HomeMy WebLinkAbout30945 / 80-21September 18, 1980
Il 21 RESOLUTION
PURPOSE: CHANGE ORDER TO BUS G�3GE RENOVATION
INITIATED BY; OSH[COSH TRANSIT SYSTEM
BE IT RESOLVED by the Common Council of the City of Oshkosh that the
followine Change Or1ar to Contract far bu� ga_.aoe renovation is hereby apptoved:
C[iANGE ORDER N0. P-HVAC-2 - Adding the a�ount of $2,395.00
E.C. MERRILL, INC.
804 Witzel Avenue, Oshkosh, WI 54901
Purpose•
SEE ATTACHMENT "A"
BE IT FURTHER RESOLVED by the Common Council of the City of Oshkosh that
the aforementioned change order is hereby approved; a copy of which is attached
to this resolution.
BE IT FURT3ER RESOLVED that money for this purpose is hereby appropriated
from Account No. 729-999, Bus Utility--Bus Garage and Maintenance Facility, all
within the 1980 budget.
SI1Et-4ITP�D BY
i.PF�OUN,D /�%aL�/ /V • /C�t�_GC`.XKtir�
- 21 -
YARBRO - KEMPINGER
ARCHITECTS
101! WEST SOUTN PARK AVENUE
BO% ZOG6 1/{1�12]S-]]10
OSNNOSH, WISCONSIN 5690]
ATTACHMENT "A"
Change Order P-HVAC-2, File 7932, September 19, 1980
Provide an extension of the completion date to
February 6, 1981 ....... ............... .........
Contractor`s letter of August 1, 1980�and
Architect's letter of August 5, 1980 are
attached.
Provide revisions to existinq piping as required
by job conditions and new equipment, in area of
door No. 1038, door No. 107E, and at bus wash
area ....... ... ......... ........ ... .........
Architect's letter of July 1�, 1980 is
enclosed. (a future change order will
tabulate and finalize the above T&M changes)
Provide a backflow preventer at the bus wash
equipment in accordance with code ................
Contractor's proposal of September 5, 1980,
Architect's request of August 7, 1980,
Drawing No. P-101 dated August 7, 1980 and
Drawing No. P-102 dated August 7, 1980 are
attached.
�
No Change
Time & Material
$ 2,395.00
NET ADD $ 2,395.00
YARBRO - KEMPINGER
ARCNITECTS
101! WEST $OUTM PARK AVENUE
BO% 209E 1/�1117]S-]J10
OSHKOSN, WISCONSIN 5�907
9 September 1480
E.C. Merrill, Inc.
804 Witzel Avenue
Oshkosh, Wisconsin 54901
Attn: Mr. Tom Gabert
RE: File 7932
Bus Garage
Oshkosh, Wisconsin
Mr. Gabert:
�
Enclosed are three (3) copies of Change Order No. P-HVAC-2, dated
September 19, 1980.
This change order covers a number of items, as itemized within
the change order. Some of these were previously authorized in
writing, to proceed. Other items are, in essence, being approved
to proceed, via this letter.
All of these changes are, of course, not 1008 final until the
City Council approves them. This change order No. P-HVAC-2
should be going to the City Council on Thursday, September 18,
1980. Please sign all copies and have them back in our office
before September 18, 1980.
If you have any questions, feel free to call.
Respectfully,
YARBRO-hEMP2NGER, ARCHITECTS
by ��1�
Richard J. Kempinger
RJK/lz
Enc.
cc: GM� k Huddleston w/copy of Change Order P-HVAC-2, for use in
passing on to City Clerk and City Attorney's
office, to prepare for Council meeting.
n rw.
� _�`: v
r. . � i� � � ..
, I
804 WITZEL AVENUE
OSHKOSH, WISCONSIN 54901
Au�vst 1, 1980
I� �� ��
�4 y`�
� u �v �
Yarbro—Eempinger drehitects
r.o, sox 2oy6
Osh.:cosh, uisconsin 54903
i�: File ?932
Bus Garage
Oshkosh. Wisconsin 54901
Attention: �ick Kempinger
Dear Mr. Kempinger:
CUSTOM STAINLESS SPECIALIST
DIAL: 235 - 3600
��LC.
�rt�
�i . • • • •
R
'��fe would like to request at this time an exteasion of time amounting to five
wecks and two dc�ys for the above project. This request is to coincide vith
th� request by rluor Brothers Construction Coapany. The new completion date
would be P'ebn�ary 6, 19F31.
Plense let us Imow if this will be appropriately approved.
Thflnk you very mucb.
Sincerely yours,
L}1,��11(C.�. %)(t'ra((C� il)1(j�
itussell r^.. tderrill �
President
cc: Mark Hudnleston
Heating - Air Conditioning • Plumbing • Pomer Process Piping • Sprinkler Piping • Pipe Fabrication
�'rARBRO - KEMPINGER
ARCHITECTS
101� WCST SOUTN PAHK AVENUE
EO% 70Y6 11�1�/3]6-]�10
OSNKOSN. WISCON3IN 6�00�
5 August 1980
E.C. Mcrrill, Inc.
804 Witzel Avenue
Oshkosh, Wisconsin 54901
RE: File 7932 - Bus Garage
Oshkosh, Wisconsin
Gentlemen:
�
with reference to your letter of August 1, 1980, the completion
date on the above project will be extended to February 6, 1981.
An official change order as such will be written at a later
(j3tE'.
R�:pectfully,
YARIIRO-KEMPINGER� ARCHITECTS ,
by
I:ichard J. Kempinger
RJK/1z
cc: Mr. Mark Huddleston
�ARBRO - KEMPINGE�
ARCHITECTS
101t WEST SOUTM PARI( AVENUE
!O% 7096 11�1�/3�5•»70
OSNNOSN, WISCOHSIX 6lY07
10 Ju1y 1980
E.C. Merrill, Inc.
$04 Witzel Avenue
Oshkosh, Wisconsin 54901
Attn: Mr. Tom Gabert
RE: File 7932
Bus Garage
Oshkosh, Wisconsia
Mr. Gabert:
�
�
Following is 1n regard to our field observations of July 10, 1980:
1.. Where the existing 3" dia. roof conductor piping from Room 102
passes thru the wall above Door i/I03B into Aoom 0103, disconnect
tlie piping as required so that Fluor Bros. can install the new
steel lintel in that area. Temporarily discharge the pipe to
the esterior as necessary. When reconnecting the conductor,
run ttie pipe underneath the lintel at the opening. Hold the
pipe as hlgh as possible. In esaence, the replacement piping
in this small area and also in the area above Door lC103A vill
be lower than as shown on the original drawings. Coordinate
the height and location of this piping wi[h the new door at
opening Ii103A. If there is extra time and material involved
in ttie installation, due to the new height, keep zecords of iC,
and submit your T6M billing in a breakdown form. This extra
work, if a�, will then be written into a changa order at a
later date. prior to the end of the project. ,
2. At tiie southwest corner of Room 0107 it became evident [hat a
vent line exists in the area of Door I1107E. We checked wlth
Marv tii�ley, Plumbing Inspector, who determined that it will
be necessary Co relocate this vent. As ve had discussed in
the field, extend this vent over to the west, under the floor,
and rise up veriically west of Door li107E as necessary. Co-
ordinate the location of the verCical riser wi[h Fluor Bzos
nnd Town and Country Electric, so that the pipe does no[
interfere wlth the track mechanism or the electrical components.
Where the floor must 6e removed, do so by saw-cutting. Pro-
vide corapacted fill and concrete floor patching per specifications.
Perform work on a T&M basis. At completion submit your billing
in breakdown form. This extra work will be written into a
change order at a later date, prior to the end of the project.
YARE3R0 - P(E=MPINGE� �
ARCHI7ECTS �
IO1J WEST SOUTM VARK AVENUE
BOX 30i6 f/�i�ll�5•73/0
OSMNOSN, WISCONSIN Sf90�
2
5'+ret No
10 July 1980
Mr. Tom Cabert
E.C. Merrill, Inc.
RE: File 7932
3. At the existing wall between Rooms 11102 and 103, plans indicated
that the existing cold water line was to be removed and rehung
from the ceiling at the height indicated�by you the Plumbing
Contractor. Kienast removed the pipe in queation, apparently
so they and Fluor Bros. could work in that area. Plans and
specs, plus the preconstruction mee[ing minutes, clearly in-
dicated that proper coordination of such work muat be conduc[ed
be[ween the Trades. You indicated that if Kienast will provide
code acceptable replacement pipe E.C. Merrill will install the
pipe. We were asked to determine what size pipe is actually
needed in this area. The supply piping required for the paz-
ticular bus wash purchased by the Owner is 2-1/2" @ 40 P.S.I.C.
The following has been determined by our Plumbing Consultant.
Don liammer, hased on preasure available at the site:
A. The existing east-west 3-1/2" line in Room p103 tha[ was
removed prematurely must be replaced with a pipe size of
2-1/2" min. (or larger at contractor's option). The co-
ordination and cost of this inatallation muat be handled
by E.C. Merrill and Kienast.
B. The new north-south water piping which extends from the
pipe ln Room Ii103, per article A above, to the location
of tt�e bus wash in Room 0101, ia to be changed from 1-1/2"
to 2-1/2" due to the requirement of the particular bus
vash equipment being furnished. The 1" feed to the water
heater can remain. Change [he valves, shock stops, sleeves,
etc. as necessary. The extra material involved in this
change is to be charged on a T&M basis. Submit your
billing for this item in a breakdown form and a change
order will be written at a later date, prior to the end
of the project.
YARBRO - KEMPINGER�
ARCHITECTS
1018 WEST SOUTM PARK AVEHUE
BO1[ 1096 V�Ul176•J310
OSNNOSM, WISCONBIN {�907
0
tin2rtNO ._3_.
10 July 1980
Mr. Tom Cabert
E.C. Merr312, Inc.
RE: File 7932
0
If there are any questiona on the above, feal free to call.
Respectfully,
YARBRO-KEMPINGER, ARCHITECTS
by
��� ��
Richard J. Kempinger
RJK/lz
cc: Mr. Mark Huddleston
Kienast Utility Constructioa Co.
Fluor Bros,
Town and Countiy
Mr. Don Hammer
�
�
„__ �.s -_--- — �r�T.��l,�al
]�ai•:�r
P.U. Elox 2096
Architects
:)shi;osh, 7iisconsin
♦NCIUtIC�"�
Lick �enpin�-er
We nereDy suDmit specdmal�ons a�
E. C. MERRILL, INC.
804 Witzei Avenue
OSHKOSH, WISCONSIN 54901
(414) 235-3600
D�S[ Of PLANS
PHONE
Oshkosh Bus
JOB IOCR�ON
ragv i�v. o�
Se�tember 5, 1980
File �7932
lOB VNONE
�
_ _
Furniehing & Installing 2- 2” Backflow Preventers In Lieu Of
1- 2-2 �eckflow Preventer. To Include All Necessary Piping, Fittings, Valves, Drain,
Strainers, Labor„&.,,Testing For The Sua OY .
_
240o thousand, three hundred ninety-five dollars ($2.395.�0).
_._ .. _
Above Price Based On Your Sketch P-101 & P-102.
�� �C �CD�It�flC hereby to lurnish material and labor — complete in accordance with above specilicaUOns, for the sum oC
T�,�o thousand, three hundred ninety-five dollars and no�100 centa dollars(S 2.395•00 �
(':�vmc�l lo �e made as lultows �.
'I bi m�tenal n qunnnterE �o Ce n spec�hetl �II wOrM lo �e complete0 in a wo�kmanhFe
� mrnner eccor0�ny W stm�arn pncuc<s Any aLL<�at�on or tlevmnon Imm aCOVe so<ui�<o- Author¢etl
I� t�om �:.vninng nva msts w�u Oe e.rcutea oNy upon �nllen o.a<�i, ,�a wm Decome an $�gndWte
j e•��a c�argr over anU aDOVe Ihe eslimete /.II agreemenb co��ingenl upon shiFei, acUOenb
or eei.ys teyone our convol Owne� to urry hre, tornaao ana ome� necessary mzu.anc< Note: ThiS propo5al may �e
�,\0.�. Wa .ers a�e �wiy cove.ee ey wa���,en's Compensai�on insu�ance. wdhdrawn by us d not a<cepted within
� _. .__—:—._
r
li �((��}ilaiirrnf�Jr��pnsttl—Th�.,oa��pr�rrs.specilir,itinns
n..d �on.�,liom .uc s.�li.l.�c�ory .uid �re �erebY attepted. Vnu are aul�onecd $'gnature
lo �lu It�r..orA es apcal�ed Peyn�cnt wJl �e maCe as outhned a�ova �
I\I\ Da�r nl Arrr;tlanrc Signature
0
-- "'�"' " --��—aT- m�� n� cu...w�r u.o .a. uou+u �uai.u� aurt.. �.c u.oro.. uu� ouw
3� tlays.
YARBRO - KEMPINGER
ARCNITECTS
/01/ WEST SOUTN VARK AVENUE
BOX tOGb tU11/7J6•J710
OSNI(OSM. WISCONSIN 3�907
7 August 1980
Mr. Tom Gabert
E.C. Merrill, Inc.
804 Witzel Avenue
Oshkosh, Wisconsin 54901
RE: File 7932 - Bus Garage
Oshkosh, Wisconsin
Mr. Gabert:
When our plumbing drawings were prepared for the bus wash area,
they were based on a bus wash manufacturer that the Owner anti-
ci.pated they would be purchasing from. Thru the bidding process
the Owner ended up purchasing a bus wash as manufactured by
another firm, Ross and White. As per the original drawings, you
are required to make the final connection to the Ross and White
equipment.
Enclosed is a set of Ross and White shop drawings, identified as
Contract 8013. These drawings are for your use in coordinating
your work in this area.
Due to the fact that the Ross and White equipment does not come
with a backflow preventer, it will be necessary to install such
an assembly under your contract. Enclosed are three (3) copies
each of Drawings P-101 and P-102 showing the necessary piping
required in this area.
Please submit a proposal in breakdown form, on your letterhead,
for this requested additional work.
Respectfully,
YARBRO-KEMPINGER� ARCHITECTS
by _
Richard J. Kempinger
RJK/lz
Enc.
cc: Mark Huddleston w/copy of P-101 and P-102
YARBRO - KEMPINGER
ARCHITECTS
IOiB WEST SOUTH VARK AVENUE
BOX 2096 11i141135-3�10
OSHKOSM. WISCONSIN 56901
P-HVAC-2 7932
CHANGE ORDER NO. . . .. _._ FILE NO. -___..____
OWNER'S COPY/
�
19 September 1980
DATE ------------ �
City of Oshkosh, Wisconsin
OWNEFi: . _ — - - - - -� -------------
E.C. Merrill, Inc.
CONTRACTOR: 804 W1tZe1 Avenue, Oshkosh, Wisconsin
Plumbing, Heating-Ventilating & Air Conditioning Work
CONTRaC7FOR: Addition & Alterations, Bus Garage, Oshkosh Transit
System, 926 Dempsey Trail, Oshkosh, Wisconsin
IT IS HEREBV MUTUALLV AGREED THAT THE FOLLOWING CHANGE IN THE WOFK AS COMPRISED IN THE ORIGINAL
6 June 1980
CONTRACT DATED _____________ _.__.__SHALL BE COMPIETED IN ACCORDANCE WITH THE CONTRACTOR'S
proposals stated below, Architect's requests stated below, and
' area • ��=z ^T -9 TI IE iFflM1'6 G�f SI IG CCC"�,or.z
subject to the terms of the contract.
FOR THE SUM OF
is
2,395.00
PRIOR TO
THIS ORDEA
THIS OFDER
SEE ATTACHMENT "A"
TWO TAOUSAND THREE HUNDRED NINTY-FIVE & NO/100TH5
. . .. . .. . . . _ . . . . _ ... . . _._ _.-___._. _ . DOILAFS
TOTAL TO DATE
ORIGiNA�CONTRAGT
EXTRA ORDERS -
CREDIT ORDEFS
) ADOED TO'. 9E�Bk19�E�B�Fii9M CONTqACT.
ADD
$2�%��.��
$2,395.00
DEDUCT
NONE
NONE
$5,095.00 NONE
$124,664.00
APPROVED
YARB�O- PINGER CITY ATTORNEY
� A � HITE S
aY I�/� - , --- By- —
ACCEPT E. . MERRILL, INC.
By
5, 095 _00__ exceed) � By
NONE
�
Clty
�'�'A'Manager
City
Clerk
NET TOTAL TO DATE $129, 759. ��
_ _ _ __ exceed) By _�,�.City
Comptroller
r-I
N
�
ty N
N 1
'O U
F 6
O �r
x
��
ao a
� i
� �
� �
U O
�i
o >
f� O
Aa, N
�s a
o a�
� �
�
� Ca
O N
,-� c�
N
� �
� �
om
m
a� o
a +�
ti
�
y
N
�
¢
l� •
a�
o a�
z� +-+
s s�
�
O ¢1
H v
�
0
�
a�
0
�
0
�
rn
�
�
ri
Ci
N
�
a�
�
a
�
�
)y
��' s.�
F+ i
r� 7
U
�
�
,i
U