Loading...
HomeMy WebLinkAbout31729 / 82-09February 18, 1982 ll 9 RESOLUTION PURPOSE: AGREEMENT BETWEEN CITY OF OSHKOSH AND HOWARD NEEDLES TArP1EN & BERGENDOFF INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Con¢non Council of the City of Oshkosh that the proper City officials are hereby authorized and directed to enter inCO the attached agreement with Howard Needles Tammen & Bergendoff for engineering services for improvements to the Water Filtration Plant. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from Account No. 810-701, Water Utility, Construction in Progress. SUSYITT�D HY ���� �� �� � �i s f SUPPLEMENTAL TASK ORDER N0. 2 TO THE AGREEMENT DATED APRIL 17, 1981, BETWEEN THE CITY OF OSHKOSH IN THE STATE OF WISCONSIN AND HOWARD NEEDLES TAMMEN � BERGENDOFF FOR PROFESSIONAL SERVICES RELATIVE TO PUBLIC WATER SUPPLY REQUIREMENTS FOR THE CITY OF OSHKOSH 2-1.0 Purpose - � The purpose of this Supplenental Task Order is to establish scope, schedule and payment provisions for engineering services f�r the improvements to specific elements of the Water Filtration Plant, namely: the renovation of the pretreatment basin, the replacement of three existing high service meters, the addition of a 2,000—gallon alum storage tank, and a new combined low lift and high service pumping station. —2.0 Scooe The Consultant will provide the following engineering servicec for improvements to the Water Filtration P1ant: 2-2.1 For the renovation of the pretreatment basin, the Consultant shall: 2-2.1.7 Inspect the existing condition of the pretreatment basin with the assistance of the City, to determine location and extent of a neN single plastic baffle wall to replace the existing baffle walls; and inspect, in the company of City staff, a nearby plant utilizing a similar plastic baffle wall to determine its application in Oshkosh. 2-2.1.2 Utilize available survey information and inform the City of any additional survey data required, which will be furnished by the City. 2-2.1.3 Prepare contract documents consisting of plans and specifications for the renovation of the pretreatment basin with the addition t J � 1 of a single plastic baffle xall along the longitudinal axis of the basin, and furnish the City ten (10) copies of these contract documents. 2-2.1.4 Assist the City in obtaining necessary approvals from the Department of Natural Resources. 2-2.1.5 Prepare construction cost estimates and assist the City in obtaining construction bids and their evaluation. 2-2.1.6 Review shop drawings, provide periodic visits during construction to observe general con— struction progress and general conformance with the plans and specifications, and provide record drawings based on information furnished by the construction contractor and field inspectors of the City's staff. 2-2.2 For the replacement of three existing high service meters the Consultant shall: 2-2.2.1 Inspect the existing condition of the three meters with the assistance of the City, to determine the suitability of continued utilization of the existing primary meter flow tubes with the new meter instrumenta— tion. 2-2.2.2 Utilize available survey information and inform the City of any additional survey data required, which will be furnished by the City_. 2-2.2.3 Prepare contract documents consisting of plans and specifications for the replacenent of three existing high service meters and furnish the City ten (10) copies of these contract documents. 2-2.2.4 Assist the City in abtaining necessary approvals from the Department of Natural Resources. 2-2.2.5 Prepare construction cost estimates and assist the City in obtaining construction bids and their evaluation. 2-2.2.6 Review shop drawings, provide periodic visits during construction to observe general con— struction progress and general conformance 2 � I with the plans and specifications, and provide record drawings based on information furnished by the construction contractor and field inspectors of the City's staff. Z-2.3 For the addition of a 2,000—gallon alum storage tank the Consultant shall: 2-2.3.1 Inspect the existing alum storage facilities with the assitance of the City to determine the suitability of locating the additional alum storage tank adjacent to the existing alum storage tank without the necessity of undertaking structural modification to the filtration plant building. Z-2.3.2 Utilize available survey information and inform the City of any additional survey data required, which will be furnished by the City. 2-2.3.3 Prepare contract documents consisting of plans and specifications for an additional 2,000—gallon storage tank in the vicinity of the existing alum tank and for its ventila— tion system, and furnish the City ten (10) copies of these contract documents. 2-2.3.4 Assist the City in obtaining necessary approvals from the Department of Natural Resources. Z-2.3.5 Prepa.re construction cost estimates and assist the City in obtaining constructfon bids and their evaluation. 2-2.3.6 RevieW shop drawings, provide periodic visits during construction to observe general con— struction progress and general conformance with the plans and specifications, and provide record drawings based on information furnished by the construction contractor and field inspectors of the City's staff. 2-2.4 For the new combined low lift and high service pumping station the Consultant shall: 2-2.4.1 Inspect the existing high service pumping facilities with the assistance of the City to determine the suitability of continued utilization of certain low lift and high service pumping units with the new pumping station. 3 n . 2-2.4.2 Utilize available survey information and inform the City of any additional survey data required, which will be furnished by the City. Z-2-4.3 Advise the City of required geotechnical in- vestigations, solicit and evaluate proposals for undertaking these field investigations, and recommend to the City, for direct con- tracting by the City, of a qualified firm to perform the necessary soil borings and soils analysis. 2-2.4.4 Prepare contract documents consisting of plans and specifications for a new low lift and high service p�mping station and furnish the City twenty (20) copies of these contract documents. 2-2,4.5 Assist the City in obtaining necessary approvals from the Department of Natural Resources. 2-2,4,6 Prepare construction cost estimates, and assist the City in obtaining construction bids and their evaluation ,and with the preparation of an appropriate capital budget amounts for the construction of the new pumping station in 1983• 2-3.0 Schedule The engineering services under this Supplemental Task Order shall commence upon receipt by the Consultant of an executed copy of this Supplemental Task Order, and shall be completed as follows: 2-3.1 The renovation of the pretreatment basin plans and specifications shall be completed by May 31, 1982. 2-3.2 The replacement of the existing high service meters plans and specifications shall be completed by May 31, 1982. 2-3.3 The additional 2,000-gallon alum storage tank plans and specifications shall be completed by May 31. 1982• 2-3.4 The new combined low lift and high service pumping station plans and specifications shall be completed by Qetober 1, 1982. u 2-4.0 Payment Payment for Supplemental follows: �! the engineering services defined under this Task Order shall be on a Lump Sum basis as 2-4.1 Payment for engineering services related to the renovation of the pretreatment basin shall be a Lump Sum Amount of Six Thousand Dollars ($6,000.00). 2-4.2 Payment for engineering services related to the renovation of three existing high service meters shall be a Lump Sum Amount of Six Thousand Five Hundred Dollars ($6,500.00). 2-4,3 Payment for engineering tion of a 2,000-gallon Lump Sum Amount of One ($1,500.00). services related to the addi- aluT storage tank shall be a Thousand Five Hundred Dollars 2-4.4 Payment for engineering services related to the addition of a new combined low lift and high service pumping station shall be a Lump Sum Amount of Fifty- Five Thousand Dollars ($55,000). These Lump Sum amounts shall be full compensation for service rendered and for all labor, materials, supplies, equipment, and necessary incidentals;' except for additional copies of plans and specifications beyond the number of copies included :n the Scope above. Payment for additional copies of plans and specifications for the renovation of the pretreatment basin shall be Nine dollars ($9.00) per set. Payment for additional copies of-plans and specifications for the high service meters and the additional 2,000-gallon alu� storage tank shall be Four dollars ($4.00) per set. Payment for additional copies of plans and specifications for the neu low lift and high service pumping station shall be Forty dollars ($40,00) per set. E IN WITNESS mental Task of sentatives. � � WHEREOF, the parties hereto have caused this Supple- Order No. 2 to be entered into this day 1982, by their proper officers and repre- In The Presence of: �LJ • . �/�L� John W. Curtis, P.E. Project Direetor In the Presence of: Jack W. Schneider DIRECTOR OF PUBLIC WORKS (Seal of City) HOWARD NEEDLES TAMMEN & BERGENDOFF ENGINEERS, ARCHITECTS � PLANNERS rvey K. Hammond, P.E., Associate CITY OF OSHKOSH, WISCONSIN William D. Frueh, CITY MANAGER Converse C. Marks, CITY CLERK I hereby certify that provisions have been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within contract. Approved as to form and execution: John W. Pence, CITY ATTORNEY Edward A. Nokes, COMPTROLLER f� rn � � i�. ��o v �� v q +� S� N N � � � rt� �F� O � � a �+ v a v +� � v3 oz +� i v C S�1 W o ro u -.�30 +� o •J �xc � � v +� o .� tn � u� +� s� ro � �.� v � rz 3ma � a 0 � 0 H C 0 .�, +� 0 � � m N � ro � .� u � rt U N W � � � � � � � 7 s� A N Ga x u N �i U � � .� V