HomeMy WebLinkAbout31535 / 81-14September 3, 1981
# 14 RESOLUTION
PURPOSE: CHANGE ORDER N0. HV-2, Energy Conservation Improvements
INlTIATED 3Y: DEPARTMENT OF COMMUNITY DEVELOPMENT
BE IT RESOLVED by the Common Council of the City of Oshkosh that the
following Change Order to Van Asten keating and Sheet Metal, Inc. for
energy conservation improvements at Oshkosh City Hall is hereby approved:
CHANGE ORDER N0. HV-2 - Adding the amount of $2,670.00
VAN ASTEN NEAT�NG AND SHEET METAL, INC.
R. R. 5> Box 351D
Appleton, WI 54911
PURPOSE: Provide a 1-1/2 HP air compressor for the Johnson Control
system at Oshkosh City Hall. Include all power wiring
as required. (See attached Change Order)
BE IT FURTHER R:SOLVED by the Common Council of the City of Oshkosh that the
aforementioned Change Order is hereby approved; a copy of which is attached
to this resolution.
BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated
from Account No. 357-999> Energy Conservation.
i,--_�- -._.... .,.;, -
/�1�,/ I
�_ _ _ /Vv�l�"/.CLi��LL1!��i�i
- 14 -
��
r� , _�y
. ,-���
�
� f.�
�
yarbro -
kempinger
architects
�l�O
1076 W. SOUTH PARK AVENUE • POST OFFICE 80X 2096 • OSHKOSH, WISCONSIN 54903 • 414/235.9310
CHANGE ORDER n,o. xv-z
FILE NO.
:t1.,
OWNER'S COPY
CONTRACTOR'S COPY
DATE 4 AuqL•st 1981 ApCHiTECT'S COPY _
OwNER City of Oshkosh, Wisconsin
Van Asten Aeating and Sheet Metal, Inc.
CON7RaCTOA RR#5, $ox 351D, Ap leton, Wisconsin 54911
Heating, Ventilating & A.C. Work, EDA Project 06-11-01735.60
CONTRACTFOR ER2L'4y Conservation Improvements, City of Oshkosh, Wisconsin-.�.
IT IS HEREBY AGREEDTHE FOLLOW ING CHANGE IN THE WORK SHALL BE COMPLETED IN ACCORDANCE WITH THE
ATTACHED PROPOSAL ANO SUBJECT TO TERMS OF THE ORIGINAL CONTRACT DATED 10-17-SO
Provic3e a 1-1/2 HP air compressor for the Johnson Control system
at Oshkosh City Hall. Include all power wiring as required.
- Architect's letter o£ 30 June 1981 is attached.
- Contractor's letter of 29 June 1981 is attached.
FOR THE SUM OF (ADD -�{�XJ TWO THOUSAND SIX HUNDRED SEVENTY
•AND NO/lOOTHS---------------------- DOLLARS ($ 2,670.00 �
ADD DEOUCT
PRIOR TO
THIS ORDER
ORIGINAL CONTRACT $ 21 S�% O O. O O
EXTRA ORDERS 2, 6 7 O. O O
7HIS ORDER GREDIT ORDERS
$2,670.00 NONE 2,100.00
TOTA�TO DATE NET TOTA�TO OATE
2�670.00 2,100.00 $256,270.00
APPROVED ACCEPTED
YARBRO/-1fE)MPl ER, ARCHITECTS CITY OF OSHKOSIi, �4ISCONSIN
BY ��� BY
BY
ACCEPTED
VAN ASTEI3 HEATING & SHEET METAL
BY , �alGriu
lSl
BY
C
ry
� � yarbro - ���
�kempinger
�1 architects
�� 101! W. BOUTM PARI( AVENUE • POST OFFICE 80l( 20� • OBFM(08K WIBCANBfN 6N01 • N V278�7310
30 June 1981
Mr. Myron Dodge
Chief of Public Works
U. S. Department of Commerce
175 West Jackson Houlevard
Suite A 1630
Chicago, Illinois 60604 •
REs EDA Project �06-11-01735.60
Our F.ile No. 8006
Enerqy Conservation Improvements
City of Oshkosh, Wisconsin
Mr. Dodqe:
There are three items on the subject project
consideration. Two concern extra work at the
one involvea an extension of completion time.
ITEM NO. 1- City Hall ��-2
which need your
City Hall eite and
It has been determined that the existing pneumatic temperature
control compressor system does not have enough capacity to handle
the extra air required for the added HVAC control. The existinq
compressor ie a 1/4 HP unit. A 1-1/2 HP compreasor is required
at an added cost of $2,670.00. Your concurrence is requested.
ITEM NO. 2- Entire Project, Primarily City Hall
Fluor Bros. Construction Company has requested an extension of
the Contract Completion date by four (4) weeks. The current
date of July 23, 1981 would then be August 20, 1981.
Encloaed is a copy of Fluor Bros.' June 10, 1981 letter making
the request which is self-explanatory. We were asked by Fluor
to consider approvina the use of tha thinner insulated panel,
but declined aince the entire project is enerqy coneervation.
Your concurrence is requested.
ITEM NO. 3- City Hall G-s
The City of Oshkosh is considering changinq an additional 20
windows on the south side of City Hall. As with the original
' contract window �uork, the coneideration is for the conservation
o! enerqy.
r
Page 2
30 June 1981
File No. 8006
Mr. Qodqe
�� 1
8J
The existinq windows are single glazed wood double hung, two
aindows per masonry opening. By installing one thermal broken
with insulatinq glass double hunq aluminum window with ineulation
panels filling the balance of the openinq, a considerable energy
savings will occur.
The additional cost for this work is $29,810.00 which is accep-
table to the Owner.
If this work is autho;ized, the completion time will have to bs
extended eleven (11) weeks from the date of authorization.
Will you please consider this request and authorize a chanqe
order to add the work to Fluor Bros.' Contract for General
Conatruction Work. An early reaponse will be appreciatefl.
Sincerely,
YAR$RO-KEMPINGE&, ARCHITECTS
by
Robert L. Yarbro
RLY/kj
Ena.
ca: Kr. Gordon Ellis, City of Oehkoah
�'
�
��
HEATING & SHEET METAL
APPLETON, WIS. 54911 Rr. S BOX 351D
Phone 788-5611 RANDOLPH DRIVE
Yarbro-Ker�pinger Architects
1018 �!. �outit Park �venue
Oshkosh, Wi 54941
Re : City Ha1,l
Osnkosh, `,Ji
Air compressor
Gentlemen:
June 29, 1981
installation
.�e propose a 12 iiP air conpressor be installed
at the above mentioned job as recomMeaded by
Johnson Controls for the sum of w`2670.00
This price includes power wiring for tne additional
air c�nNressor and the air conpressor starter.
:sincerely,
�.� ����.
r'lo-yd Vanasten
��'V.+/kvd
�f��
�
r-I
�
�
ri
.�
4, �
N
�
i�i
!�
�
�y� N
O �N
� �N
u o
� �
Y �
� �
O �
�
� �
� �
ti
N
+� �.
a a
�
ro ..
� �
v
O •rI
E F+
H
�
'f„y' U
O
+�
�
r'�
W
�
r-i
M
�
a�'i
�
�
� x
� �
� U
�
U