Loading...
HomeMy WebLinkAboutPW CNT 13-11/CHG OR 1DEPARTMENT OF PUBLIC WORKS 215 Church Avenue P.O. Box 1130 Oshkosh, Wisconsin 54903-1130 Ph.(920)236-5065 Fax(920)236-5068 July 31, 2015 Ms. Sue Wood Wood Sewer & Excavating, Inc. E9238 County Road X New London, WI 54961 Subject: Change Order No. 1 Contract 13-11 � Dear Ms. Wood: � OIHKOIH ON iXE WAiER Enclosed is an executed copy of Change Order No. 1 between the City of Oshkosh and Wood Sewer & Excavating, Inc. regazding the abovementioned project. If you have any questions, please call our office at (920)236-5065. Sincerely, C\�� / ` \/�-��- Steven M. Gohde, P.E. Interim Director of Public Works SMG/tlt Enclosure: Change Order No. 1 cc: Pam Ubrig, City Clerk (w/original) Tara Wendt, Assistant Finance Directar (w/copy) File (w/original) i:��g���u;�g��3-u s.� r.m n�n.n-�anr�o}e«i�r ,m.�m��co��� mrmcna�ge obg.m-u e.e�rea co a� z3 �- Page 1 of 1 �s ao�. TO: Wood Sewer & Excavating, Inc. E9238 County Road X New London, WI 54961 CHANGE ORDER #1 DATE: JULY 7. 2015 Your present contract with the City of Oshkosh, Contract No. 13-11, awarded August 13, 2013, is hereby amended and changed as follows: NET INCREASE TO: SECTION I- SANITARY MANHOLE REHAB NET INCREASE TO CONTRACT Section I Sanitary Manhole Rehabilitation Totals Bid Total $740,768.82 $740,768.82 CO #1 $5,058.46 $5,058.46 Contract Total $745,827.28 $745,827.28 Recommended: �., �-a�,/� Interim Director of Public Works CITY OF OSHKOSH aY: /�a—� ��-r.�k� �City Manager , ity CI k ' Appr d and accepted: Contractor $5, 058.46 $5,058.46 I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. � � \ _� )� — - � . . - • .. . -. . . . I, ��u► �II •ir��l � 1 / � . .�_ CONTRACT 13-11 - CHANGE ORDER #1 SECTION I- SANITARY MANHOLE REHABILITATION ITEM BID INSTALLED NET NET UNIT �NCREASEIN DECREASEIN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTftACT PRICE PRICE 100 Replace sanitary manhole casting, complete as specified Each 157.00 139.00 -12.00 $160.00 $1,920.00 102 External manhole chimney seal (Cretex), complete as specified Each 6a.00 47.00 -17.00 $230.00 $3,910.00 103 External manhole chimney seal (Infi-Shield), complete as specified Each a7.00 82.00 -5.00 $520.00 $2,600.00 104 8" external manhole chimney seal extension, complete as specified Each 39.00 7.00 -32.00 $170.00 $5,440.00 106 Internal manhole chimney seal, complete as specified Each 44.00 46.00 2.00 $230.00 $460.00 108 10"internal manhole chimney seal extension, complete as specified Each 11.00 20.00 9.00 $130.00 $1,170.00 110 7" intemal manhole chimney seal extension, complete as specified Each 26.00 12.00 -14.00 $120.00 $1,680.00 112 Concrete adjusting rings, complete as specified Vertical Feet 39.40 54.84 16.44 $280.00 $4,603.20 114 Rubber adjusting rings, complete as specified Vertical Feet 3.70 5.02 1.32 $590.00 $778.80 116 Reconstruct sanitary sewer manhole, complete as specified Vertical Feet 119.77 7227 -47.50 $540.00 $25,650.00 118 Furnish and install standard sanitary manhole (4' diameter), complete as specified Vertical Feet 251.30 204.16 -47.14 $699.00 $32,950.86 120 Furnish and install standard sanitary manhole (6' diameter), complete as specified Vertical Feet 72.50 0.00 -12.50 $2,400.00 $30,000.00 122 Saw cut concrete pavement, complete as specified Linear Feet 4.88a.0a 5,080.83 196.83 $2.00 $393.66 Page 1 of 5 CONTRACT 13-11 - CHANGE ORDER #1 ITEM BID INSTALLED NET NET UNI7 INCREASE IN DECREASE IN NUMBER DESCftIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 124 Remove concrete pavement, complete as specified Square Yards 2,o2s.00 2,984.32 955.32 $6.00 $5,731.92 126 Pavementties,complete as specified Each 1,628.00 1,610.00 -18.00 $5.00 $90.00 128 7" concrete pavement, complete as specified Square Yards 1,725.00 1,377.35 347.65 $51.00 $17,730.15 130 7" concrete pavement (HES), complete as specified Square Yards 50.00 55.80 5.80 $56.00 $324.80 132 8" concrete pavement, complete as specified Square Yards 320.00 77.60 -242.40 $57.00 $13,816.80 134 8" concrete pavement (HES), complete as specified Square Yards 25.00 1,235.00 1,210.00 $60.00 $72,600.00 136 Partial depth joints, complete as specified Linear Feet 150.00 21420 64.20 $3.00 $192.60 138 12" radius wrb with 6" � CABC and greding, complete as specified Linear Feet 30.00 0.00 -30.00 $24.00 $720.00 140 30" curb and gutter, 7", with 5" CABC and grading, complete as specified Linear Feet 60.00 0.00 -60.00 $28.00 $1,680.00 142 4" concrete sidewalk, complete as specifed Square Feet 75.00 0.00 -75.00 $6.00 $450.00 144 6" concrete sidewalk, driveway, and ramp, � complete as specified Square Feet zo.o0 19.70 -0.30 $7.00 $2.10 146 Drilled No. 4 sidewalk tie bars, complete as specified Each 24.00 10.00 -14.00 $5.00 $70.00 148 Curb ramp detectable warning field, complete as specifed Square Feet 8.00 0.00 -8.00 $38.00 $304.00 150 Saw cut asphalt pavement, complete as specified Linear Feet 2,756.00 2,576.10 -179.90 $1.00 $179.90 152 Remove and replace HMA pavement, complete as specified Square Yards t,sss.00 1,726.78 30.78 $44.00 $1,354.32 Page 2 of 5 CONTRACT 73-71 - CHANGE ORDER #1 ITEM BID INSTALLED NET NET UNI7 INCREASEIN DECREASEIN NUMBER DESCftIPT10N UNIT qUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 154 Lawn restoration, complete as specified Square Yards 192.00 95.66 -96.34 $9.00 $867.06 156 Manhole lid plug, complete as specified Each 185.00 173.00 -12.00 $14.00 $168.00 158 Tuck point manhole, complete as specified Each 58.00 61.00 3.00 $210.00 $630.00 160 Sanitary manhole grouting setup, complete as specified Each 75.00 76.00 1.00 $500.00 $500.00 162 Sanitary manhole grout, complete as specified Gallons 4,466.00 5,390.00 924.00 $7.50 $6,930.00 164 Sanitary manhole cementitious liner setup, complete as specified Each 5.00 5.00 $1.00 166 Structural cementitious liner, complete as specified Vertical Feet 4Z52 50.58 3.06 $141.00 $431.46 168 Cold mix patch, complete as specified Square Yards 700.00 1,210.60 510.60 $28.00 $14,296.80 170 Traffic control, complete as specifed Lump Sum 1.00 1.00 $16,440.00 SECTION I-(BID ITEMS 100 - 170) - SUBTOTAL E110,397.56 (5140,228.87) ADDITIONAL WORK REQUIRED: CO #1 • SECTION I ITEM BID INSTALLED NET NET UNR �NCREASEIN DECREASEIN NUMBER DESCRIPTION UNIT qUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 1 Infreshield purchase Each 0.00 -51.00 -51.00 $121.33 $6,187.83 2 Additional equipment, labor, and materials to repair storm sewer on Hazel Street on 5/8/2014 Lump Sum 0.00 1.00 1.00 $7,056.10 $7,056.10 3 Additional equipment, labor, and materials to reinstall Hardee's lateral on High Avenue on 5/16/2014 Lump Sum 0.00 1.00 1.00 $2,475.00 $2,475.00 Page 3 of 5 CONTRACT 13-11 • CHANGE ORDER #1 ITEM BID INSTALLED NET NET UNIT �NCREASEIN DECREASEIN NUMBER DESCR/PTION UNIT qUANT17Y QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 4 Additional equipment, labor, and materials to reinstall the lateral for 1230 Ontario Street on 5/27/2014 Lump Sum 0.00 1.00 1.00 $2.332.50 $2,332.50 5 Additional equipment, labor, and materials to abandon sanitary Manhole 07-180 on 6/11/2014 Lump Sum 0.00 1.00 1.00 $7,136.00 $7,136.00 6 Additional equipment, labor, and materials to repair storm sewer at the intersection of Wright Street and Scott Avenue on 7/16/2014 Lump Sum 0.00 1.00 1.00 $5,370.00 $5,370.00 7 Additional equipment, labor, and materials to invistigate a possible abandonment of a santiary manhole not on the City's records (sanitary Manhole 01-05). Lump Sum 0.00 1.00 1.00 $3,024.00 $3,024.00 8 Additional equipment, labor, and materials to invistigate a set of sanitary and water laterals that were abandoned (sanitary Manhole Ot-23). Lump Sum 0.00 1.00 1.00 $1,600.00 $1,600.00 9 Additional equipment, labor, and materials to properly abandon a santiary lateral (sanitary Manhole 01-214). Lump Sum 0.00 1.00 1.00 $1,600.00 $1,600.00 10 Additional equipment, labor, and materials to install a new sanitary wye that was in close proximity to sanitary Manhole OS-57. Lump Sum 0.00 1.00 1.00 $1,600.00 $1,600.00 11 Additional equipment, labor, and materials to remove a sanitary manhole not in the City's records and install PVC main (sanitary manhole approximately 19' south of 05-79). Lump Sum 0.00 1.00 1.00 $4,084.00 $4,084.00 Page 4 of 5 CONTRACT 13-11 - CHANGE ORDER #1 ITEM BID INSTALLED NET NET UNIT INCREASEIN DECREASEIN NUMBER DESCftIPT10N UNIT qUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 12 Additional equipment, labor, and materials to install a new sanitary wye that was in close proximity to sanitary Manhole 07- 110. Lump Sum 0.00 1.00 1.00 $2,400.00 $2,400.00 13 Additional equipment, labor, and materials to install a new sanitary wye that was in close proximiry to sanitary Manhole 12-79. Lump Sum 0.00 1.00 1.00 $2,400.00 $2,400.00 ADDITIONAL WORK: CO #1 -(ITEMS 1- 13) • SUBTOTAL E41,077.60 (E6,187.83) NET INCREASE TO: SECTION I 55,058.46 NET INCREASE TO SECTION I: $151,475.16 NET DECREASE TO SECTION I: (E146,416.70) NET INCREASE TO CONTRACT: E5,058.46 Page 5 of 5