PURPOSE:
SNITIATED BY:
� 16
RESOLUTIOi3
CHANGE ORDER NO. 1- PUBLIC WORKS CONTRACT 81-03C
PARKS DEPARTMENT
BE IT RESOLVED by the Common Council o.f the City of Oshkosh that the
£allowing Change Order to Public Works Contract 81-03C is hereby
agproved:
CHANGE ORDER N0. 1- Adding the amount of $832.00
STREETS & ROADS CONSTRUCTION CORP.
P.O. Box ']81
Waukesha, WI 53I87
PURPOSE:
ADD TO DIVISION C- Tennis Courts @ Menominee Park
Construction of a bituminous concrete pavement on
a 10 foot wide by 94 foot long driveway, €rom the
street to the tennis courts.
Lump sum $832.00
BE IT FURTHER RESOLVED by the Common Council of the City of Oshkosh
that the aforeinentioned Change Order is hereby approved; a copy of
which is zttached to this resolution.
BE IT FURTHER RESOL�IED that the monFy for chis purpose is heret�y
appropriated from Account No. 361-915, Park Improvement Funds, Tennis
Courts.
�LIBMI. i i'e�'� BY
/v �
'..Pt�r:.c...,..� �- �-�—
- 16 -
�
CRF
OF
OSM[OSM
"MY{^:;;
, Y��:
DATE: May 29, 1981
T0: William D. Frueh
City Manager
FROM: Boyd A. Kraemer�
Director of Parks
COUNCIL-MANAGER ADMINISTRATION
� � �
RE: Change Order to Menominee Park Tennis Court Construction
ADD Driveway approach from Pratt Trail to tennis courts
I have requested Streets and Roads Construction Co., which is the City's con-
tractor tor the reconstruction of the Menominee Park tennis courts, to submit
a cost estimate for the instaliation of a driveway approach to the new courts.
It approved, the approach would provide the following advantages: a) provide
an all-weather surface for maintenance and work details; bl eliminate the foot
traffic on the grass from the parking lot to the courts; and c) finish the
project by providing pedestrian circulation. The proposed driveway takes ad-
vantage of the contractor's equipment being on the site and can be easiiy ac-
complished while the sub-surface is being prepared. We had earlier planned
tor the driveway by providing a curb cut on the westside of the entrance off
of Merritt Avenue. Sufficient funds exist in the construction account to pro-
vide this change order.
We are not recommending the 5 foot wide asphalt sidewalk as also specified. We
will obtain other price quotations for the work from other contractors. This
price quote was to provide an asphalt walk around the new Kiwanis watertall
exhibit.
BAK:dpm
Enclosure
CIT'/ HALL • 215 CHURCH AVENUc • P. O. 80X 1130 • OSHKOSH, WISCONSIN 54902
r ruYueuu
STREETS AND ROADS CONSTRUCTION CORPORATIOIV � I_
P.O. Box 781 � `�
Wauke9ha, Wiawnaln 53187
Phone (414) 5445231
VRODUCEpS b GONTRAC70R9 OF BITUMINOUS PAVEMEN73
Yr�01�E - WTE
Oshtsosh ParksDepartment 42tt-0280 May 28, 1981
Church Ave.
or vuns
,oe
Park
--- - - - - -- �
Wr neeeey suDmrt sptihcatronf and estimatn lor . . .. . . ,.. . ... . . ,
Tha con9trsetton of a Mts�inous concrete�pavement oa a la-feet wide by 94-feei
2cng dri�er+s�y, from the street'to the tennis courts._ pll work, as detailed
belolr, shall conYorm to the City's SpecifY.cationa for tha crork.
F�cavation'oY the topsoil.
P:ovide and place a 6-inch coa�pacted. average thickness, stona base
canrse.
Provida and place a 2-ineh compacted. average thickness, bit�aninous
concreta sorYaca.
Ltmip Sun ....................$832.00
Tss coa�tru;,ti.on oP a$-Yeat cride Mtwninous conerete sideiralk in areas designated
by ths Park Director. ,#71 srork, as detailed balox� sha11 conform to tha Cit,q's
Sp9ciiications for the uork.
Flnal shaping and compact3on oP the subgrade.
Provide and place a 2-inch compacted, average thickaess, bitwainous
coacrete surface.
IInit Prica ..............�"3.�0 per I3.nea1
Foot
SEE REVERSE SIDE FOR ADDITtONAL TERMS AND CONDITIONS
�P �III}iSIBP hereby to furnish material and labor — eomplete in accordance with above specifications, and prices, terms ot payment
shal! be net 30 days. A 1% per month service charge shall be charged on aIl ouutanding balanees.
.u� m.�«�y h[�...�e..a �e w.• so.e�n.a. �n .w� a w eemm.�w �, s w..m,���w.
m�nnw sccerEin� ta st�MSM D�Ktien. Firy altHStan e� Cw�atian lrpn �pore �D�aLU. AuthO/IZtO� � / ��
4wa m�Wini rNa roaU wll M���CU1N enly yppn rnRen erCeri, snU w�ll pecom� an $�gndtulG "�"7i~v' R'-
�.tn tns.p aw bM �pe.� m� nu�nne eu aV�mn conbn¢�nt uoen av�ba. xawmn �B Bl' • BWI1B P
e� Cw+y� Dqmy ow mntrol. Ornv b<+�q hr�, tpn�CO aM et�w nw�fary mwonc� Note. T��S O�OOoial mty Oe -
W..ww«. sn h,q ew«.e er wonm.� a eoTwnne�o+ �nsar..e. wdhdrawn 6y u3 d pOt dCCBGtld witllm QdYS.
AYIP�IBIliP Iif �TII.�fIISFIl — The above prices, specifications and conditions are satisfactory and are hereby accepted. You are
authorized to do the work as specified. Payment will be made as outlined above. If :eparate bids or alternate bids are inditated, ackno�w
ledge aceeptanee by initialling those prica which you hereby aceept.
Da�e ol
Signaturs
Initial
T0: STREETS & ROADS CONSTRUCTION CORP.
P.O. Box 781
Waukesha, WI 53187
� �
CHANGE O�DER N0. 1
DATED: May 28, 1981
Your present contract with the City of Oshkoshs Contract No.el-o3 C
is hereby amended and changed as follows:
(insert here work and/or materials to be added or e1'.�inated and
the unit and/or lump sum �rice to be added to or deducted from the
contract,)
ADD TO DIVISION C- Tennis Courts @ Menominee Park
Construction of a bituminous concrete pavement on a 10 foot wide
by 94 foot Long driveway, from the street to the tennis courts
Recommended;
irector of Public Glorks
Lump sum $832.00
CITY OF OSHK03H
By:
City Manager
City Clerk
Approved and accepted:
Contractor
I certlfy that provision has been made to pay the liabillty that
will accrue to the City of Oshkosh, Wisconsin, under the within
Change Order.
Comptroller
Approved as to form;
City Attorney
�
c,
a�
� b
� s.
0
� � c� m
N U � �
GO cd
� ta �n m
N +� w a�
U O 6 6
U
� � �y � .-.
> �n a� .� m
-- o x � � --
�"'� S� F-� o
,. a o N �
a � ?> w +> a�
•� as m o w o
",', U i-] -'T. O -•Ti
O r�l �d
.N ri .. y' ••
A O +> +�
S�. � E N O N
O P+ O H a
� a a
.N i ..
� U C. C
r-I rl M O O
O O ri ..i
rA • I l� ++
a z° � � �
- _.__ ____-.__.__..___
__�
� a'� �
rn � G,
-7 �� U
a� � �
� �' �
h U
6