SET WAGE RATE SCALE FOR PUBLIC WORKS PROJECTS FROM
JULY 1, 1984 TO JUNE 30, 1985
DEPARTMENT OF PUBLIC WORKS
WHEREAS, Section 66.293 of the Wisconsin Statutes provides that
it shall be the duty of every city which proposes the making of a
contract for any project of public works to determine the rate of
wage scale which shall be paid by the contractor to the employees
upon such project, and reference to such scale having to be pub-
lished in the notices issued-for the purposes of securing bids
for any projects;
NOW, THEF.EFORE, BE IT RESOLVED by the Common Council of the
City of Oshkosh that 'the attached schedule marked "Exhibit A" and
made a part hereof as though fully set out at length herein is
hereby determined to be the rate of wage scale for such public
works; and the City Clerk is directed to file same and to use
same in connection with and as directed by said statutes, same
being the rate of wage scale published by the Builder and
Construction Trades Council of Oshkosh and vicinity, and same shall
remain in full force and effect; and in the event that the present
contracts now under negotiations are adopted resultir.g in an
increase in the rate of wage scale over and above these established
in the schedule marked "Exhibit A", the same wage scale adopted
as the result of said negotiations shall automatically become
the rate of wage scale for the City of Oshkosh as required by
Section 66.293.
-26-
SUB6iiTTED BY
.CPPR07ED
�
Egual R?•ghts Division
Labor Standards,8ureau
P. 0. Box 8928
Hadison, GI 53708
608-266-3193
or 266-6469
PREVAZLING WAGE RATE DETEEUIINATION Page 1 of 5
RESOLUTION # 18
Issued by [he State of Wisconsin
Department of Industry, Laboc and Human Relations
Name of Municipality or State Agency Soliciting or Negotiating Bids: City of Oshkosh
Name and/or Description and Location of Project: All Public Gorks Construction Projects
Subject to ss. 66.293(3), Vis. Stats.
Project No.:
DETERHIN6TION NO.:
Issued Pursuant to: % ss. 66.293(3), Wis. Statutes
s. 103.49, Gis. Statutes
Issued On: Expires On:
None hfAR 1 b 198� Until Superseded
These Wage Rates are applicable to thia project ONLY. See enclosed correspondence for
additional information.
Hourly Hourly Contributions Are For All Hours
Basic Worked Dnless Footnoted
Trade or Occupation 1� Rate H 6 W Vacation Pension Other Total
s s s a s a
Asbestos Gorker ?� 16.50 1.41ak .85 .50 .10A��+.40B 19.76
Boilermaker ?� 17.345 1.�5 1.15 .10A 20.35
Bricklayer 12.70 1.45 .97 .02A 15.14
Carpenter 13.61 1.15 1.00 .06A 15.82
Carpet Layer 13.61 1.15 1.00 .06A 15.82
Cement Finisher 12.20 1.45 .97 .02A 14.64
Electrician 15.45 1.55 5-1/2% 1/29.A 17.93
Elevator Constructors:
Hechanic
Hechanic's Helper
Probationary Helper
Glazier
Ironworker
Lather
Paintec-Brush
Painter-Spray
Plasterer
Plumber
Sheet Hetal Worker ?�
Sprinkler Fitter
Steamfitter
Terrazzo Finisher ?�
Terrazzo 4lorker
Tile Finisher ?�
Tile Setter
Truck Driver:
Regular
Tandem and Semi
Well Drillec ?�
WI-OSHKOSH 0600e
17.125
11.99
8.56
12.98
14.81
12.66
13.35
13.85
12.70
13.72
13.66
16.67
13.72
12.05
12.70
11.95
12.70
13.42
13.50
13.47
1.495
1.495
1.18@
2.00
1.45
1.20
1.20
1.45
1.35
1.45
1.55
1.35
1.60
1.45
1.60
1.45
Per TIo.
201.79
201.79
1.85
8�
8�
1.00
1.46*
1.25
2.25
1.25
APR 0 u ?3�1�".
cirv e�cn�
WK09H. \N
1.13
1.13
1.35
1.65
.35
.35
.97
1.73
.72
1.60
1.73
1.00
.97
1.00
.97
Per Wk.
51.00
51.00
.60
.065G+I
.065G+I
I
.95D@
20A+2.00C*
.06A
.02A
.OlG
08A+.75F
.08A
.O1G
02A
02A
21.65
15.96
8.79
16.11
zi.a2
15.82
14.90
15.40
15.14
18.06
18.91
19.90
18.06
14.65
15.14
14.55
is.ia
15.86
15.94
15.92
- 26a -
,„. ...
DETERHINATION N0. None
RESOLUTION # 18 pgge 2 of 5
Hourly Hourly Contributions Are For All Hours
Basic iJorked Unless Footnoted
Trade or Oceuoation 1� Rate H 6 W Vacation Pension Other Total
E S S � � E
Laborers-Building Construction:
General Laborer ?�
Hod Carrier
Mortar lSiaer
Plaster Mixer
Air Spade
Plasterer Tender
Jackhammer
Laborers-Sewer, Yater, Tunnel
Blaster
Bracer
8anhole Builder
Caulker
Pipelayer
Bottomman
Laborer ?�
Power Tool
Raker/Luteman
Laborers-Landscaping:
Landscaper
Novice-lst Year
Novice-2nd Year
Roofer
Roofer's Helper:
Starting Rate
After 500 Hours
After 1,000 Hours
After 1,500 Hours
After 2,000 Hours
After 2,500 Hours
After 3,000 Hours
After 3,500 Hours
After 4,000 Hours
After 4,500 Hours
Aftec 5,000 Hours
10.93
11.03
11.18
11.18
10.93
11.03
11.18
1.00
1.00
1.00
1.00
1.00
1.00
1.00
and Street Construction:
12.29 1.00
12.29 1.00
12.29 1.00
12.29 1.00
12.64 i.00
12.29 1.00
12.09 1.00
12.29 1.00
12.29 1.00
9.00 1.00
4.55 1.00
6.05 1.00
11.75 1.10 .75
8.90
9.22
8.81
9.14
9.46
9J9
10.12
10.44
10.77
11.10
11.42
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
WI-OSHKOSH 0018e
- 26b -
75
75
75
75
75
75
75
75
75
.65
.65
.65
.65
.65
.65
.65
.65
.65
.65
.65
.65
.65
.65
.65
.65
65
65
65
75
75
75
75
75
75
75
75
75
75
75
75
.03A
.03A
.03A
.03A
.03A
.03A
.03A
.03A
.03A
.03A
.03A
.03A
.03A
.03A
.03A
.03A
12.61
12.71
12.86
12.86
12.61
12.71
12.86
13.97
13.97
13.97
13.97
14.32
13.97
13.77
13.97
13.97
10.65
6.20
7.70
14.35
10.75
11.07
11.41
ii.�a
12.06
12.39
12.72
13.04
13.37
13.70
14.02
DETERIIINATION NU. None
RESOLUTION # 18
Page 3 of 5
Nourly Hourly Contributions Are For All Hours
Basic Horked Unless Footnoted
Trade or Occupation 1� Rate H S W Vacation Pension Other Total
a s s a s a
Operating Engineers-Building Construction:
Class 1
Class 2
Class 3
Class 4
Class 5
15.72 1.85
15.22 1.85
14.44 1.85
13.88 1.85
13.41 1.85
1.25
1.25
1.25
1.25
1.25
.07A
.07A
.07A
.07A
.079
Class 1 Haster Hechanic; Foreman; Crane; Shovel; Dcagline; Bacichoe; Clamshell; Derciek;
Caisson Rig; Pile Driver; Skid Rig; Dredg� ar.d Travel3ng Crane (Bridge Type);
Conccete Paver (Over 27E); Concrete Spreader and Distributor.
18.89
18.39
17.61
17.05
16.58
Class 2 Concrete and Grout Pump; Haterial Hoist; Stack Hoist; Tractor or Truck 2Sounted
Hydraulic Backhoe; Tractor or Truck Hounted Hydraulic Crane (10 Tons or Under);
Hanhoist, Tractor, Bulldozer, Endloader (Over 40 H.P.); ?[otor Patrol; Scraper;
Sideboom; Straddle Carrier; 17echanic and Welder; Bituminous Plant and Paver; Roller
(Over 5 Tons); Rail Leveling Hachine (Railroad); Tie Placer; Tie Eatractor; Tie
Tamper; Stone Leveler; Rotary Drill and Blaster; Percussion Drilling lfachine;
Trencher (Wheel Type or Chain Type Having Over 8-Inch Bucket); Elevator.
Class 3 Backfiller; Concrete Auto Breaker (Large); Concrete Finishing Hachine (Road Type);
Roller (Rubber Tire); Concrete Batch Hopper; Concrete Conveyor System; Concrete
Niaer (14S or Over); Sccew Type and Gypsum Pump; Tractor, Bulldozer, Endloader
(Under 40 H.P.); Pump (Well Points); Trencher (Chain Type Having 8-Inch Bucket and
Under); Industrial Locomotive; Roller (Under 5 Tons); Fireman (Pile Driver and
Derrick); Hoist (Automatic); Forklift (Over 12'); Tamper-Compactor (Riding Type);
Assistant Engineer; "A" Frame and Winch Truck; Concrete Auto Breaker; Hydrohammer
(Small); Broom and Sweeper; Hoist (Tugger); Stump Chipper (Large); Boat (Tug,
Safety, Work Barge and Launch).
Class 4 Shouldering Hachine; Screed; Farm or Industrial Tractor with tlounted Equipment;
Post Hole Digge*; Stone Crusher and Screening Plant; Fireman (Asphalt Plants); A.ir
Compressor (400 CFH or Over); Auger (Vertical and Horizontal); Air, Electric,
Hydraulic Jack (Slipform); Prestress Nachine; Skid Steer Loader; Boiler (Temporary
Heat); Forklift (12' and Under).
Class 5 Generator (Over 150 KW); Pump (Over 3"); Combination Small Equipment; Compressors
(Under 400 CFti); Welding Nachine; Heater (Hechanical); Generator (Under 150 KW);
Pumps (3" and Under); Winch (Small Electric); Oiler and Greaser; Rotary Drill
Helper; Conveyor.
WI-OG2 o01ae - 26c -
DETER7fINATION NA. None
RESOLUTION # 18 P8$e 4 of 5
Hourly Hourly Contributions Are For All Houra
Basic Worked Unless Footnoted
Trade or Occupation 1� Rate H 6 W Vacation Pension Other Total
� S E S ; S
Operating Engineers-Sewer and Water Construction:
Class 1
Class 2
Class 3
Class 4
Class 5
Class 6
Class 7
15.72
15.22
14.97
14.55
14.43
13.87
13.40
1.85
1.85
1.85
1.85
1.85
1.85
1.85
1.35
1.35
1.35
1.35
1.35
1.35
1.35
.07A
.07A
.07A
.07A
.07A
.07A
.07A
Class 1 riaster lfechanic; Foreman; Backhoe; Shovel, Dragline, Clamshell (3 Cu. Yards and
Over).
18.99
18.49
18.24
17.82
17.70
17.14
16.67
Class 2 Crane; Derrick; Shovel; Dragline; Backhoe; Clanshell (Under 3 Cu. Yards); Caisson
Rig; Pile Driver; Skid Rig; Dcedge and Traveling Crane (Bridge Type); Concrete
Paver (over 27E); Concrete Spreader and Distributor.
Class 3 Aaterial Hoist; Stack Hoist; Tractor or Truck Mounted Hydraulic Backhoe; Tractor or
Truck lSounted Hydraulic Crane (5 Tons or Under); Manhoist; Tractor, Bulldozer,
Endloadec (Over 40 H.P.); Forklift (25' and Over); Plotor Patrol; Sccaper; Sideboom;
Straddle Carrier, tiechanic and Welder; Bituminous Plant and Paver; Roller (Over S
Tons); Rotary Drill and Blaster; Trencher (Wheel Type or Chain Type Having Over
8-Inch Bucket); Elevatoc, Percussion Drill.
Class 4 Concrete and Grout Pump; Backfiller, Concrete 8uto Breaker (Large); Concrete
Einishing Hachine (Road Type); Roller (Rubber Tire); Concrete Batch Nopper,
Concrete Conveyor System; Concrete llixer (14S or Over); Screw Type and Gypsum Pump;
Tractor, Bulldozer, Endloader, (Under 40 H.P.); Pump (Well Points); Trencher (Chain
Type Having Bucket 8-Inch and Under); Industrisl Locomotive; Roller (Under 5 Tons);
Fireman (Pile Driver and Derrick).
Class 5 Hoist (Automatic); Forklift (12' to 25'); Tamper-Compactor (Riding Type); Assistant
Engineer; "A" Frame and Winch Truck; Cencrete P.uto Breaker; Hydro-Hammer (Small);
Broom and Sweeper; Hoist (Tugger); Stump Chipper (Large); Boat (Tug, Safety, Work
Barge and Launch).
Class 6 Shouldering Hachine; Screed; Farm or Industrial Tractor with Hounted Equipment;
Post Hole Digger; Stone Crusher and Screening Plant; Fireman (Asphalt Plant); Air
Compressor (400 CFti or Ovec); Auger (Vertical and Horizontal); Air, Electric,
Hydraulic Jacks (Slipform); Pre-Stress Hachine; Skid Steer Loader; Boiler
(Temporary Heat); Forklift (12' and Under).
Class 7 Generatoc (Over 150 KW); Pump (Over 3"); Combination Small Equipment; Compressor
(Under 400 CFH); Welding Hachine; Heater (Hechanical); Generator (Under 150KW);
Pump (3" and Under); Winch (Small Electric); Oiler and Greaser; Rotary Drill
Helper, Conveyor.
WI-OE2 OO15e - 26d -
DETERNINAI'ION M0. None �SOLUTION # 18 PBge 5 of 5
Standard Footnotes:
* Contribution Increases in Same Proportion as Overtime.
# 611 Straight Time Hours Worked.
@ All Hours Yorked to a Haximum of 2,000 Hours Per Year.
! Not to Exceed 40 Hours Pay.
!! Not to Exceed Tti+o Weeks Pay.
� All Nours Vorked to a Naximum of 40 Hours Per Week.
Other Benefits Footnotes:
A Apprenticeship, Skill Improvement or Training Fund.
B Holiday Pay.
C Trusted Annuity Plan or Fund.
D lioney Purchase Fund.
E Sia Paid Holidays.
F Union Annuity Fund.
G Education Fund.
H SASriI Trust Fund and/or Prepaid Prescription and Legai Service Fund.
I Seven Paid Holidays.
J Eight Paid Holidays.
�� 7he "prevailing hours of labor" for all classes of laborers and mechanics are eight hour per day and forty
hours per calendar week. Al1 work perfornied in excess of these prevailing hours must be paid at a rate of at least
1-I/2 times the hourly basic rate of pay (plus fringe benefits if applicable).
?� A rate for learner, helper, preapprentice or trainee for this trade or occupation is available upon request.
If use of such rate is contemplated, request such rate rp ior to starting `+ork on the project.
ss. 66.293(3)(a)(e), Wis. Stats.
Any contractor, subco�tractor or agent thereof, who fails to pay the prevailing rate of uages detertnined by the
department under this subsection or pays less than t-1/2 times the hourly basic rate of pay for hours worked on the
project in excess of the prevaiting hours determined under this subsection, shall be liable to the enployes
affected in the amount of their unpaid minimim wages or their unpaid overtime cmpensation and an additional amount
as liquidated dartages. Action to recover the liability may be maintained in any court of crnpetent jurisdiction by
any one or more employes for and in behalf of himself and other ertployes similarly situated. No employe shall be a
party plaintiff to any such action unless he gives his consent in Nriting to become such a party and the consent is
filed in the court in which the action is brought. The court shall, in addition to any judgnent awarded to the
plaintiff, allar a reasonable attorney's fee and costs to be paid by the defendant.
Each contractor, subcontractor or agent thereof participating in a project covered by this subsection shall keep
full and accurate records ctearly indicating the name and trade or occupation of every laborer, workman or mechanic
employed by him in connection aith the project and an accurate record of the nianber of hours rrorked by each ertploye
and actual Nages paid therefor.
WI�IUNICIPAL 0006e - 26e -
C] � 4
N- G
'C �C
�] � tn
r
n �
x �o
r=� �
,�
�J
h
�
....�...�. ... . .�.. __.... .._ . ..__.. _.,
C_.. . ,.. '
S: 'J�` ... ,.. . � 1
� � .....�.�.... .._- _.....�. . _.._... �
i
� t
j_.___.. _..._.......__....__ •
} E
� ; iJ, l{
_......__ ._._ _. _ .,_ . J
,..�. _ __.,_.___._.�_ _. __._.___ __ .. . __� _.._..
� � z
o ro m
rF 'b m
O O �
� C �
•• cD I--�
�
�
ny a
�o �
x m
��
H R+ [A
tr] O f1
d �u w
• rt r
m
�
�
m
m
rn
�
:�'
��
�F