HomeMy WebLinkAbout33204 / 85-14February 21, 1985
(CARRIED LOST
�I14 RESOLUTION
LAID OVER WITHDRAWN )
PURPOSE: APPROVE AGREEMENT FOR CONSULTANT SERVICES IN
CONNECTION WITH THE SEWERAGE SYSTEM
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
BE IT RESOLVED by the Common Council of the City of Oshkosh that the
proper City officials are hereby authorized and directed to enter into the
attached agreement (Supplemental Task Order No. 7) with Howard Needles Tammen &
Bergendoff of Milwaukee, Wisconsin, for consultant services in connection with
improvements to the sewerage system, in an amount not to exceed $351,538, unless
agreed to in writing.
BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated
from Account tdumber 349-145 - Sanitary Sewer Construction in Progress.
SUBMITTED Isi'
�PPROVED
���
,t .
SUPPLEMENTAL TASK ORDER N0. 7
TO T[-IE AGRET�..',�IENT DATED 6/20/79
BETWEEN 'I'�iE CITY OF OSHKOSH
IV THE STATE OF WISCONSIN
AND
HOWARD NEEDLES TAM:�F.N & BERGENDOE'F
FOR CONSULTANT SERVICES IN COVNECTION
WITH IMPROVF.MEV?5 TO THE SFWERAGE SYSTE;1
- 18a -
Resolution ��14
Resolution ��14
�-'I.0 Purpose
The purpose of this Supplemental Task Order is to est.sblish scopa,
schedule and payment provisions for engineering services during
execution of the s=werage system facilities construction contrscts
as moro specifically described herein.
7-1.1 Co�sultant shall not co�mence work on azy task defined by this
Supplemental Tssk Order agreement until autnorize3 by the City.
7-1.2 Agrzemsnt by the City ta the provisions of this Supplementsl Task
Order does not obligat° the City to the Consultant for funding or
authorizstion of any portion o£ this work until such time that the
City authorizes the work defined herein.
7-1.3 The Consultant sha11 not retain tne s°rvices o£ any subconsultant
for assistance with the tssk_s described herein vrithout authorization
by th= City of Oshkosh.
7-2.0 Scope
The scope of the work to be�rformed under the Supplemental Task
Order shall be in accordance with th� gzneral provisions described
in the Agreement betw�en the City of Oshkosh �nd Howard Needles
Tsmmen & Eergendoff, dated June 20, 1979• Thes^_ services are fur-
ther defined i� Articles 2.1.¢ Construction Phase, 3nd 2.2 Addi-
tional Services, of the Agre�ment, and mor= specifically described
as follows.
7-2.1 The CONSULTANT will provide the following engineering services under
this Supplemental Task Order:
7-2.1.1 PROJECT MANAGEMENT - Consultant shsll provide overall man-
agem=nt servic�s to assist the City with tha administration
of project funding programs, administration o£ the project
Phsse IA ronstruction Contracts 85-01, 85-02, 85-�3 3n3
85-0�, and oversll mansgement o£ the below listad t3sks.
7-2.�.2 RESIDEIVT ENGINEERING SERVICES - Provide residant en�inser-
ing serv;ces d,,.•.;_,•� <ve�„±_o,. ef th� ..,,�:; _�.clu3_d �__ Cc,.-
struction Contrscts 85-01 Sewer Intercentor, 85-02�Forca
Msin, 85-03 Broad Street Pump Ststion, and 85-07 South Ksin
Street Pump Station.
7-2.1.3 SHOP DRAWING SUBMITTAL RPVIEW - Frovi3e reviaw oi shop
drawir�gs and contract submittals for conformance with the
project plans snd spacifications.
7-2.1.4 CONSTRUCTION STAKEOUT - Provida survey controi and initial
stskeout for each o£ the contracts, assist in verifying
grades and locations during progress of the construction,
assist in finsl inspactio❑ daterminations of horizontal and
:�
Resolution �k 14
v°rtical alignment of the fscilities, and det�rmine loca-
tion ties from new manhol� structures to existing property
1ZOL15 .
7-2.1.5 OPERATION AND MAINTENANCE MANUAL - Pr2par= Operations and
Maintenance Manu3ls in accor3ance with the approved
Preliminary Plan of Operation and the requirements of the
Depsrtment of Natural Resources £or Contracts 85-01, 85-02,
85-03, and 35-07.
7-2.1.6 SOILS TESTING - Provide testing of m3terials offered by the
Contractor for compliance with pro,ject backfill material
specifications, and fi=1d tssting of Contr3ctor's backfill
compaction efforts to verify complianc° with project
specifications.
7-2.1.7 RECORD DRAWIVGS - Prepara rocord drawings, based on infor-
mation to be furnished by th� constructing Contractor for
Contracts 85-01, 85-02, 85-03, and 85-0%. The record
drawin�s ,�ill be altered versions of the original project
design drawings. Also, the Consultant will provi3= the
City with the necessary record dats to compl�tz manhol>
dats record cards.
7-3.0 Schedule
The work imder this Supplemental Task Order shall commence upon
receipt by the Consultant of an executed copy of the Suppl=�ental
Task Order, an3 authoria3tion to procee3 from the City to the Con-
sultant. Th= field s2rvices to be provided herein will conclu3e
upon final acceptance of the work included in Construction Contracts
85-01, 85-02, 85-03, and 85-07. The submittal schedule of the Op2r-
stions and M,sintenance Manuals to th= Depsrtment of Nacursl Re-
sources for their revi°w snd approval will be in accordance with
fuading agency roquirements. Preparation of Record Draxings will be
completed in s tim�ly manner after final acceptanc= of the
construction o£ work ir.cluded in Contracts E35-01, 85-02, 85-03, and
65-07.
7-4.0 Minority and Small Busin=ss Enterprises (MSBE)
Minority or Small Business Enterprises will be retained by the
Consultsnt to assist in providing the services included in thzs
Supplemental Task Or3=r in accordance with the City of Oshkosh's
st3t=_d guideline for minority or s�nall business enterpris= psrtici-
pation o£ 10o for work funded wholly or in part by th� Wisconsin
Fund grant program. However, no Minority or Sm�ll Business Etiter-
prisa will be retained by the Consultant without th� authorization
of the City of Oshkosh.
7-5.0 Payment
7-5.1 Payment for the work defined under t:iis Supplementsl Task Order
shall be on the basis of a cost plus fixs3 fea in accordance with
- 18c -
�
Resolution �� 14
ths g=neral provisions described in Article 8.1.9 of the Consultant
Services Agreement between the City and Consultant dsted Jun= 20,
1979. The total ch.srges for this Supplemental Task Order will not
exc=ed $351,533, unless agreed to in writing.
7-5.2 The estimated direct labor costs, indirect costs, other direct
costs, and profit hill be itemized in the Supplemental Task Order
COST OR PRICE SUMMARY FORf4AT FOR SUBAGREE[4BNTS UNDER WISCONSIN FUND
GRANTS form, and on the attachments incidentsl to those forms.
IN WITNESS Wiir,REOF, the psrties have caused this Supplemental Task Order
No. � to be execute3 the year and the day below written by th�ir proper
officers and representativ=s.
In Presance Of: CITY OF OSHKOSH, WISCONSIN, A Municipal Corporation
HOWARD NEEDLES TAMMEN & BERGENDOFF
By
Harvey ?C. Hammond, Associat�
Approved as to form:
By
City Attornsy
HVTB No. 01Q0 (CONPRO-1�26)
:�
Dats
D3 te
Dats
Date
H �� LTJ
� � a
n � y
r �- z
tn �a k
x � �
����
� �
� �
�
T�
\
��
�o
r� z
d..
�
ko
C�1� H
�
���
m cro
w o c
wmro
m �n
cn r�w
� � n
N fD
fD O �
� � N
m rt
n
rt rn
r� o
o n
�
E o
w�
��
r
rr rr
�w
� �
rt
z
m
�
�
r
�