Loading...
HomeMy WebLinkAboutAECOM - 13-01A=GOM July 7, 2015 Mr. James Rabe City of Oshkosh 215 Church Avenue Oshkosh, Wisconsin 54903-113� AECOM 920.235.0270 tel 558 NoRh Main Sheet 920235.0321 fax �shkosh, Wisconsin 549�1 ftECE[VED JUL -7 2015 DEPT OF PUL3LIC WORKS OSHKOSH, WISCONSLbi Subject: Proposal for Post Construction Structural Evaluation of the Subterranean Storm Water Detention Structure Associated with the 2013 Constructio� of the City Contract 13-01 City Hall Parking Lot, Oshkosh, Wisconsin AECOM Proposal No. OPP-384747 Dear Mr. Rabe, AECOM is pleased to submit this proposal to conduct the final post construction structural evaluation of the sub-terrain storm water detention structure constructed as part of the City Hall Parking Lot Construction Project, City Contract 13-01. The proposed services represent the warranty inspection of the interior of the detention basin prior to completion of the Contractors warranty period on October 22, 2015. The purpose ot the eva{uation is to identify potential observable deterioration of the interior of the structure so as to have corrective action completed by the Contractor prior to conclusion of the warranty period. The following discusses the scope of services to be completed, schedule, information/assistance required from client, and compensation. Scope of Work Services to be provided for the proposed project are as follows: • Task A— Review the 2013 Post Construction Tank Evaluation Memorandum completed by the Project Structural Engineer, dated August 27, 2013 and update the confined space entry Safety Plan and Task Hazard Analysis. • Task B— Complete the confined space entry into the tank by an AECOM Structural E�gineer to review the existing conditions and record changes in conditions previously observed. Record measurements of existing crack monitoring gauges and compare to data obtained '+n 2013. • Task C— Prepare a 2015 Post Construction Tank Evaluation Memorandum documenting conditions observed, comparison of 2013 to 2015 crack monitoring gauge data, and summarize recommendations for corrective actions or additional investigative measures, if needed. OPP-384747 Post ConsVUCtion Structural EvaluationREV t.docx AECOM Schedule Confined Space Entry: July, 2015 Final Report: 2 weeks following site work Proiect Fees The following summarizes our estimate of fees to complete the scope of services described above. Task A: Preparation / Review 2013 Memorandum / Safety Plan Update $1,500 Task B: Confined Space Entry (Structural Engineer) / Tank Evaluation $3,000 Tack C: Report/ 2015 Project Memorandum Terms and Conditions $1,500 TOTAL $6,000 Services described in this proposal will be performed on a time-and-expense/unit-cost basis. The project services will be pertormed in accordance with the 2015 Negotiated Fee Schedule and the April 2009 Negotiated Terms and Conditions between AECOM and the City of Oshkosh, which are expressly incorporated into, and are an integral part of, our contract for professional services. Please indicate your acceptance of this proposal by having an authorized individual of the City execute the attached Authorization Form and return it to our Oshkosh office. If you have any questions regarding the proposed scope of services and corresponding costs, please contact us at your convenience. We appreciate the opportunity to provide engineering services to the City of Oshkosh. If you have any questions regarding the proposed project approach or corresponding costs, please contact us at your convenience. Sincerely yours, `_ aul F. Timm Account Manager Attachments: Authorization Form �/ � � Patrick Clifford, P.E����� Associate Vice President � KiPROPOSAL\Ciry of Oshkosh\OPP384747 Post Construction Stmc[ural Evaluation\OPP-384747 Post Conslruc[ion SlmcWral EvaluationREVl.dacx — A=GOM Authorization July 7, 2015 AECOM 920.235.0270 tel 558 North Main Street 920.235.0321 fax Oshkosh, Wisconsin 54901 I hereby authorize AECOM to proceed with the scope of work for the Post Construction Structural Evaluation of the Subterranean Storm Water Detention Structure Associated with the 2013 Construction of the Ciry Contract 13-01 City Hall Parking Lot, Oshkosh, Wisconsin, as described in AECOM's Proposal No. OPP-384747 dated July 7, 2015, with a budget authorization of $6,000 under the general terms and conditions specified in the proposal. .,���. I��-�� Signature Mark A Rohloff Print Name City Manager Title/Organization � �a- Signature Pamela R. i Print Name Lvnn A: Lorenson Print Name City Attorney Title/Organization ��G ��r�r� Signature Trena Larson Print Name Director of Finance Title/Organization -���(I�UI� Date � ��— '� I �( �� � S Date �— %����,8 /S Dat��— �I�I 15 Date K1PROPOSAL\Ciry of Oshkosh\OPP-384747_Post Construction Stmc[ural Evaluation\OPP384747_POSI Construclion SVUCWraI EvaluatlonREVl.docz AECOM I agree to accept invoices from AECOM via e-mail and not postal mail: ❑ Yes Signature: E-mail address: Recipient Mr/Ms: Return to: Name: Paul Tim 558 North Main Street Address: Oshkosh, Wisconsin 54901 Fax: 920.235.0321 Phone: 920.236.6724 Email paul.timmCa�aecom.com KiPROPOSAL\City of Oshkosh10PP384747_POSt Construction 3tmcturel Evaluation\OPP-384747_POSt Conslmction SlmcWrel EvalualionREVl.docx 4