HomeMy WebLinkAbout33153 / 84-05ADecember 27, 1984 �15A RESOLUTION
(CARRIED LOST LAID OVER WITHDRAWN )
PURPOSE: CHANGE ORDER N0. G-1 TO CONVENTION CENTER CONSTRUCTION CONTRACT
INITIATED BY: CITY ADMINISTRATION
BE IT RESOLVED by the Common Council of the City of Oshkosh that the
following Change Order Co P. G. MIRoN GONSTRUGTION CO., ING. for general con-
struction of the convention center in the Oshkosh Centre Project, is hereby
approved:
CHANGE ORDER N0. G-1
P. G. MIRON CONSTRUCTION CO., INC.
806 Valley Road
Menasha, WI 54952
Amount deducted: $535,571.00
PURPOSE: See attached Change Order
BE IT FURTHER RESOLVED by the Common Council of the City of Oshkosh
that the aforementioned Change Order is hereby approved; a copy of which is
attached to this resolution.
I SUBMITTED BY
APPROVED ����V
- 8 -
1.
2.
3.
CWANGE Distribution [o:
ORDER OWNER ❑
ARCNITECT ❑
AlA DOCUMENT G701 CONTRACTOR ❑
FIELD ❑
OTHER ❑
PROIECT: Oshkosh Centre
(name, address) Oshkosh, Wisconsin
RESOLUTION # 5A
1 of 3
CHANGE ORDER NUMBER: G-1
INITIATION pATE: December 27, 1984
TO (Contracror):
� � ARCWTECT'S PRO)ECT NO: 1383
P.G. Miron Construction Co., Inc. CONTRACT fOR: General Construction
806 Valley Road Work - Entire Project
, Menasha, Wisconsin 54952 �
L CONTRACT DATE: Deceiwer 20, �1984
You are directed to make the foilowing changes in this Contract:
' DEDUCTIONS
Delete wear-resistant finish on sidewaiic.
Omit southwest planter wall.
Omit all exterior benches.
4. Omit concrete paver blocks on exterior and replace with concrete walks
5. Delete all tree grates and steel guards at planters in parking area.
6. Omit special coating on exposed concrete slabs in convention hall.
7.
8.
9.
10.
11.
12.
13.
Change elevator cab design to manufacturer's standard design.
Fabric banners in concourse to be deleted. Change ceiling tile to
5/8" in lieu of 3/4", change Alcan ceiling to manufacturer's standard
colox, as selected.
Change wall finish in toilet rooms to paint or vinyl fabric in lieu
of ceramic tile.
Omit ceramic wall tile in kitchen, paint wall with epouy paint.
Omit two display cases on west wall of concourse, one on west wall
of Room 118, and delete display case in lobby.
Change custom chai.r rail to standard oak trim as oer Azchitect's
detail.
Delete all folding partitions from contract.
14. Delete painting in all mechanical rooms and unoccupied spaces.
15. Change toilet partitions to steel, baked enamel in lieu of fiber
resin plastic.
16
17
18
Reduce sound insulation in walls to 2" instead of 3".
Omit drywall, metal studs and insUlation on areas where exterior
insulated metal wall panels occur.
Change all ceramic floors and quarry tile floors to the'thin set
method. Substitute manufacturer of quarry tile floors and use stan-
dard cement grout in kitchen.
A{A DO�UMENT G705 • CN�NGE URDER • �PRLL 1978 fDIT10N • A1A� ' � 1978
THE AMERIC�N INSTITUTE O( �RCHITECTS, 17l5 NE�� YO�K AVE., ti,1\C, \1'ASHIN(.',p�, D.C. ?�704
- ua -
$ 3,500.00
4,694.00
3,304.00
3,084.00
1,360.00
8,311.00
1,365.00
8,576.00
1,260.00
2,680.00
1,4�Q.�0
1,020.00
174,849.CC
5,670.00
3,200.00
2,864.00
1,756.00 —
6,235,00
G701 — 1978
CHANGE Distribution to:
ORDER OWNER.. ❑
ARCHITECT ❑
AIA DOCUMEN7 G707 CONTRACTOR ❑
FIEID ❑
OTHER ❑
PROIER: Oshkosh Centre
(name, addressl Oshkosh, Wisconsin
RESOLUTION # 5A
2 of 3
CHANGE ORDER NUMBER: G-1
INITIATION DATE: December 2Y, 1989
TO (Contractor):
�— ARCHITECT'S PRO)ECT NO: 1383
� P.G. Miron Construction Co., =n� CONTRAC7 FQR: General Construction
806 Valley Road Work - Entire Project
Menasha, Wisconsin 54952
�
� CONTRACT DATE: December 2, 1984
You are directed ro make the follo«•ing changes in thi; Contract:
19. Change roof system to Carlisle "Design B" in lieu of "Design C" and
use patio block as ballast on skywalk rooi inscead of stone.
Insulation value to remain as specified.
20.
21.
22.
23.
Delete flag poles.
Delete hardware allowance £zom contract. City of Oshkosh to purchase
all hardware and supply to Contractor.
Delete brick allowance from contract. Owner will purchase directly
from supplier and provide to Contractor on site.
Change aluminum window system on skywalk to 1-3/4" x 4-3/4" thermo-
break system in lieu of 1600 Series detailed, and eliminate 9" high
cross bar in all aluminum entrance doors.
24. Heating Changes:
A. 1WO chillers will'remain as originally designed.
S. Chilled water stand-by pumps are to be omitted.
C. 'hao boilers will remain.
D. Ceiling diffusers will be changed to Carnes, or approved
equal in all areas, except the entry lobby.
E. Hot water stand-by pump will be deleted.
F. Delete all automatic stand-by pump operation.
G. Delete the temperature indicators on outside air, make-up air
and return air ducts.
H. Combine contzol panels ioz air nandlir.g ur.its irto one par.=1_
I. Substitute 1/2" liner for transfer ductwork in lieu of 1",
and change spiral ductwork to single wall in lieu of double
wall material.
25. Electrical Changes:
A. Delete all "OF" fixtures and change "L" fixtures to incandes-
cent fixtures.
B. Delete six of the ten convention center distribution centers
originally specified.
C. Change rigid steel conduit to thin wall conduit and.use PVC
conduit in concrete slab and underground. Change wrench type
fittings to 5et screw type.
AIA pONMENT G701 • CHnNGI URDER � APwIL 1978 EDITION • A�A� � ���N
THE AMERICAN INSTITUTE OF ARCHITEC7S, 17J5 KE1V YOUK AVE., ti.\\'., N7�SH�N(:T(��'D.C. 2P"NY�
- tSb -
8,000.00
2,415.00
79,000.00
32,850.00
6,900.00
43,550.00
10,650.00
5,520.00
5,300.00
G701 — 1978
CMANGE Distribution to:
ORDER OWNER ❑
ARCNITECT ❑
AIA DOCUMENT G707 CONTRACTOR ❑
FIELD ❑
OTHER ❑
PROIECT: Oshkosh Centre
(name, address) , Oshkosh, Wisconsin
TO (Contractor):
�
P.G. Miron Construction Co
806 Valley Road
�Menasha, Wisconsin 54952
RESOLUTION # 5A
3 of 3
CHANGE ORDER NUMBER: G-1
INITIATION DATE: December 27, 1984
—7 ARCHI7ECT'S PROJECT NO: 1383
, Incl CONTRACT FOR: General Construction
Work - Entire Ptoject
� CONTRACT DATE
You are directed to make the following changes in this Contract:
D. Delete all "OC" fixtures.
E. Direct credit from the light fixture suoplier and aoproved
changes in the sound system.
26. Delete all work for parking lot at'north side of Ceape Avenue.
December 20, 1984
ADDITION
27. A1lowance for electrical sezvice work for Wisconsin Public Service
as per specifications. Cost to be certified by Contractor and a
change order issued to reflect the difference.
Total Contract Additions and Deductions
1,500.00
17,775.00
96,983.00
10,000.00
-$535,571.00
(See attached letter of clarification on each of the above changes listed)
Not valid untit signed by both ihe O�vner and Architect.
Signature of the ConVactor indicates his agreemen! herewith, induding any adjustment in the Coniract Sum or Contract Time.
The original (Contract Sum) ECriza+ar�teerl-�tila�+++rt�rEesd was .................... ....... $ 3� 675, 000.00 .
Net change by previously authorized Change Orders ...... 5 °-
............................. .
The (Contract Sum) {Gvarm+teeeiMaximwnf-osH prior to this Change Order was .......... $ 3,675, 000.00 .
The (Contract Sum)�6nararttee��.4.rmirnnrr��st) will be{+r+erease�}(decreased) (nrtc�Fran�edl
by this Change Order .....................:................................... $ 535,571.00
The new (Contract Sum) (6varartteed�i�kaximtnnEvstl induding this Change Order will be ... $ 3,139, 429.00 ,
The Contract Time will 6e (inerea�ed}{�rea3ec}) (unchanged) by ( 0 ) Days.
The Date of Substantial Completion as of the date of this Change Order therefore is February , 19II6 .
Joint Venture-Reinke, Hansche, Authorized:
Last, Inc./Py-Vavra Architects P.G.�_ Miron Construction Co. City of Oshkosh
ARCHITECT CONTRACTOR ObVNER
805 N. Main Street 806 Valle Road 215 Church Avenue
Address � � Address Address
Oshk6sh,�WI 54901i Menas „ WI 5495? � Oshkosh, WI 54901
r1� n/� � . '
BY
DATE
BY
BY
!�ATE �� -� 4' '�J T � DATE
AIA DOCUMFNT G:Oi • CHANGE UBOER ' AFHIL 1978 EDITION • ��A� • � 1978
THE AMERICAN INSTIIUTE OF ARCHITECTS,'1:35 NEN� 1'OBK AVL, h.\4'., N'ASHINGTO�, D.C. ?OOOG G%O� — 19%E
- gC -
architects
REINKE • HANSCHE • LAST • INC •
BOS NOFTH MAIN STFEET • OSHKOSM, WISCONSIN 5�90f • TELEPHONE �11 291E950
P.G. Miron ConstYUCtion Co., Inc.
806 Valley Road
Menasha, Wisconsin 54952
Gentlemen:
RESOLUTION # 5A
.YRA ARCHITEC7S EhGINEERSINC
December 27, 1984
RE: OSHKOSH CENTRE
PROJECT NO. 1383
Following is a detailed explanation ior each of the items listed
in the Change Order.
Item
Detailed Description
1. Specifications and drawings indicated wear-resistant finish on
certain exterior sidewalk areas. Finish material shall be de-
leted and concrete shall be finished with an approved broom
finish. Item deleted is in 5ection 0330, Part 2, 2.01, Paragraph
L.
2. Drawings indicate a low planter wall on the southwest corner
of the building. This wall runs £rom door D-25 to D-27. This
wall shall be eliminated.
3. Exterior benches, 5ection 0245, Part. 2.01; site furnishings
shall be deleted from contract.
4. Exterior paver blocks, as indicated on drawings on exterior walks
and patios, shall be deleted and replaced with concrete walks
as detailed.
5. Delete all tree grates and tree guards as specified in Section
0245, Part 2.04.
6. Delete special coatings, Section 0980, where indicated as "NOte
1" under floor coverings on Ttoom Finish Schedule, Sheet 12 of
drawings.
7. Elevator cab designs shall be changed to manufacturer's stan-
dard, Otis LRU 3011 in accordance with letter from Otis Eleva-
tor Company, dated pecember 15, 1983.
- 8d -
RESOLUTION # 5A
P.G. Miron Construction Co., inc.
December 27, 1984
Page 2
8. Fabric banners in concourse to be deleted and change ceiling
suspension system. All ceiling tile specified as 3/4" shall
be changed to 5/8" thickness. Alcan ceiling system to be
chanqed to manufacturer's standard color.
Note: All items in this paragraph will be reviewed prior to
£inal approval of shop drawings.
9. Toilet Rooms 117 and 118: Delete ceramic wa11 tile and change
to paint or vinyl fabric.
10. Delete ceramic tile wainscoat in Rooms 7.62, 166, 167, 167, and
finish wall with epoxy paint.
11. Delete display cases on west walls of Rooms 115 and 105 (3�
and display case on south wall of Room 123. Walls where cases
are omitted shall be finished as per adjacent surfaces.
12. Chanqe custom chair rail to standard oak trim as per detail
to be furnished by architect and approved by millwork subcon-
tractor.
13. Specification Section 1062 shall be omitted from the General
Contract. Owner will purchase directly. Owner will provide
contractor with shop drawings for punching of anchor bolt loca-
tions.
14. Delete painting of the following rooms: 137, 139, 141, 148,
149, Stair 150, 159, 164, 170, 171, 172, 173, 174, 205, 206
and 207.
15. Change toilet partitions in 12ooms 117 and 118 to standard type
partitions as specified in Section 1000, Part 2.01, B.
16. In all areas where sound insulation in walls is detailed as
3", it shall be changed to 2" material as specified for 3"
insulation.
17. On Sheet No. 8, delete all drywall on inside face of all ex-
terior walls in unfinished spaces.
1S. Change all ceramic and quarry tile floors to thin-set method
in lieu of mud-set method. Grout shall be standard cement
grout in lieu of type specified in Section 0930. Samples of
quarry tile shall be submitted for approval prior to ordering.
This change omits floor depressions for mud-set system. How-
ever, floors under freezers and coolers will be constructed
as per detail. Topping of insulation shall be concrete ready
for quarry tile installaion.
- fie -
RESOLUTION # 5A
P.G. Miron Construction Co., Inc.
December 27, 1984
Paqe 3
19. Roof system shall be changed to Carlsile Design 'B' with patio
block ballast on skywalk roof and as per E.D. Chase Company
letter of November 15, 1984.
20. Delete flag poles, Section 1000, Part 2.05.
21. Delete all hardware, Section 0870. Hardware will be furnished
to General Contractor for installation. Contractor shall receive,
store and tag as required.
22. Hrick wi11 be purchased by the Owner from Contractor's count.
Brick wili be delivered to job site. Contractor will be re-
sponsible for unloading if this is a requirement of brick sup-
plier.
23. Change aluminum window system on skywalk to 1600 Series and
eliminate 9" high crossbar in aluminum entrance. This change
will be reviewed prior to preparation of shop drawings with
window subcontractor.
24. & 25. Separate letter will be prepared and forwarded for HVAC
and electrical work.
26. Parking lot work, north of Ceape Avenue, is deleted from con-
tract.
27. Self-exolanatory.
I trust these items agree with all of our discussions. If there
are auestions, please feel free to contact me.
•�...
Very truly yours, ,
�� y�� � �G r33i�s �,c_ �
RONALD D. HANSCHE
- t�f -
w�- .
� d �� �� �
�• � a o m � m
cr o � �3 � m
`C (D r[j H cf � •
� � m°z � � �
N � m d..
� �s .. c� o v�
x C� N a� a 9
` � ar mm
`C o cr �
N 'U y
�' � �3 G G�
� 0 1
N ct F-�
r v N• � �
o c�
� � ►.33
o m (J�
� � � '�.
cr N
.i F'•
W O
C� �
ci