Loading...
HomeMy WebLinkAbout32969 / 84-12. , July 19,. 1984• (CARRIED PURPOSE: INITIATED BY /il2 RESOLUTION LOST LAID OVER WITHDRAWN ) APPROVE CHANGE ORDER TO SUPPLEMENT TASK ORDER DEPARTMENT OF PUBLIC WORKS WHEREAS, the EDA has required that payment for the engineering services on the low lift/high service pumping station for the City of Oshkosh be on the basis of cost plus fixed feee, and WHEREAS, the original Task Order No. 4 was based on a different compilation of fee, and WHEREAS, the cost of Supplemental Task Order No. 4A will be identical to the previously approved Task Order No. 4, NOW, THEREFORE, BE IT RESOLVED by the Cou�on Council of the City of Oshkosh that the proper City officials are hereby authorized and directed to enter into Supplemental Task Order No. 4A to the Agreement dated April 17, 1981, between the City of Oshkosh and Howard Needles Tammen & Bergendoff for Professional Services Relative to Public Water Supply Requirements for the City of Oshkosh. SUBMITTED BY APPROYED — 18 — I J RESOLUTION #12 H�/ARO NEEOLES TAMMEP S 8� BERGENDOFF Jul,r 12, 198� Mr. Gerald F. Konrad, P.E. Director of Public k'orks City of Oshkosh 215 Church Avenue Oshkosh, WI 54901 Re: Low-Lift/High Service Water Pumping Station at Water Filtration Flant Dear Mr. Konrad: In response to your request, we have restructured Supplemental Task Order No. 4 to a;ost plus fixed fee basis of payment. The restn:ctured Supple- mental Task Order No. 4A is worded to be -etroactivs to M�rch 1, 1984, and thereby supersedes the earlier signad task order. It is our understanding that the Economic Development Administration (EDA) requires this change in payment format, and will approve a retroactive contract. Please note that the restructurc-d task order includes the exact same costs as approved by tie Gi.ty earlier. Six copies of the restructurec' task order are enclosed for your approval. If acceptable, please return two signed copies to us, and forward one signed copy to the EDA for their review and �pproval. Also enclosc3 for your records is a copy of a letter dated July 12, 1983, from the U.S. Defense Contract Audit Agency, which documents their audit of our over- head rates. Very truly yours, hOF�ARD :vEEuLcS TAriui�N m tih:KG�:NDOFF �.- �� /� (J4 n W. Curtis, P.E. /Principal Engineer Enclosures cc: Mr. Thomas J. Ronrad w/enclosure copy Am�ilecls Engineen Pbr-�en HtiTB 8552 68t5 West Capiloi Driva, Milwaukee, Wisconeln SJ]16.<I< <63-]310 Fannen James f Fmn PE Gao� l Mememan FE. Ge�am F Fo. FE Browning Cww PE C�aries T. Henmgan PE EOga� B Jonnson PE Damei J Wa:k�ns PE L�a���e� J 50�9ai FE John L Colmn FE Franos X Nail PE. RoOen S Cortia fE �onaid A. Dupies FE. Wa��am Love AIA. William C Merea�l� PE fioce�� D Mn�n PE. ;�m: s L Tunle. Jr. PE, Hagn E Scnail FE AuoNate� Daniel J Appei GE. Poben K' Ric�ares PE Don R Otl PE. Freaenck H SterRni PE PooeY� 8 KolMar FE. KeMall T Lmco�n CPA. Ja<r. P S�ead GE. .� :ens W Smn�mm CE Jaa C Trameson FE RKnsa D Bxsman PE. Jonn A Eygen nin. narry D 6erwssa PE. RaiM E Aoorson PE. Cao� P Co�nis �E _,u non G G�.]tlard i'E Harvey K Hammona L PE Sianrev I Mast PE. Robm� W Anna FE Cary C G000man AIA. Waun S+�a�xo PE. Goraon H Sianev Jr PE :.tn��•� O Russel CE. Roiana Y4a05wonn „ F[ Aoss L Jenstn AIA. Franh T L3mm P[ Ale�aiv]m f Silaav PE JMn K Wi9N PE T�cm.as K Oya PE Roc,ro W 4vons •�iA. M Je�ome BWler PE 9�.��4e M G neie PE M1LCnael P Inyaru�a CE. Bcrnam L Pnnce �'F Slrpnon C Ow��n FE 011lce� Ait.anmm Vq. n�lania G� Bamn nouqe �d (ios,on A�A Cope Gora� R. Cospe� Wv C�aimsmn 54 Gnanesmn, Wv Cmcago. LL Gevrgao JN.Oai�as T%. ,.r i�. r CO F.I�Ilifi� NJ H�]uSlon 1X Il:: ]�.i��`Ii5 iry Y3�15.151..�V M1�l� LPxin�]IJn. �vIN lOSAnyr`I 5. C�1 tili�ll�ti 1L.MiIw�1�lY.fC WI MTne�poi s AIN NCw0�1. ec Niw YO�x NY ♦� ]n�o Fl O�JiaOa Park. 8$. PNI�p��10��� P� �'�0�41� 4Z. SCa1�1C WA i�ltnCa. FL iulsa (1N PenA9y` �I,ilyy5�a Rio �]C y111L�0 �i0zll - 18a - . _....,,�-d.,,.,...�._ ..,�r � IM IIpLT 11(1L11 lO 3201-3F23G014 DEFENSE CONTRACT AUDIT AGENCY CHICAGO REGION ST. LOUIS FiRANCH OFFICE . 21 O NORTH 7UCKER BLVD.. ROOM 1 14B ST. LOU15. MISSOURI 631 D 1 Mr. A. Buenqer Howard Needles Tam.�en 5 fiergendoff 9200 Ward Parkway, P.O. box 299 Kansas City, t;issouri 64141 Dear Sir: RESOLUTION #12 12 July 19c^� tde have co-pleted our revier of your projected Calenda_- Years 1963 and 1984 burden TdLES and, as discussed with you on 24 June 1903, the rate= ;re as fo]loa�G: . Direct Payrcll Ease S!raight Time Payroll Base 1963 124.16€ 124.80% 1984 122. 60 0 123.25� The primary purpose o_` these rates is for use as nrovisional billinc rates on cost reimbursement contracts. It should be noted the rates are subject to adjustment during the year shouid =_�seouent revieM� indicate significar.t di`ferences or if any nariicular contract's s�ecial crovisior,s affect tne r�tes. S�me of your contracts cor�tain special cortract provisions a_`fectinc t^e rates. The provisional ti.l:i�c rates s?�oul� be adjested for an}• special contract provisions w:hen a:propriate. Defense Contract Avdit Agency �� �C"*b--,� 7`7'�R'a*.� � f'b a�cn h;anaaer i/ - 18b - J ./ . . i�r�� ° HO�NnRO NEEOl.ES TAMMEN 6 BEAGENOOFF To Office EngineersJOffice Managers FrOm Allan G. Buenger SuD�eC� Provisional Overhead Ra[es - 1983 and 1984 RESOLUTION �12 Interoffice Correspondence Date JUly 14, 1983 DCAA has completed a reviev of our projected overhead rates for 1983 and 1984. A copy of their report is attac}�ed to Chis memo. These ra[es ma}� be analyzed as to salary-relaced and other expenses, as sho�,m in che followin�, cabulaticn. 1983 - Direct Payroll - Scraight-Time Payroll 1934 - Direct Payroll - Straight-Time Payroll , A.*tG/mg Enclosuie ec: Parcners/Associates x Salary- Related Expenses 40.62 40.83 41.49 41.71 �(/� � — 18C — Other Expenses 83.54 83.97 81.11 81.54 Total 124.16 124.80 122.60 123.25 SUPPLEMENTAL TASK ORDER N0. 4A TO THE ACREEMENT DATED APRIL 17, 1981, BETWEEN THE CITY OF OSHKOSH IN THE STATE OF MISCONSIN AND HOWARD NEEDLES TAMMEN � BERGENDOFF FOR PROFESSIOVAL SERVICES RELATIVE TO PUBLIC KATER SUPPLY REQUIREHENTS FOR THE CITY OF OSHKOSH 4-1,0 Purpose RESOLUTION #12 The purpose o: this Supplemental Tasi; Order is to establish sco;�e, schedule ar,d payment provisions for engineering services for the improvements to specific elements of the Water Filtration Plant, camely: engineering services during the construction of the LoW-Lift/High-Service Pumping Station. 4-2,0 Scope The Consultant will provide the folloWing engineering services under this Supplemental Task Order: 4-2.1 Provide resident engineering services during construc- tion of the Pumping Stati;;n. The level of effort for this scope element is estimated as fol'_ows: Labor Services Pull-time services for B months, Part-time services for 8 months, Expenses Per Diem for $ Transportation per trip 175 Days 88 Days months at $31.00 per day for $2 trips estimated @ $34,00 4-2.2 Provide Construction h:onitorirg through the review of Contractor's Shop Drawing Submittals, p^riodic site visits by key design staff, and provide administrative support, The level of effort for this scope element is estimated as folloas: -1- ��� ��...� � RESOLUTION #12 Labor Services Shop DraWing Reviews, Z4 Days Fourteen Site Visits, 14 Days Administrative Support, 16 Days Expense; Architectural (ZDG), E1,650.00 (Lump Sum pmount) Indianapolis-Oshkosh 2 trips estimated at E300.00 p�r *rip Transportation for 12 trips e::timated at ;34.00 per trip 4-2.3 Provide Record Drauings upon comp;.etion of construc- tion, based on 'nformation to b�� furnished by the constructirg contractor, The Ievel of effort for this scope element is estimatcd as fclloWS: Labor Services Prepare 20 Record Drawings 10 Aays Expenses Provide Record Mylars estimated @ ES.00 per sheet -3.0 Schedule The engineering services under this Supplemental Task Order shall commence on March 1, 19$4 and shall be completed July 1, 198�, upon completion of the construction of the LoN-Lift/ High-Service Pumping Statio�:. -Z- - 18e - RESOLUTION #12 4-4.0 Payment Payment to the Consultant for all Work performed in accord- ance uith this Supplemental Task Order shall not exceed $111,000 without written prior approval by the City, and shall be on the basis of cost plus fixed fee, as the sum of: 4-4,7 Direct labor payroll, which is defined as the actual hourly rate paid to the employees of the Consultant directly attributable to the prnject; 4-4.2 Indirect costs, which are defined as all the sal�ry related costs and general overhead costs of the Consultant, for indirect payroll connected costs such as sick leave� vaoation, holiday, incentive pay, unemployment, excise and payroll tsxes, insurarce, retirement, medical and insurance benefits; and for general overhead costs; 4-4,3 Other direct costs, which include expenditures made by. the Consultant, his employees, and lump sum costs of subconsUltants in the interest of the project, and consist.of but are not limited to: 4-4.3,1 Expense of transportation, subsistence and lodging When traveling in connection xith the project, 4-4.3.2 Expense of all reproduction, postage and handling of drawings, specifications, reports or other project-related work products of the Consultant, �-y.3.3 Expense of computer time including charges for proprietary progra::�s; and 4-4.4 A fixed fee amount of 573,0�6.00 This Supplementai Task Order No. 4A shall be retroactive to March 1, 1984 and shall supersede Supplemental Task Order No. 4, which was authorized March 1, 1984 and which aas executed March 6, 1984. The Consultant shall adjust all invoices for Work performed on this Supplemental Task Order No. 4A to the cosL plus fixed fee basis for payment, as stipulated herein, -3- - 18f - ..� RESOLUTION #12 IN WITNESS WHEREOF, the part!es hereto have caused this Supple- mental Task Order to be entered int� this day of , 7984, by their proper officers and repre- sentative. In Presence of: HOI;ARD NEEDLES TAMMEN � BERGENDOFF ENGZNEERS, ARCHITECTS � PLANNERS — ' � J+ ! nn W. Curtis, P.E. Harvey . Hammond, P,E., Associate Project Director ' , In Presence of; Gerald Fr Konrad, p,E. DIRECTOR OF PUBLIC'WORKS (Seal of City) CZTY OF OSHKOSH, WZSCONSZN William D. Frueh, Donna C. Luebke, CITY C 0 Y�i�\<A-l�\� I hereby certify that provisions have been made to pay the liability that xill accrue to the City of Oshkosh, Wisconsin, under the within contract, Approved as to fo�•m and execution: Joh❑ iJ. Pence, CITY ATTORN HNTB No. 0140-29-OS Edward A. Nokes, FINANCE DIRECTOR -4- CONPRO 1/32 - 18g - � 0 DETAILED COST ESTIMATE FOd SUPPLEMENTAL TASK ORDE3 N0. 4A Direct Labcr Description Project Mar,ager Sr. Engiener Engineer Techriciar, Clerical Direct Labor Totals: Ir.direct Costs Descriptior. Salary Fel:_ted Costs General Ov:rr.:.rd Costs Ir.direct Costs Tctals: Estimate Hours 750 Z32 2,124 80 30 2,616 Hrs. Rate 0.4149 0.8711 1.226: Other Direct Costs Travel, Transportatior. Travel, Per Diea Reproductior. ZDG Architect (Lump Sum Subcor.tract) Other Direct Costs Total: Total Estimated Cost Fixed Fee Totel for Supplemental Task Order No. 4A: HNTB No. 0140-29—OB —�— — 18h — Average Hourly Rate 24.20 20.67 13.85 12.00 9.00 X Base = 39,073. 39,073. RESOLUTION #12 Estimated Cost S 3,630. 4,796. 29,417. 960. 270. S 39,073. Estimated Cost $ 16,211. 31,692. S u7,9o3. $ 3,796. 5,425. 100. 1 ,650. $ 10,971. $ 97,947. 13.046. $110,993. CONPRO 1/34 C] �j` 4 r� � ) G � � k C) � I--� � � � m rS x r n � �� � . ,� �' � � ----�_.__�._._ _ . ___- ___.. . _.-- - .f __ . . ., � i ; ..__ .__ _ ____ .. ... _ __. ; � i � . . . - .... .. �..'. ,..... _ __ _..�: � -- O H H � z � O z � � H C7 [=7 O dro �3 � �c � � rn rot��� c � cro � �0 'Z7 R7 'tl r�'0 n r•� ro � m m c � m � m n m cnN��n rt� rt� ww w rt H � r•� ww O O N (D � � x n o° w n sL o am rt m n m �o m m n � a x N � � r N ta �J f� �A