HomeMy WebLinkAbout32767 / 84-08March l, 1984
l� S RESOLUTION
(CARRIED LOST LAID OVER WITHDRAWN )
PURPOSE: APPROVE AGREEMENT FOR ENGINEERING SERVICES
FOR PUMPING STATION
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
BE IT RESOLVED by the Common Council of the City of Oshkosh that
the proper City officials are hereby authorized and directed to enter into
the Supplemental Task Order No. 4 to the Agreement dated April 17, 1981,
between the City of Oshkosh and Howard Needles Tammen & Bergendoff for
Professional Services relative to Public Water Supply Requirements for the
City of Oshkosh, specifically, engineering services during the construction
of the Low-Lift/High-Service Pumping Station for the Water Filtration Plant,
a copy of which is attached hereto.
BE IT FURTHER RESOLVED by the Common Council of the City of Oshkosh
that the proper City officials are hereby authorized and directed to transfer
money for this purpose from General Fund Equity, Account No. 310-550, to
Account No. 810-701, Water Utility Cons�truction in Progress. Such money to be
repaid out of a future bond issue.
StIEYIT?ID aY
�PPROYED
�
- 14 -
RESOLUTION # 8
SUPPLEt9ENTAL TASK ORDER N0. 4
TO THE
AGREEMENT DATED APRIL 17, 1981, BETWEEN
THE CITY OF OSHKOSN
IN THE STATE OF WISCONSIN
AND
HOWARD NEEDLES TAMMEN � BERGENDOFF
FOR PROFESSIONAL SERVICES RELATIVE TO
PUBLIC WATER SUPPLY REQUIREMENTS FOR
THE CITY OF OSHKOSH
-1.0 Purpose
The purpose of this Supplemental Task Order is to establish
scope, schedule and payment provisions for engineering
services for the improvements to specific elements of the
Water Filtration Plant, namely: engineering services during
the construction of the Lou-Lift/High-Service Pumping
Station.
3-2.0 Scope
The Consultant will provide the following engineering
services under this Supplemental Task Order:
3-z.1 Provide resident engineering services during construc-
tion of the Pumping Station. The level of effort for
this scope element is estimated as follows:
Labor Services
S 7�,550.00
Full-time services for 8 months, 1�5 Days
Part-time services for 8 months, 88 Days
Expenses $ 8,213.00
Per Diem for 8 months at $31.00 per day
Transportation for 32 trips @ $34.00
per trip
Estimated Subtotal
$ 82,763.00
3-z.2 Provide Construction Monitoring through the review of
Contractor's Shop Drawing Submittals, periodic site
visits by key design staff, and provide administrative
support. The level of effort for this scope element
is estimated as follovs:
- 14a -
Labor Services
Shop Drawing RevieWS,
Eourteen Site Visits,
Administrative Support,
Expenses
Architectural (ZDG), $1,650.00
Indianapolis-Oshkosh 2 trips @
$300.00 per trip
Transportation for 12 trips Q
$34.00 per trip
Estimated Subtotal
RESOLUTION # 8
24 Days
14 Days
16 Days
S 22,992.00
$ 2,658.00
$ 25,650.00
3-2.3 Provide Record Drawings upon completion of construc-
tion, based cr. infcrmaticn tc be furnished by ±he
constructing contractor. The level of effort for this
scope element is estimated as follous:
Labor Services
Prepare 20 Record Drauings
10 Days
Expenses
Provide Record Mylars @$5.00 per sheet
Estimated Subtotal
Estimated Totals For This Supplemental Task Order:
Labor Services 327 Days
Expenses
Estimated Total
3-3.0 Schedule
$ 2,480.00
$ 100.00
$ z,580.00
$100,022.00
10,971.00
$110,993.00
The engineering services under t.",:s Supplemental Task Order
shall commence on March 1, 1984 and upon receipt by the
Consultant of an executed copy of this Supplemental Task
Order, and shall be completed July 1, 1985, upon completion
of the construction of the Low-Lift/High-Service Pumping
Station.
- 14b -
RESOLUTION # 8
3-4.0 Payment
Payment to the Consultant for all work performed in accord-
ance with this Supplemental Task Order shall not exceed
$111,000 without written prior approval by the City, and
shall be on the basis of direct payroll times a multiple of
2.6, plus direct expenses.
3-4,1 Direct payroll is defined as the actual hourly rate
paid to the employees of the Consultant directly
attributable to the project.
3-4.2 Direct expenses are in addition to compensation to the
Consultant for his direct services and include expe�d-
itures made by the Consultant, his employees or his
subconsultants in the interest of the project. Direct
expenses include but are not limited to:
3-4,2,1 Expense of transportation, subsistence and
lodging when traveling in connection uith the
project.
3-4.2.2 Expense of all reproduction, postage and
handling of draaings, specifications, reports
or other project-related work products of the
Consultant.
3-4.2.3 Expense of computer time including charges
for proprietary programs.
- 14c -
RESOLUTION # 8
IN WITNESS WHEREOF, the parties hereto have caused this Supple-
mental Task Order to be entered into this day of
, 7984, by their proper officers and repre-
sentative.
In Presence of:
John W. Curtis, P.E.
Project Director
In Presence of:
Gerald F. Konrad, P.E.
DIRECTOR OF PUBLIC WORKS
(Seal of City)
HOWARD NEEDLES TAMMEN 6 BERGENDOFF
ENGINEERS, ARCHITECTS � PLANNERS
Harvey K. Hammond, P.E., Associate
C1TY OF OSHKOSH, WISCONSIN
William D. Frueh, CITY MANAGER
Donna C. Luebxe, CITY CLERK
I hereby certify that provisions have been made to pay the
liability that xill accrue to the City of Oshkosh, Wisconsin,
under the uithin contract.
Approved as to form
and execution:
John W. Pence, CITY ATTORNEY
Edward A. Nokes, FINANCE DIRECTOR
- 14d -
HNTB No. 0140-29-OS CONPRO 1/32
RESOLUTION # 8
DETAILED COST ESTIMATE
FOR
SUPPLEMENTAL TASK ORDER N0. 4
3-2.1 Provide Field Resident Engineering Services
Labor Services
8 months full-time � 8 months part-time
35 wks. x 40 hrs./wk. x$35.50/hr.
35 wks. x 20 hrs./wk. x E35.50/hr.
Subtotal for Labor:
_ $ 49,700.00
= 24,850.00
$ 74,550.00
Expenses
Per Diem @ $31.00/day, trips @ $34.00/trip
35 uks. z 5 days/wk, x$31.00/diem = 5,425.OU
82 trips x $34.00/trip = 2,788.00
Subtotal for Expenses:
Total for 3-2.1
3-2.2 Provide Construction Monitoring
Labor Services
Shop Drauing Reviews
192 hrs. x $49.50
Site Visits
14 Visits x S hrs./day x$61.00/hr.
Administrative Support
8 hrs/month x 16 oonths x$52.o0/hr
Subtotal for Labor
Expenses
ZDG Architect (Shop Drawing Revieas,
1 trip)
2 trips, Indianapolis - Oshkosh
12 trips (MilWaukee) @ $34/trip
Subtotal for Expenses
tal for 3-2.2
- 14e -
8,213.00
E 82,763.00
_ $ y,504.00
= 6,832.00
= 6,656.00
$ 22,992.00
= 1,650.00
= 600.00
, 408.00
g 2,658.U0
E 25,650.00
3-z•3 Provide Record Drawings
Labor Services
20 Sheets x 4 hrs./sheet x$31.00/hr
Expenses
Mylars of 20 Sheets
Total for 3-2.3
Recap Estimated Totals
Labor
3-2.1
3-2.2
3-2.3
Subtotal
Expenses
3-2. 1
3-2.2
3-2.3
Subtotal
TOTAL
HNTB No. 0140-29-08
- 14f -
263 Days
54 Days
10 Days
327 Days
RESOLUTION # 8
_ $ 2,480.00
0 100.00
S 2,580.00
S 74,550.00
22,992.00
2,uao.00
$100,022.00
S 8,213.00
2,658.00
100.00
$ 10,971.00
;110,993.00
CONPRO 1 /3�4
C] °� �
rt �, �
�c < ri �
�
(� :
N �- r
m ; ' �
n �
Y, � r
�
�\ m
� „ �
�� .
� _.
���
�.,
�
�
\
i�,�..�.,.+ .: 3 r.�'. a�: . M°:. �� i
� f
i �
d
` +�w.�w.ww�e......a..�
� ��.. n
........��..-..-.�..........�. �..�_�
C3`: �'A°.Se
� � H �
r� C � �'
O F'� N O
� n rh ri
.. mmr•
Ul �l' N
m
n H ro ro
� O O O l7
7�J � � H �
i-+ a ro L�] c�r
oro � w w
•• rr n7 r� n
w � rr
� m
'y iO N N
m m �• a
N � �A �7
rt G
m r- �
-- o a
�
m
�
0
N
G
rt
r•
0
�
a
m
; ,i
r
�,n
.�
. 'i