Change Order with regard to the F�nrnration of Pollock NY3mrial Pool
is hereby approved.
QIANC� ORDER NO.
KUBIAK POOIS
835 Potts Avenue
Green Bay, ��II 54304
Total Net Deduct -
(See attach_�cl sheet for breakdaan)
$1,823.28
BE IT F'LTKI'fIER RESOLVED by the Cainron Co�mcil o£ the City of Oshkosh
that the afoxe�ntioned Change Order is hereby approved; a copy of which is
attached to this resolution.
" ;,,.-. � F 1 ___ . .
- 15 -
�
t �
C���G� Distribution to:
OQD�:e OWNER �
AIA DOCUMENT G707 ARCHITECT p
CONTRACTOR p
FIELD �
OTHER ❑
PROIECT: Renovation Pollock Memorial Pool
(name, address) Oshkosh, Wi sconsi n
TO (Contrattor):
� Kubiak Pools �
835 Potts Avenue
Green Bay, Wisconsin 54304
�
CHANGE ORDER NUMBER
fNiTIATION DATE:
�
<� ' r
�
ARCHITECT'S PROJECT NO: 313
CONTRACT FOR: General Construction
Mechanical and Electrical
� CONTRACT DATE: JUIy 5, 1979
You are directed to make the following changes in this Contract:
:. Provide one 3" and one 4" PVC conduit for new electric service
from existing power pole to new mechanicai building.
2. Trenching, disposal of earth, furnishing and compacting crusfied
stone backfill for the above two conduits.
3. Cost for electrical service from Wisconsin Public Service
Corporation.
4. Credit for electrical service allowance.
5. Add9tional 1" conduit for telephone service required because
telephone is serviced from the west. The existing line had
to be removed for demolition.
6. Change the deck reinforcing from 6 x 6/10 x 10 mesh to A4 bars
at 16" o.c. each way at the center of the slab.
7. To leave the chain link fence in place tvhere it is mounted on
top of the concrete wall at the southeast corner of the pool
enclosure.
Net change
+ $1700.00
+ 1440.00
+ 242.72
- 6000.00
{ 144.00
+ 1160.00
- 510.00
- $1823.28
Not valid until signed by both die Owner and Architect.
Signature nf ihe Contractor indicates his agreement hercwi,h, induding any adjustment in tfie Controct Sum or Contract Time.
The original (Contract Sum) (6uarawteadb3axisuurxa..C,osy v,,as .........
.................. S
Net change by previously aut6orized Change Orders ............................
......• S
The (Contract Sum) (CNaraat�dl�Aaxi�a�aqr-Ccr,,�) prior to this Change Order w. s..........
The (Contr, ct Sum) (t'.�ra�,}citec�J-1.qaMR,w�� EAu} w��� be {iaerea�{} (decreased) (cmckar�,,ed)
by this Change Order .....................
The new (Contrad Sum) (G,aaraaEec�lvia�iraya}{_-�) induding this Change Order will be ... 5
The Contract Time will be (is�rzased; �dx�sea;ed) (unchanged) by
The Date of Substantial Comp•.etion as of the date of this Change Order therefore is
519,755.00 ,
76,548.00 ,
443,207.00 _
(1,823.2II) ,
R41,383.72 .
( ----y Days.
Authorized:
Cha�a�_ ariSh�Raa�rh At�o C.C, Kubiak Pools City of Oshkosh
ARCHI CCT � CON CTfJR -
i�t nlnrth Rrna�i�.�a�� ���S.Potts Flvenue °�'1`�RChurch Avenue
Address Address —
Addrecs
� �sconsin ' Green Bav Wisconsin Oshkosfi, 4lisconsin
. /���
BY
RY
7E
AIA DOCUMkYT WOT • CHANGE ORDER �PRIL 1970 EDFGON AIA°' •� O 197II
THE AMERICAN INSTITU7E OF ARCt�ITECTS, 1735 NEW YORK AVE., N.1N.; WqSHWGTO�, D,C. ZIN706
BY
DATE
G701 —'1976
�
�
�
�
�
vy
.`�c a
v �
a7 O
oO
w
. %+ "�
� a U
...,.�, (�d �
�� o �
'�;''a°,
O S+
.r{ O
A� w
� � .
�
N '� �
� O N
ti
�
�
6
.V .
o y
d�
�,
�
H U
�
O
ry-f
!-�
O
�
� �
ti �,
� �
�, N,
� ��
r+ �'
�
�
�+ ��- r�
� ,
o �'
UC`.�+ r�1
� ,� U
�� r
�, 5
� �