Loading...
HomeMy WebLinkAboutField Inspection Report (Rough Bldg & HVAC) - 02/04/2000 � T F HK TI • � `, CI Y O OS OSH C RRECTION NO CE. �, CONTRACTOR: �1�.�1 Time Insp. Called [n Qy� Date ADDRESS: � `�"' ` ��� Time Insp.Needed Requested By ; Of Phone# Project to be Inspected Comm/Res Means of Access BUILDING: PLUMDING: ELECTRIC: HVAC: � EROSIUN CON"IROL: YROPERTY MA1NT.: Footin ough Rough Rough Tracking Setback Park. Foundatio Test On Scrvice Fumace Silt Fence Unlicensed Veh. Rough Underfloor Amps Ph A/C Stone Acccss Garbage Insulation Scwer/Water Temp Perm Fireplace E.C.Bales Dilapidated bld's, Bsmt.Floor Reinsp. UG OH Reinsp. Reinsp. fences,etc. Reinsp. Final Reinsp. Final Final Ext.Maint. Final Other Final Other Other Other ' Other Other ITEMt! CODE INSPECTION RESULTS � g l.7 �.�-� � l.� ��UJ �`1'� �'zl�1 � Z 24..- � C4�. ►�-� ��u � `� ,� ► 3 �D�. —�-Z�Z �— 'Q-�9�1►� Gc., -�i�S�Li l�o VIOLAT[ONS MUST BE CORRECTED AND APPROVED WITHIN 30 DAYS UNLESS NOTED BELOW CALL FOR INSPECTIONS BEFORE CONCEALMENT AND/OR OCCUPANCY!! COMPLIANCE DATE: � I��� Action Taken: �t Approved/Inspection Report left on site O Not Approved/Inspection Report given to Signed a���� z���� Inspection Services Division Date Of Inspection Phone Number