Loading...
HomeMy WebLinkAbout30945 / 80-21September 18, 1980 Il 21 RESOLUTION PURPOSE: CHANGE ORDER TO BUS G�3GE RENOVATION INITIATED BY; OSH[COSH TRANSIT SYSTEM BE IT RESOLVED by the Common Council of the City of Oshkosh that the followine Change Or1ar to Contract far bu� ga_.aoe renovation is hereby apptoved: C[iANGE ORDER N0. P-HVAC-2 - Adding the a�ount of $2,395.00 E.C. MERRILL, INC. 804 Witzel Avenue, Oshkosh, WI 54901 Purpose• SEE ATTACHMENT "A" BE IT FURTHER RESOLVED by the Common Council of the City of Oshkosh that the aforementioned change order is hereby approved; a copy of which is attached to this resolution. BE IT FURT3ER RESOLVED that money for this purpose is hereby appropriated from Account No. 729-999, Bus Utility--Bus Garage and Maintenance Facility, all within the 1980 budget. SI1Et-4ITP�D BY i.PF�OUN,D /�%aL�/ /V • /C�t�_GC`.XKtir� - 21 - YARBRO - KEMPINGER ARCHITECTS 101! WEST SOUTN PARK AVENUE BO% ZOG6 1/{1�12]S-]]10 OSNNOSH, WISCONSIN 5690] ATTACHMENT "A" Change Order P-HVAC-2, File 7932, September 19, 1980 Provide an extension of the completion date to February 6, 1981 ....... ............... ......... Contractor`s letter of August 1, 1980�and Architect's letter of August 5, 1980 are attached. Provide revisions to existinq piping as required by job conditions and new equipment, in area of door No. 1038, door No. 107E, and at bus wash area ....... ... ......... ........ ... ......... Architect's letter of July 1�, 1980 is enclosed. (a future change order will tabulate and finalize the above T&M changes) Provide a backflow preventer at the bus wash equipment in accordance with code ................ Contractor's proposal of September 5, 1980, Architect's request of August 7, 1980, Drawing No. P-101 dated August 7, 1980 and Drawing No. P-102 dated August 7, 1980 are attached. � No Change Time & Material $ 2,395.00 NET ADD $ 2,395.00 YARBRO - KEMPINGER ARCNITECTS 101! WEST $OUTM PARK AVENUE BO% 209E 1/�1117]S-]J10 OSHKOSN, WISCONSIN 5�907 9 September 1480 E.C. Merrill, Inc. 804 Witzel Avenue Oshkosh, Wisconsin 54901 Attn: Mr. Tom Gabert RE: File 7932 Bus Garage Oshkosh, Wisconsin Mr. Gabert: � Enclosed are three (3) copies of Change Order No. P-HVAC-2, dated September 19, 1980. This change order covers a number of items, as itemized within the change order. Some of these were previously authorized in writing, to proceed. Other items are, in essence, being approved to proceed, via this letter. All of these changes are, of course, not 1008 final until the City Council approves them. This change order No. P-HVAC-2 should be going to the City Council on Thursday, September 18, 1980. Please sign all copies and have them back in our office before September 18, 1980. If you have any questions, feel free to call. Respectfully, YARBRO-hEMP2NGER, ARCHITECTS by ��1� Richard J. Kempinger RJK/lz Enc. cc: GM� k Huddleston w/copy of Change Order P-HVAC-2, for use in passing on to City Clerk and City Attorney's office, to prepare for Council meeting. n rw. � _�`: v r. . � i� � � .. , I 804 WITZEL AVENUE OSHKOSH, WISCONSIN 54901 Au�vst 1, 1980 I� �� �� �4 y`� � u �v � Yarbro—Eempinger drehitects r.o, sox 2oy6 Osh.:cosh, uisconsin 54903 i�: File ?932 Bus Garage Oshkosh. Wisconsin 54901 Attention: �ick Kempinger Dear Mr. Kempinger: CUSTOM STAINLESS SPECIALIST DIAL: 235 - 3600 ��LC. �rt� �i . • • • • R '��fe would like to request at this time an exteasion of time amounting to five wecks and two dc�ys for the above project. This request is to coincide vith th� request by rluor Brothers Construction Coapany. The new completion date would be P'ebn�ary 6, 19F31. Plense let us Imow if this will be appropriately approved. Thflnk you very mucb. Sincerely yours, L}1,��11(C.�. %)(t'ra((C� il)1(j� itussell r^.. tderrill � President cc: Mark Hudnleston Heating - Air Conditioning • Plumbing • Pomer Process Piping • Sprinkler Piping • Pipe Fabrication �'rARBRO - KEMPINGER ARCHITECTS 101� WCST SOUTN PAHK AVENUE EO% 70Y6 11�1�/3]6-]�10 OSNKOSN. WISCON3IN 6�00� 5 August 1980 E.C. Mcrrill, Inc. 804 Witzel Avenue Oshkosh, Wisconsin 54901 RE: File 7932 - Bus Garage Oshkosh, Wisconsin Gentlemen: � with reference to your letter of August 1, 1980, the completion date on the above project will be extended to February 6, 1981. An official change order as such will be written at a later (j3tE'. R�:pectfully, YARIIRO-KEMPINGER� ARCHITECTS , by I:ichard J. Kempinger RJK/1z cc: Mr. Mark Huddleston �ARBRO - KEMPINGE� ARCHITECTS 101t WEST SOUTM PARI( AVENUE !O% 7096 11�1�/3�5•»70 OSNNOSN, WISCOHSIX 6lY07 10 Ju1y 1980 E.C. Merrill, Inc. $04 Witzel Avenue Oshkosh, Wisconsin 54901 Attn: Mr. Tom Gabert RE: File 7932 Bus Garage Oshkosh, Wisconsia Mr. Gabert: � � Following is 1n regard to our field observations of July 10, 1980: 1.. Where the existing 3" dia. roof conductor piping from Room 102 passes thru the wall above Door i/I03B into Aoom 0103, disconnect tlie piping as required so that Fluor Bros. can install the new steel lintel in that area. Temporarily discharge the pipe to the esterior as necessary. When reconnecting the conductor, run ttie pipe underneath the lintel at the opening. Hold the pipe as hlgh as possible. In esaence, the replacement piping in this small area and also in the area above Door lC103A vill be lower than as shown on the original drawings. Coordinate the height and location of this piping wi[h the new door at opening Ii103A. If there is extra time and material involved in ttie installation, due to the new height, keep zecords of iC, and submit your T6M billing in a breakdown form. This extra work, if a�, will then be written into a changa order at a later date. prior to the end of the project. , 2. At tiie southwest corner of Room 0107 it became evident [hat a vent line exists in the area of Door I1107E. We checked wlth Marv tii�ley, Plumbing Inspector, who determined that it will be necessary Co relocate this vent. As ve had discussed in the field, extend this vent over to the west, under the floor, and rise up veriically west of Door li107E as necessary. Co- ordinate the location of the verCical riser wi[h Fluor Bzos nnd Town and Country Electric, so that the pipe does no[ interfere wlth the track mechanism or the electrical components. Where the floor must 6e removed, do so by saw-cutting. Pro- vide corapacted fill and concrete floor patching per specifications. Perform work on a T&M basis. At completion submit your billing in breakdown form. This extra work will be written into a change order at a later date, prior to the end of the project. YARE3R0 - P(E=MPINGE� � ARCHI7ECTS � IO1J WEST SOUTM VARK AVENUE BOX 30i6 f/�i�ll�5•73/0 OSMNOSN, WISCONSIN Sf90� 2 5'+ret No 10 July 1980 Mr. Tom Cabert E.C. Merrill, Inc. RE: File 7932 3. At the existing wall between Rooms 11102 and 103, plans indicated that the existing cold water line was to be removed and rehung from the ceiling at the height indicated�by you the Plumbing Contractor. Kienast removed the pipe in queation, apparently so they and Fluor Bros. could work in that area. Plans and specs, plus the preconstruction mee[ing minutes, clearly in- dicated that proper coordination of such work muat be conduc[ed be[ween the Trades. You indicated that if Kienast will provide code acceptable replacement pipe E.C. Merrill will install the pipe. We were asked to determine what size pipe is actually needed in this area. The supply piping required for the paz- ticular bus wash purchased by the Owner is 2-1/2" @ 40 P.S.I.C. The following has been determined by our Plumbing Consultant. Don liammer, hased on preasure available at the site: A. The existing east-west 3-1/2" line in Room p103 tha[ was removed prematurely must be replaced with a pipe size of 2-1/2" min. (or larger at contractor's option). The co- ordination and cost of this inatallation muat be handled by E.C. Merrill and Kienast. B. The new north-south water piping which extends from the pipe ln Room Ii103, per article A above, to the location of tt�e bus wash in Room 0101, ia to be changed from 1-1/2" to 2-1/2" due to the requirement of the particular bus vash equipment being furnished. The 1" feed to the water heater can remain. Change [he valves, shock stops, sleeves, etc. as necessary. The extra material involved in this change is to be charged on a T&M basis. Submit your billing for this item in a breakdown form and a change order will be written at a later date, prior to the end of the project. YARBRO - KEMPINGER� ARCHITECTS 1018 WEST SOUTM PARK AVEHUE BO1[ 1096 V�Ul176•J310 OSNNOSM, WISCONBIN {�907 0 tin2rtNO ._3_. 10 July 1980 Mr. Tom Cabert E.C. Merr312, Inc. RE: File 7932 0 If there are any questiona on the above, feal free to call. Respectfully, YARBRO-KEMPINGER, ARCHITECTS by ��� �� Richard J. Kempinger RJK/lz cc: Mr. Mark Huddleston Kienast Utility Constructioa Co. Fluor Bros, Town and Countiy Mr. Don Hammer � � „__ �.s -_--- — �r�T.��l,�al ]�ai•:�r P.U. Elox 2096 Architects :)shi;osh, 7iisconsin ♦NCIUtIC�"� Lick �enpin�-er We nereDy suDmit specdmal�ons a� E. C. MERRILL, INC. 804 Witzei Avenue OSHKOSH, WISCONSIN 54901 (414) 235-3600 D�S[ Of PLANS PHONE Oshkosh Bus JOB IOCR�ON ragv i�v. o� Se�tember 5, 1980 File �7932 lOB VNONE � _ _ Furniehing & Installing 2- 2” Backflow Preventers In Lieu Of 1- 2-2 �eckflow Preventer. To Include All Necessary Piping, Fittings, Valves, Drain, Strainers, Labor„&.,,Testing For The Sua OY . _ 240o thousand, three hundred ninety-five dollars ($2.395.�0). _._ .. _ Above Price Based On Your Sketch P-101 & P-102. �� �C �CD�It�flC hereby to lurnish material and labor — complete in accordance with above specilicaUOns, for the sum oC T�,�o thousand, three hundred ninety-five dollars and no�100 centa dollars(S 2.395•00 � (':�vmc�l lo �e made as lultows �. 'I bi m�tenal n qunnnterE �o Ce n spec�hetl �II wOrM lo �e complete0 in a wo�kmanhFe � mrnner eccor0�ny W stm�arn pncuc<s Any aLL<�at�on or tlevmnon Imm aCOVe so<ui�<o- Author¢etl I� t�om �:.vninng nva msts w�u Oe e.rcutea oNy upon �nllen o.a<�i, ,�a wm Decome an $�gndWte j e•��a c�argr over anU aDOVe Ihe eslimete /.II agreemenb co��ingenl upon shiFei, acUOenb or eei.ys teyone our convol Owne� to urry hre, tornaao ana ome� necessary mzu.anc< Note: ThiS propo5al may �e �,\0.�. Wa .ers a�e �wiy cove.ee ey wa���,en's Compensai�on insu�ance. wdhdrawn by us d not a<cepted within � _. .__—:—._ r li �((��}ilaiirrnf�Jr��pnsttl—Th�.,oa��pr�rrs.specilir,itinns n..d �on.�,liom .uc s.�li.l.�c�ory .uid �re �erebY attepted. Vnu are aul�onecd $'gnature lo �lu It�r..orA es apcal�ed Peyn�cnt wJl �e maCe as outhned a�ova � I\I\ Da�r nl Arrr;tlanrc Signature 0 -- "'�"' " --��—aT- m�� n� cu...w�r u.o .a. uou+u �uai.u� aurt.. �.c u.oro.. uu� ouw 3� tlays. YARBRO - KEMPINGER ARCNITECTS /01/ WEST SOUTN VARK AVENUE BOX tOGb tU11/7J6•J710 OSNI(OSM. WISCONSIN 3�907 7 August 1980 Mr. Tom Gabert E.C. Merrill, Inc. 804 Witzel Avenue Oshkosh, Wisconsin 54901 RE: File 7932 - Bus Garage Oshkosh, Wisconsin Mr. Gabert: When our plumbing drawings were prepared for the bus wash area, they were based on a bus wash manufacturer that the Owner anti- ci.pated they would be purchasing from. Thru the bidding process the Owner ended up purchasing a bus wash as manufactured by another firm, Ross and White. As per the original drawings, you are required to make the final connection to the Ross and White equipment. Enclosed is a set of Ross and White shop drawings, identified as Contract 8013. These drawings are for your use in coordinating your work in this area. Due to the fact that the Ross and White equipment does not come with a backflow preventer, it will be necessary to install such an assembly under your contract. Enclosed are three (3) copies each of Drawings P-101 and P-102 showing the necessary piping required in this area. Please submit a proposal in breakdown form, on your letterhead, for this requested additional work. Respectfully, YARBRO-KEMPINGER� ARCHITECTS by _ Richard J. Kempinger RJK/lz Enc. cc: Mark Huddleston w/copy of P-101 and P-102 YARBRO - KEMPINGER ARCHITECTS IOiB WEST SOUTH VARK AVENUE BOX 2096 11i141135-3�10 OSHKOSM. WISCONSIN 56901 P-HVAC-2 7932 CHANGE ORDER NO. . . .. _._ FILE NO. -___..____ OWNER'S COPY/ � 19 September 1980 DATE ------------ � City of Oshkosh, Wisconsin OWNEFi: . _ — - - - - -� ------------- E.C. Merrill, Inc. CONTRACTOR: 804 W1tZe1 Avenue, Oshkosh, Wisconsin Plumbing, Heating-Ventilating & Air Conditioning Work CONTRaC7FOR: Addition & Alterations, Bus Garage, Oshkosh Transit System, 926 Dempsey Trail, Oshkosh, Wisconsin IT IS HEREBV MUTUALLV AGREED THAT THE FOLLOWING CHANGE IN THE WOFK AS COMPRISED IN THE ORIGINAL 6 June 1980 CONTRACT DATED _____________ _.__.__SHALL BE COMPIETED IN ACCORDANCE WITH THE CONTRACTOR'S proposals stated below, Architect's requests stated below, and ' area • ��=z ^T -9 TI IE iFflM1'6 G�f SI IG CCC"�,or.z subject to the terms of the contract. FOR THE SUM OF is 2,395.00 PRIOR TO THIS ORDEA THIS OFDER SEE ATTACHMENT "A" TWO TAOUSAND THREE HUNDRED NINTY-FIVE & NO/100TH5 . . .. . .. . . . _ . . . . _ ... . . _._ _.-___._. _ . DOILAFS TOTAL TO DATE ORIGiNA�CONTRAGT EXTRA ORDERS - CREDIT ORDEFS ) ADOED TO'. 9E�Bk19�E�B�Fii9M CONTqACT. ADD $2�%��.�� $2,395.00 DEDUCT NONE NONE $5,095.00 NONE $124,664.00 APPROVED YARB�O- PINGER CITY ATTORNEY � A � HITE S aY I�/� - , --- By- — ACCEPT E. . MERRILL, INC. By 5, 095 _00__ exceed) � By NONE � Clty �'�'A'Manager City Clerk NET TOTAL TO DATE $129, 759. �� _ _ _ __ exceed) By _�,�.City Comptroller r-I N � ty N N 1 'O U F 6 O �r x �� ao a � i � � � � U O �i o > f� O Aa, N �s a o a� � � � � Ca O N ,-� c� N � � � � om m a� o a +� ti � y N � ¢ l� • a� o a� z� +-+ s s� � O ¢1 H v � 0 � a� 0 � 0 � rn � � ri Ci N � a� � a � � )y ��' s.� F+ i r� 7 U � � ,i U