HomeMy WebLinkAbout31535 / 81-14September 3, 1981 # 14 RESOLUTION PURPOSE: CHANGE ORDER N0. HV-2, Energy Conservation Improvements INlTIATED 3Y: DEPARTMENT OF COMMUNITY DEVELOPMENT BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order to Van Asten keating and Sheet Metal, Inc. for energy conservation improvements at Oshkosh City Hall is hereby approved: CHANGE ORDER N0. HV-2 - Adding the amount of $2,670.00 VAN ASTEN NEAT�NG AND SHEET METAL, INC. R. R. 5> Box 351D Appleton, WI 54911 PURPOSE: Provide a 1-1/2 HP air compressor for the Johnson Control system at Oshkosh City Hall. Include all power wiring as required. (See attached Change Order) BE IT FURTHER R:SOLVED by the Common Council of the City of Oshkosh that the aforementioned Change Order is hereby approved; a copy of which is attached to this resolution. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from Account No. 357-999> Energy Conservation. i,--_�- -._.... .,.;, - /�1�,/ I �_ _ _ /Vv�l�"/.CLi��LL1!��i�i - 14 - �� r� , _�y . ,-��� � � f.� � yarbro - kempinger architects �l�O 1076 W. SOUTH PARK AVENUE • POST OFFICE 80X 2096 • OSHKOSH, WISCONSIN 54903 • 414/235.9310 CHANGE ORDER n,o. xv-z FILE NO. :t1., OWNER'S COPY CONTRACTOR'S COPY DATE 4 AuqL•st 1981 ApCHiTECT'S COPY _ OwNER City of Oshkosh, Wisconsin Van Asten Aeating and Sheet Metal, Inc. CON7RaCTOA RR#5, $ox 351D, Ap leton, Wisconsin 54911 Heating, Ventilating & A.C. Work, EDA Project 06-11-01735.60 CONTRACTFOR ER2L'4y Conservation Improvements, City of Oshkosh, Wisconsin-.�. IT IS HEREBY AGREEDTHE FOLLOW ING CHANGE IN THE WORK SHALL BE COMPLETED IN ACCORDANCE WITH THE ATTACHED PROPOSAL ANO SUBJECT TO TERMS OF THE ORIGINAL CONTRACT DATED 10-17-SO Provic3e a 1-1/2 HP air compressor for the Johnson Control system at Oshkosh City Hall. Include all power wiring as required. - Architect's letter o£ 30 June 1981 is attached. - Contractor's letter of 29 June 1981 is attached. FOR THE SUM OF (ADD -�{�XJ TWO THOUSAND SIX HUNDRED SEVENTY •AND NO/lOOTHS---------------------- DOLLARS ($ 2,670.00 � ADD DEOUCT PRIOR TO THIS ORDER ORIGINAL CONTRACT $ 21 S�% O O. O O EXTRA ORDERS 2, 6 7 O. O O 7HIS ORDER GREDIT ORDERS $2,670.00 NONE 2,100.00 TOTA�TO DATE NET TOTA�TO OATE 2�670.00 2,100.00 $256,270.00 APPROVED ACCEPTED YARBRO/-1fE)MPl ER, ARCHITECTS CITY OF OSHKOSIi, �4ISCONSIN BY ��� BY BY ACCEPTED VAN ASTEI3 HEATING & SHEET METAL BY , �alGriu lSl BY C ry � � yarbro - ��� �kempinger �1 architects �� 101! W. BOUTM PARI( AVENUE • POST OFFICE 80l( 20� • OBFM(08K WIBCANBfN 6N01 • N V278�7310 30 June 1981 Mr. Myron Dodge Chief of Public Works U. S. Department of Commerce 175 West Jackson Houlevard Suite A 1630 Chicago, Illinois 60604 • REs EDA Project �06-11-01735.60 Our F.ile No. 8006 Enerqy Conservation Improvements City of Oshkosh, Wisconsin Mr. Dodqe: There are three items on the subject project consideration. Two concern extra work at the one involvea an extension of completion time. ITEM NO. 1- City Hall ��-2 which need your City Hall eite and It has been determined that the existing pneumatic temperature control compressor system does not have enough capacity to handle the extra air required for the added HVAC control. The existinq compressor ie a 1/4 HP unit. A 1-1/2 HP compreasor is required at an added cost of $2,670.00. Your concurrence is requested. ITEM NO. 2- Entire Project, Primarily City Hall Fluor Bros. Construction Company has requested an extension of the Contract Completion date by four (4) weeks. The current date of July 23, 1981 would then be August 20, 1981. Encloaed is a copy of Fluor Bros.' June 10, 1981 letter making the request which is self-explanatory. We were asked by Fluor to consider approvina the use of tha thinner insulated panel, but declined aince the entire project is enerqy coneervation. Your concurrence is requested. ITEM NO. 3- City Hall G-s The City of Oshkosh is considering changinq an additional 20 windows on the south side of City Hall. As with the original ' contract window �uork, the coneideration is for the conservation o! enerqy. r Page 2 30 June 1981 File No. 8006 Mr. Qodqe �� 1 8J The existinq windows are single glazed wood double hung, two aindows per masonry opening. By installing one thermal broken with insulatinq glass double hunq aluminum window with ineulation panels filling the balance of the openinq, a considerable energy savings will occur. The additional cost for this work is $29,810.00 which is accep- table to the Owner. If this work is autho;ized, the completion time will have to bs extended eleven (11) weeks from the date of authorization. Will you please consider this request and authorize a chanqe order to add the work to Fluor Bros.' Contract for General Conatruction Work. An early reaponse will be appreciatefl. Sincerely, YAR$RO-KEMPINGE&, ARCHITECTS by Robert L. Yarbro RLY/kj Ena. ca: Kr. Gordon Ellis, City of Oehkoah �' � �� HEATING & SHEET METAL APPLETON, WIS. 54911 Rr. S BOX 351D Phone 788-5611 RANDOLPH DRIVE Yarbro-Ker�pinger Architects 1018 �!. �outit Park �venue Oshkosh, Wi 54941 Re : City Ha1,l Osnkosh, `,Ji Air compressor Gentlemen: June 29, 1981 installation .�e propose a 12 iiP air conpressor be installed at the above mentioned job as recomMeaded by Johnson Controls for the sum of w`2670.00 This price includes power wiring for tne additional air c�nNressor and the air conpressor starter. :sincerely, �.� ����. r'lo-yd Vanasten ��'V.+/kvd �f�� � r-I � � ri .� 4, � N � i�i !� � �y� N O �N � �N u o � � Y � � � O � � � � � � ti N +� �. a a � ro .. � � v O •rI E F+ H � 'f„y' U O +� � r'� W � r-i M � a�'i � � � x � � � U � U