Loading...
HomeMy WebLinkAbout33282 / 85-121 . � . ,.� April 4, 1985 (CARRIED PURPOSE: INITIATED BY: ��12 RESOLUTION LOST LAID OVER WITHDRAWN ) APPROVE CONTRACT FOR SERVICES/OSHKOSH CONFERENCE CENTER CITY ADMINISTRATION BE IT RESOLVED by the Common Council of the City of Oshkosh that the attached Contract for Services Relating to Procurement and Installation Supervision between the City of Oshkosh and CSA, Inc., a Minnesota corporation as purchasing agent for the Oshkosh Conference Center with regard to furniture, fixtures and equipment, and operating supplies and equipment. BE IT FURTHER RESOLVED that money for this purpose is appropriated from Account No. 331-106 - Centre Redevelopment - Equipment. SUBMIT'P�D BY l�PPROVED - 13 - � � CONTRACT FOR SERVICES RELATING TO PROCURE"IENT AND INSTALLATION SliPERV2SI0N RESOLUTION # 12 This Agreement is made as of this 28th day of March 19 g5 , by and between City of Oshkosh, Wisconsin ' (the "Owner"), and CSA, Inc., a Dlinnesota corperation t e Purchasing Agent"). P.RTiCLE I SUBJECT bSATTER, GUARF�NTEED bIAXIMUM ?RICE, OPEN2NG DATE, 5CHEDULE 1.1 THE PROJECT. The "Gshkosh Confereace Center in Oshkosh, Wisconsin. The construction of the Hotel and approximately guest rooms modules with attendant amenities shall sometimes hereinafter be called the "Project". The project scope is defined in the attached Statement of Probable Cost, dated March 27, 1985. 1.2 FURNITURE, FIXTURES AND EQUIPMENT. "Furniture, Fixtures and Equipment", FF&E' , s all rerer to t e furniture, decorative and specialty lighting fixtures, kitchen equipment, laundry eauipment and other fixtures and equipment to be designed, purchased and installed in the Project pursuant to this Agreement and wnich will provide the quality intended by the Owner as provided for herein. 1.3 DESIGN MATERIALS. "Design Materials" shall refer to wallcoverings, millwork, paneling, paint, railings, carpeting, tile and other £loor coverinas, awnings, exterior and interior signs, and similar items and which will contribute to the provisions of a complete Project o£ quality ir.tended by the Owner as provided for herein. 1.4 OPERATING SUPPLIES AND EQUIPMENT. "Operating Supplies and Equipment" shall refer to chinaware, glassware, linens, silverware, uniforms, smallwares, of=ice supplies and equipment and similar items which will cont::ibute to the provisions of a complete Project cf the quality intended by the Owner as provided for herein. _ 1.5 INTERIOR DESIGNER. The "Interior Designer" for the Project is CSA, Inc. 1_.�; ARCHITECT. The Architect for the Project is PY-VAVRA Architects - 13a - r � RESOLUTION # 12 1.7 GENERAL CONTRACTOR. The "General Contractor" for the Project is N/A 1.8 PROJECTED PROJECT OPENING DATE.Owner projects the opening date of the Hotel to be Februarv 14 ,19 85 , for purposes of establishing the Preliminary Budget pursuant to Section 3.2 hereof (the "Projected Openinq Date"). 1.9 PROJECT SCHEDULE. "Project Schedule" means the schedule for completion o£ t e pro�ect from desiqn through construction prepared by the Owner (or Owner's selected representative) and mutually agreed to by the Architect, General Contractor, Interior Designer, Purchasing Agent and Owner. Any revisions or changes to said schedule shall require mutual agreement by all parties. ARTICLE II THE WORK 2.1 Owner engages Purchasing Agent to purchase and supervise the installation of the FF&E and the Operating Supplies and Equip- ment and the items of design materials to be furnished and/or in- stalled in accordance with the provisions o£ this Agreement and that attached Exhibit A. 2.2 The purchase and supervision of installation described in this Article II shall sometimes hereinafter be referred to as the "work". 2.3 The attached Exhibit A which is made part of this Agree- ment identifies the party responsible for the purchasing and instal- lation for each major category of the Work. 2.4 COOPERATION WITH OTHE_°. PROFES5IONALS. The Purchasing Agent shall, as part o th, �r7or}:, collaborate and cooperate with the Owner, the Architect, tne Interior Deisgner, the General Con- tractor, the Owner's construction mortgage lender, and any profes- sionals engaged by any o£ them during all phases oi the design and construction of the Project. The Purchasing Agent shall not be responsible £or the acts or omissions o£ the Architect, Znterior Designer, General Contractor or other professional engaged by the Owner. ARTICLE III COST ESTIiL�TES AND BUDGETS 3.1 PRELIMINARY COST ESTIMATE. Owner shall deliver to Purchasing Agent preliminary design plans and specifications and budget outlines and, based on said information and the information set forth in Exhibit A, Purchasing Agent shall prepare a preliminary cost estimate - 13b - RESOLUTION # 12 for purchasinq and installing the FF&E, the Operating Supplies and Design Materials to be purchased and installed by Purchasing Agent pursuant to Exhibit A for the Project (hereinafter referred to as the "Preliminary Cost Estimate"). The Preliminary Cost Estimate shall include, without limitation, all fees to be paid to the Purchasing Agent, an itemized listing of the estimated cost of the FF&E, Operating Supplies and Equipment and Design Materials, the estimated cost for installation, and any taxes and freight charges incurred in connec- tion with the purchase and installation of the above. Upon comple- tion of the Preliminary Cost Estimate, Purchasing Agent shall deliver said estimate to Owner. 3.2 FINAL BUDGET. Following the receipt by Purchasing Agent of (i) written approval by Owner of the Preliminary Cost Estimate and (ii) final interior design plans and specifications, Purchasing Agent shall submit to Owner a final budget (hereinafter referred to as the "Final Budget"). The Final Budget shall itemize the cost, as of the date of the Final Budget, of the items to be purchased by Purchasing Agent pursuant to the terms of this Agreement and in the form of the Preliminary Cost Estimate. ARTICLE IV PROCUREMENT AND INSTALLATION PHASE 4.1 PROCUREMENT AND INSTALLATION SUPERVISION. (a) The Procurement and Installation Phase will continue upon Owner's approval of the Final Budget. The Purchasing Agent will accept bids, release purchase orders, and award installation contracts in a timely manner in accord with the Project Schedule. The Work shall terminate upon completion of the installation o£ the FF&E and the Design Materials and the delivery and installation of the Operating Supplies and Equipment pursuant to this Agreement, all such installations and deliveries to have been finally approved by Owner as conforming with the Procurement Documents. (b) The term "Supplier" as used herein shall mean any person or organization, other than the Purchasing Agent, awarded a contract or contracts or issued a purchase order or purchase orders in connection with the Procurement and Installation Phase described in this Section as if singular in number and neuter in gender. The term "Supplier" shall also refer to the authorized representative of the Supplier. The Purchasing Agent may bid on Procurement Documents or act as a Supplier with the prior written consent of Owner. (c) Purchasing Agent shall purchase the FF&E, Operatina Supplies and Design Materials to be purchased pursuant to the attached Exhibit A as agent for Owner's account, using a form of purchase order in Exhibit B attached hereto and made a part hereof by reference (hereinafter referred to in the singular as "Purchase 3 -13c- r RESOLUTION # 12 Order" and in the plural as "Purchase Orders"). All Purchase Orders shall be placed in accordance with the bidding procedure hereinafter provided for in subparagraph (d) and all Purchase Orders shall require the prior written approval of Owner. (d) Purchasing Agent shall seek bids from vendors of FF&E, Operating Supplies and Design Materials to be purchased by Purchasing Agent hereunder pursuant to the procedures specified in this subparagraph (d}. In the event of any vendor o£ FF&E or Design Materials does not install same as part of the price of the FF&E or Design Materials, the contract for installation of the FF&E or Design Materials shall be awarded in accordance with the procedures specified in this subparagraph (d). Said bidding procedures are as follows: (1) Purchasing Agent shall prepare all necessary bid documents and a list of at least three i3) bidders, unless such requirement'for three (3) bidders shall be waived in writing by Owner. Said list of bidders shall be subject to Owner's approval, which approval shall not be unreasonably withheld. (2) Owner shall notify Purchasing Agent in writing of any objection to the bidders selected by Purchasing Agent within five (S) days following receipt of said list by Owner for approval. In the event no objection is received within the foregoing period, Owner shall be deemed to have approved the bidders so selected. (3) The instructions to each bidder shall provide for return of all bids to Purchasing Agent. Purchasing Agent shall make recommendations to Owner with respect to the award of all Pur- chase Orders and contracts for installation thereof and, after receipt o£ written approval by Owner, Purchasing Agent shall issue Purchase Orders and award contracts as agent for Owner. (4) Custom fabricated FF&E shall be purchased through competitive bidding in accordance with the procedures outlined herein. Fabricated, as said tezm is used herein, shall include manufactured furnishings. (5) In the event it is not possible to obtain com- �etitive bids or in the event Owner specifies a particular brand, manufacturer or vendor of FF&E, Purchasing Agent shall use its best effor*_s to obtain a guaranteed price for said FF&E, if any is avail- able. (e) The Purchasinq Agent shall advise and consult with the Owner, the Architect, the Interior Designer and General Contra- tor dur=.ng the Procurement and Installation Phase and shall coordi- nate its activities during the Procurement and Installation Phase to assure that the FF&E and the Design Materials for which it is responsible are fabricated, installed and supplied so as to provide for a complete Hotel of quality intended by Owner as provided for 4 - 13d - �sor�v�rzaN # iz herein above and in accord with the speci£ications and designs approved by Owner and in accord with the Project Schedule. The Purchasing Agent cannot assume responsibility for delays caused by Strikes, Acts of God, �eneral Contractor, Owner, Architect, unusual delay in transportation, unavoidable casualities or inability to access the Hotel on its published FF&E installation schedule due to spaces not being available. The Owner shall be responsible for any additional costs caused by these delays such as demurrage, warehouse, storage or redelivery charges which are due to Owner's failure or failure of any aqent of Owner in con- forming to the Project Schedule. (f) The Purchasing Agent will obtain a lien waiver from any Supplier or sub-contractor having lien rights against the Hotel and upon receipt of the £inal payment pursuant to Sec- tion 6.1 (b) the Purchasing Agent will deliver a lien waiver to Owner. (g) The Purchasinq Agent shall deliver to Owner all warranties, guaranties, operating manuals, and similar documents or materials which are received by the Purchasing Agent in connec- tion with the purchase of Furniture, Fixtures and Equipment, Design Materials, and Operating Supplies and Equipment. Owner agrees that it is the responsibility of Owner to enforce Owner's rights under the provisions of such warranty and guarantees with respect to latent defects. (h) The Purchasing Agent shall schedule deliveries of the Furniture, Fixtures and Equipment, Design Materials, Operating Supplies and Equipment for coordinated installation of the Work consistent with the Project Schedule. (i) The Purchasing Agent agreea to supervise the receipt of tne Furniture, Fixtures and Equipment and Design Materials to be installed by and the Operating Supplies and Equipment to be provided by Purchasing Agent and otherwise on an "as needed" basis based on the Project Schedule, the Owner's Schedule and the FF&E Schedule. The fee for installation supervision by Purchasing Agent, shall be pa-_'t of the fee described in Parugraph 6.1 of this Agreement, but reimbursable expenses incurred in connection with the installation supervision shall be reimbursed pursuant to Paragraph 6.2 of this Agreement. All installation contracts shall be between Owner and installation contractor directly and Purchasing Agent sha11 assume no monetary ]_iability therfor. - 13e - 5 RESOLUTION # 12 , . (j) The Purchasing Agent shall at all reasonable times have access to the Work whenever it is in preparation or progress. (k) The Purchasing Agent will make inspections of the S4ork at the Hotel in accordance with a Schedule approved by Owner. During such inspections the Purchasing Agent shall familiarize itself with the progress and quality of the work and determine if the Work is proceeding in accordance with the Procurement Documents, purchase orders, and construction and installation contracts. The Purchasing Agent will not be responsible for the General Contractor's failur,e to carry out those portions of the work for which it is responsible. (1) Based on such inspections and on applications for payment to be submitted by Suppliers, and only after delivery and/ or installation by the Supplier of the Design Materials, Furniture, Furnishings and Equipment or Operating Supplies, as applicable, the Purchasing Agent sha11 determine the amount owing to the Supplier and sha11 approve payments to the Supplier to be made directly by the Owner. (m) The Purchasing Agent shall have authority at Owner's expense and with Owner's approval (i) to reject work which does not conform to the Procurement Documents and/or (ii) to require special inspection or testing of the Work or portions thereof, whenever the Purchasing Agent deems it advisable whether or not such Work be it then fabricated, installed, or completed to insure that the Work conforms to the Procurement Documents. 4.2 STORAGE SPACE. The Owner shall provide a suitable space on the site for the receipt, inspections and storage of the items purchased pursuant to this Agreement, which space shall be secured in a manner satisfactory to the Purchasing Agent and at the Owner's expense. Provisions for temporary ofPice facilities on site, all heat, light, water, electricty and sanitary facilities will be pro- vided by the Onwer to the Purchasing Agent d�ring the installation phase at Owner's expense. Owner will provide the required vertical transoortation and trash removal area as mutually agreed to in the rF&E Schedule. The Owner is responsible ior providing the Purchasing Agent with "broom clean" spaces to work in and is financially responsible for any damaged, lost or stolen materials properly received at the job site. 4.3 DELIVERY SCHEDULE. The Purchasing Agent shall, to the greatest extent feasi le, schedule delivery of FF&E and Design Materials supplied by the Purchasing Agent and Operating Supplies and Equipment in a manner consistent with the Project Schedule. If the Purchasing Agent receives aoprovals from the Owner in a timely fashion as provided herein, the Purchasing Agent hereby repre- sents and warrants that it will cause purchase orders to be placed in a timely manner so as not to delay the construction of or the opening o£ the Hotel, subject to matters beyond the control of the Purchasing Agent. -13f- � J c ARTICLE V PROJECT COST RESOLUTION # 12 5.1 PAYMENT OF PROJECT COSTS. Purchasing Agent shall forward all invoices and other requests for payment pertaining to approved Purchase Orders or any approved contracts for installation to Owner for payment and Owner shall make payment direct to such vendors or contractors within thirty (30) days after receipt by Owner of any such request for payment pertaining to approved Pur- chase Orders and installation contracts. Purchasing Agent assumes no monetary or other liability for payment of FF&E or installation thereof and Purchasing Agent shall not be liable £or any lost cash or trade discounts or accrued interest charges as a result of non- timely payment by Owner. In the event Owner fails to make payment to such vendors or other contractors when due, Purchasing Agent may upon fifteen (15) days written notice to Owner, direct that delivery of all FF&E or installation thereof be suspended or cancel all Purchase Orders or other contracts until such payment is made; such suspensions and cancellations by Purchasing Agent shall not be deemed or construed to be a breach by Purchasing Agent of this Agreement or any condition or covenant hereof an3 Purchasing Agent shall not be liable for any payment or damages resulting from any such suspensions or cancellation. 5.2 REPORTING OF HARD COST. The Purchasing Agent shall submit to t e Owner mont ly statements indicating an itemized summary of the status of purchase commitments released and payments made by the Owner. A sample of this monthly statement shall be submitted to the Owner with the Procurement Documents. A receiving manual shall be maintained at the project by the Purchasing Aaent indicating the receipt, condition and location of all materials delivered. This manual shall be open to audit by the Owner at all times. ARTICLE VI FEE PAYMENTS TO THE PURCHASING AGENT 6.1 Total Fee Pavments. (a) Ocaner will pay the Purchasing Agent (or cause the Purchasing Aaent to be paid) a fee in an amoi.:nt equal to So of the Purchase Order/Contract dollar total that the Purchasing Agent releases on behalf of the Owner. (b) [9ith the execution of the initial fee set forth below, (i), fee payments shall be made monthly in proportion to the services performed so that the compensation at the completion of each phase shall be equal to the total fee payments set forth below. The fee is estimated at $35,000.00 for billing purposes only. The fee will be adjusted to actual in (iv) below: 7 - 13g - .,./ . � (i) (ii) (iii) (iv) RESOI�IJTION # 12 Initial Fee upon execution of this Agreement by Owner (108) Cost Estimates and Budget (Article III) (30$) Procurement and Znstallation Phase (Article IV) (90�) $ 3,500.00 $ 10,500.00 $ 31,500.00 Fina1 Payment upon completion of the Work (100�) $ 35,000.00 6.2 REIMBURSABLE EXPENDITURES. Reimbursable Expenditures shall include the followang expenditures made by the Purchasing Agent, or the consultants of the Purchasing Agent in carrying out the Work; provided, however, that the aggregate amount of Reim- bursable Expenditures to be paid by the Owner hereunder for work below, shall not exceed $ 10,000.00 All such reim- bursable expenses shall be included in the Final Budget. (a) Travel expenses to and from the Hotel and associated out-of-pocket expenses ior any trips from t:inneapolis, Minnesota, to the site of the Hotel or to any other location outside the Minneapolis Metropolitan Area requested by Owner or required by the Purchasing Agent in performance of its contracted duties. (b) (c) Long distance calls and telegrams. Expense of reproduction, postage and handling of drawings and specifications. (d) I£ requested and if authorized in writing in advance by Owner, expense o£ overtime Work requirina higher than regular rates and expenses of renderings or models for Owner's use. (e) Reasonable legal expenses paid to outside counsel incurred by Purchasing Agent in rejecting and revoking acceptance of defective goods supplied by Suppliers. The Purchasing Agent shall submit to Owner monthly statement for such reimbursable expense with expense documentation attached. The Owr.er will reimburse the Purchasing Agent for such expense within 20 days of its receipt of each such monthly statement. - 13h - , ARTICLE VII THE OWNER'S RESPONSIBZLITIES RFSOLUTION # 12 7.1 ARCHITECTURAL AND INTERIOR DRAWINGS. All drawings, specifications, information, surveys and reports, pertaining to the Hotel shall be furnished at the Owner's expense, and the Purchasing Agent shall be entitled to rely upon the accuracy and completeness thereof. 7.2 PAYMENTS TO PURCHASING AGENT. In the event that the Owner fails,to make payment to the Purchasing Agent within a 20-day period from receipt o£ invoices and the Purchasing Agent is not in default under this Agreement, then such amounts due bear interest at the lesser rate of: (i) the Citibank prime rate plus two percent (2�) or (ii) the highest rate permitted by law under the provisions of this Agreement in the jurisdiction in which the Hotel is located. ARTICLE VIZI TERMINATION OF AGREEMENT 8.1 This Agreement may be terminated by either party upon iifteen (15) days' written notice should the other party fail sub- stantially to perform in accordance with the terms hereunder through no fault of the party initiating the termination, unless the other party cures such default within said fifteen (15) day period (or if such default cannot be cured within said fifteen (15) day period and thereafter with reasonable diligence and in good faith proceeds to remedy such default). Each party shall retain the right to sue £or damages from said default. 8.2 This Agreement may be terminated by either party at any time if the Project is abandoned. 8.3 A£ter fifteen (15) days written notice to the Owner, the Purchasing Agent may suspend the Work hereunder without liability to the Owner, if at any time Owner fails to make monthly payments required pursuant to Section 5.1, 6.1, and 6.2. 6.4 In the event of any termination under the provisions of this Agreement, the Purchasing Agent shall be paid as full compen- sation for all services the amount due for any completed phases and a pro rata amount due for the Work completed during any phase in whcih Purchasing Agent has completed some but not all of the L4ork for such pnase described in Section 6.1 .� - 13i - RFSOLUTION $ 12 ARTICLE IX PURCHASING AGENTS RECORDS 9.1 Records of the Purchasing Agent in connection with the Project shall be kept on the basis of generally accepted accounting principles and shall be available to Owner or Owner's authorized representative for review at the office of the Purchasing Agent at reasonable times during ordinary business hours. Owner shall be permitted to review work in progress on the Project at the Purchasing Agents's office at reasonable times during ordinary business hours. ARTICLE X INSURANCE 10.1 Purchasing Agent shall maintain, as evidenced by certifi- cates delivered to Owner prior to the commencement of its work hereunder, comprehensive general liability insurance with coverage of at least ONE MILLION AND NO/100 ($1,000,000.00) DOLLARS combined single limit. 10.2 Purchasing Agent shall require as part of the bid procure- ment and bid documents described in Paragraph 3.2 of this Agreement that (i) all vendor issued Purchase Orders pursuant to the terms of this Agreement comply with insurance requirements specified in the form Purchase Order in Exhibit B attached hereto and (ii) all other contractors awardad contracts pursuant to the terms of this AarPama,nt comply with insurance requirements and insurance documentation described in Exhibit C attached hereto and made a part hereof by reference. 10.3 INPEMNIFICATION. Owner sha11 indemnify and hold harmless Purchasing Agent, its agents and employees, from and against any and all claims, damages, losses and expenses (including without limita- tion, attorney's fees) on account of or in connection with any loss, injury, death or damage to property resulting from (i) the purchase and installation of FF&E, Operating Supplies and Equipment, and Design Materials and (ii) the merchantibility, suitability or con- dition of such items as to any such claim, loss, injury, death, damage or expenses arising from the negligence or malicious act(s) of Purchasing Agent, its contractors, agents, or employees. 10.4 WAIVER OF SUBROGATION. Owner hereby waives any and all rights, claims and demands ot whatsoever nature it may have against PurcFasing Agent on account of any loss or damage to the Hotel or any part thereof or any of its contents, or any other propercy of Owner arising from any risk which if fully covered by fire and extended coverage insurance and Owner shall give notice to its insur- ance carrier or carriers that this waiver of subrogation is con- tained in this Agreement. - 13j - 10 *� RFSOLUTION # 12 � ARTICLE XI MISCELLANEOUS 11.1 BINDING EFFECT. Owner and Purchasing Agent each binds itself, its officers, partners, successors, assigns, legal repre- sentatives, to the other party to this Agreement and to the officers, partners, successors, assigns, and legal representatives of such other part in respect to all covenants of this Agreement. Purchasing Agent shall not assign, sublet, transfer, or pledge as security for any financial loan transaction of any kind, this Agreement without the written consent of Owner. Owner, however, may assign or transfer its rights under this Agreement, provided it remains primarily liable for all obligations of the Owner hereunder. 11.2 AGENCY RELATIONSHIP. Owner does hereby appoint and con- stitute Purc asing Agent as its exclusive agent for the purposes expressly set forth in this Agreement and Owner agrees that it shall not directly or indirectly perform or otherwise arrange for the performance of the duties and obligations of Purchasing Agent hereunder during the term of this Agreement. The parties hereto agree that in the performance of its duties and obligations here- under Purchasing Agent is acting only as the agent of the Owner. 11.3 ENTIRE AGREEMENT.. This Agreement shall constitute the sole understandings of the parties hereto and supersedes all prior negotiations, statements, instructions, representations, or agree- ments, either written or oral, with respect to the Project. 11.4 NOTICES. All Notice(s) required hereunder shall be in writing. If to the Owner, such notice(s) will be delivered to: Mr. William Frueh City Manager Oshkosh, Wisconsin If to the Purchasing Agent, such notice(s) will be delivered to: CSA, Inc. 12805 SEate Highway 55 Minneapolis, Minnesota 55441 Attention: Legal Department 11.5 This Agreement shall be governed by the laws of the State of Wisconsin. 11 - 13k - RESOLUTION # 12 IN WITNESS WHEREOF, the parties hereto have entered into this Agreement as of the Zgth day of March . 19 85 I VWM�Yt1Ea ATTEST: �2 - 13L - 1 Z•� BY: 0 5 RESOLUTION # 12 PURCHASE ONLY EXHIBIT "A" CSA, INC. ATTACHMENT TO CONTRA�i—Fbi��ROFESSIONAL SERYICE RELATIN6 TO INTERIOR DESIGN A��D PROCUREMENT, CONSTRUCTION . This document distinguishes deemed DESIGNED/SPECIFIED, FIXTURES AND EQUIPtdENT AND FOR between certain items which will be AND INSTALLED FURNISHED UNDER FURNITURE and certain items wnicn wi�i o TALLED FURNISHED UNDER GENERAL N TRUC�TON. Excepf as specifically indicated to the contrary, insteT�iations shall be complete, including labor, materials, equipment, installation, fees, taxes, delivery and freight. This document pertains only to the items listed and does not purport to cover. all items which are FURNITURE, FIXTURES AND EQUIPMENT, or a11 items which are GENERAL CONSTRUCTION. The individual responsibilities of designing, specifying, furnishing and installing are additionally outlined in this document. This document is developed as a guide to clarify the responsibilities of the Owner, Architect, feneral Contractor, Designer, and Purchasing Agent from conceptual design and programing through project completion. — 13m — LAST DATE FORM RcYIS�u 3j20/85 CEGEND NOTES SFECIfICATION � DIV. 1, 2, 3, 4, 5, 6, DIVISIONS GENERAL REQUIREMENTS SITE WORK CONCRETE MASONRY METALS-STRUCTURAL & CARPENTRY INDEX MISCELLANEOUS 7, MOISTURE PROTECTION 8, DOORS, WINDOWS AND GLASS 9, FINISHES 10, SPECIALITIES 11, 12, 13, 14, 15. 16, 16-A EQUIPMENT FURNI$HIN^uS SPECIAL CONTRUCTION CONVEYING $YSTEMS MECHANICAL ELECTRICAL ELECTRICAL SYSTEMS ROOM SPACES 500, GUEST SPACE 700, PUBLIC SPACE BCO, SERVICE AREAS 900, KITCHEN AND PANTRIES 1200, LAUNDRY 4200, 4300, 4400 - ELECTRICAL/MECHANICAL 4500, ELEVATGRS - 13n.- RESOLUTION # 12 EXHIBIT "A" iv iv-v 1-21 of 1 of 42 2 of 42 3 of 42 4 of 42 5 of 42 6 of 42 7 of 42 8 of 42 9 of 42 10 of 42 11 of 42 12 of 42 13 of 42 14 of 42 15 of 42 16 of 42 17 of 42 18 of 42 19 of 42 20 of 42 21 of 42 22-42 of 22-24 of 25-28 of 29-39 of 40 of 42 41 of 42 41 of 42 41-42 of 42 42 42 42 42 4Z RESOLUTION# 12 EXHIBIT "A" CONSTRUCTION AND FF8�E CLASSIFICATION LEGEND A F ARCHITECT/ENGINEER GC GENERAL CONTRACTOR (S) ID ' INTERIOR DESIGNER PA PURCHASING AGENT 0 HOTEL OPERATOR X OWNER (DEVELOPER> NOTES 1) FF&E refers to furniture, fixtures and equipment, design materials and operating supplies and equipment. 2) Definitions: Design - The conceptualization, space planning, design development and specification phases of the work. Contract Document - The bid document (working drawing) phase of the work. Budget Purchase - PA indicates the item is in the FF&E budget and the Purchasing Agent will initiate the purchase. - GC indicates the item is in the general construction budget and the general contractor(c) will purchase. - X indicates the item is in the Owners budget and the Owner will purthase. Install - Indicates the party responsible for the ins`altation of the item and budget for that installation cost. 3) In any instance where two or more partiez are indicated to have responsibiiity, the first is primary and the second or third are for coordination. iii - 130 - � RESOLUTION # 12 EXHIBIT "A" CONSTRUCTION AND fF&E CLASSIFICATION BY SPECIFICATON DIVISIONS DIVISION 1, GENERAL REQUIREMENTS CONTRACT BUDGET DESIGN DOCUMENT PURCHASE INSTALL 1> Insurance (Each type to be revieNed> AE GC 2> Payment Bond: Labor/Material (if AE GC required, the premium paid by Owner) 3> Performance Bonds (if required, the AE GC premium paid by Owner) — 13p — Pzge 1 of 4� � RESOI�TI'ION # 12 n EXHIBIT "A" DIVISION 2, �ITE WORK - CONTRACT BUDGET DESIGN DOCUMENT PURCHASE INSTALL 1) Decorative Canopies - Exterior 2> Irrigation System 3> Landscaping - Exterior 4) Planters, Portable - Exterior 5) Plants, Portable Planters - Exterior 6) Pylon & Building Signs - Exterior Service to Sign Structural for 5�gn AE AE AE AE AE ID/AE AE AE - 13q - Paqe � of �� AE AE AE AE AE ID AF AE GC GC GC GC GC PA GC GC GC GC GC G:. GC PA GC GC � ' RESOLUTION # 12 EXHIBIT "A" DIVISION 3, CONCRETE — CONTRACT BUDGET DESIGN DOCUMENT PURCHASE INSTALL 1) Ar[hiteCturdl 2) Bases for Kitchen.Equipment 3) Bases for Lockers 4) Decorative that is part of building 5> Foundation for Exterior Sign 6) Hardeners/Sealers 7> Planters, fixed - Interior & Exterior 8) Topping Slabs, including exposed aggregate AE AE/ID AE/ID AE/ID AE/ID AE AE/ID AE - 13r - Pace ? of 4_ AE AE AE AE AE AE AE AE GC GC GC GC GC GC GC GC GC GC GC GC GC GC GC GC RESOI�7TION # 12 EXHIBIT "A" DIVISION 4, MASONRY CONTRACT BUDGET DESIGN DOCUMENT PURCHASE IN$TALL . 1> Decorative Masonry 2> Fireplaces, if appiicable 3> Threshold Marble AE/ID AE/ID AE/ID — 13s — Page 4 of G� AE AE AE GC GC GC GC GC GC � RRSOLUTION # 12 EXHIBIT "A" DIVISION 5, METALS - STRUCTURAL 8 MISCELLANEOUS = CONTRACT BUDGET DESIGN DOCUMENT PURCHASE INSTALL 1) Architectural metals, railings, etc. AE 2) Bar Foot Rails (Brass, etc.> ID 3) Chandelier Structural Supports AE/IC 4) Corner Guards <In critical areas> AE/IC 5> Counter Supported Stools ID •6> Decorative feature Strips IO '7> Decorative Hoods, Canopies ID 8) Decorative Metal Wallcoverings ID 9) Decorative Structural Support which AE zupports structure of building 10) Floor Troughs and Grates AE/ID 11) Hood Enclosures in Kitchen, ID Stainless steel 12> Metal Wallcovering, kitchen or service AE/ID areas 13> Structural Supports for Signing AE/ID 14) Thresholds AE 15) Nire Mesh Partitions (if required> AElID (Except in kitchen walk-in boxes> 16) Metal Backing in Wall for Heavy AE/ID Wall Mounted Equipment • REFER TO PAGE 6 OF 42 FOR INSTALLATION - 13t - Gage 5 of 42 AE ID AE AE ID ID ID ID AE GC PA GC GC PA PA PA PA GC AE GC ID PA AE GC AE GC AE GC AE GC A.E GC GC PA GC GC GC GC GC GC GC GC GC GC GC GC GC GC ,.J 0 RESOLUTION # 12 EXHIBIT "A" DIVISION 6, CARPENTRY = CONTRACT BUDGET DESIGN DOCUMENT PURCHASE INSTALL 1> Cabinet Hardware - Decorative ID ID PA GC 2) Cabinet Hardware - Standard, ID ID GC GC Non-decorative 3) Dance Floor (Pdrque> AE/ID AE GC GC 4> Dance Fioor (Portable> ID ID PA PA ' S) Decorative Doors, Fixed Screens, ID ID GC GC Fixed Dividers . 6) Dcors - Standard AE AE GC GC 7) Drapery Valance (if part of AF/ID AE GC GC structure) 8> Fire Treatment (as required by AE AE GC GC code) 9> Fixed Seating Coverings ID ID PA PA 10) fixed Seating (Examples: Booths ID ID PA PA Banquettes> •11) Millwork Built-in (Maid's Linen AE/ID AE GC GC Closets, etc.) `12i Millwork, Fixed (Examples: Front, ID ID PA PA Desk, Cashier Stands, Bar Die> •13) Miliwork, Portable (self-supporting) ID ID PA PA Examples: Shelving, Benches, Bins, for dry foods, housekeeping. •14) Paneling, Moldings, Bases ID ID PA PA ' NOTE: FOR THE INSTALLATION OF MILLWORK FURNISHED UNDER Ff&E, INCLUDE AN ALLOWANCE IN TNF CONSTRUCTION AGREEMENT. -13u- c -- F ,-,f q, n � RESOLUTION # 12 EXHIBIT "A" DIVISION 6, CARPENTRY (con't) CONTRACT BUDGET DESIGN DOCUMENT PURCHASE INSTA!L 15) Interior Signing - Directional & Decorative 16> Threshoids - (if required) 17) Wood Biocking for Paneling 18) Wood Blocking for Fixed Millwork 19) Wood Blocking for Decorative Light Fixtures ID AE/ID AE/ID AE/ID AE/ID - 13v - P3^yF I OT 42 ID AE AE AE AE PA GC GC GC GC m GC GC GC GC ._.._ _. ...a�l RESOLUTION # 12 EXHIBIT "A" DIVISION 7, MOISTURE PROTECTION � CONTRACT BUDGET DESIGN DOCUMENT PURCHASE INSTALL 1) Cooler and/or freezer Floor & Insulation 2> Fixed Planters Waterproofing 3> Laundry and/or Kitchen Floors 4) Patio/Deck AE/ID AE/ID AE AE — 13w — Page 8 of 42 AE AE AE AE GC GC GC GC GC GC GC GC 0 RESOLUTION # 12 EXHIBIT "A" DIVISION 8, DOORS. WINDOWS AND G1ASS _ CONTRACT BUDGET — DESIGN DOCUMENT PURCHASE INSTALL 1) Cashier Windows, Bulletproof AE 2) Display Units - Built-in (Directory) ID 3> Display Units - Movable ID 4) Display Units - Surface Applled ID 5) Mirrors - Decorative (with frames) ID Movable 6> Mirrors - Fixed AE/ID •7) Mirrors - Column Covers or Miliwork ID Related AE ID ID ID ID GC PA PA PA PA GC GC PA PA PA AE GC GC ID PA PA 8> Mirrors - Full-length Door in guest AE/ID AE room 9) Mirrors - Guest Bathroom & Vanity AE 10) Shelving - Glass in Display Unit ID 11) Store Fronts, Complete AE ' NOTE: REFER TO PAGE 6 OF 42 FOR INSTALLATION - 13x- Page 9 of 42 AE ID AE GC GC PA GC GC GC GC GC RESOLUTION # 12 EXHIBIT "A" DIVISION 9, FINISHES CONTRACT BUDGET — DESIGN DOCUMENT PURCHASE INSTALL 1> "Blank Stock" where required, Wall AE Preparation (If required for concrete wall or specialty areas> 2> Carpets and Pads ID 3> Ceiling, Acoustical Tile AE/ID 4) Ceiling, Metal Pan/Washabte AE (For Kitchen> As per code 5> Ceramic Tile Floors and Walls AE/ID 6) Epoxy Finishes AE/ID 7) Flexible wallcovering for Guest ID Room 6) flexible Wallcovering for Public ID Areas 9) floor Coverings, Rezilient AE/ID 10) flooring, Quarry Tile for KitChen AE and Walk-in Coalers and Freezers AE GC GC ID PA PA AE GC GC AE GC GC AE GC GC AE GC GC ID PA GC ID PA GC AE GC GC AE GC GC 11) Natural Finishes: Stain, Varnish, AE/ID AE Oil, Etc. for Contractors' & Owners' Installed Items 12> Painting, inciuding priming and AE/ID AE sizing behind Walicovering 13) Terrazzo AE 14> Wallcovering Adhesives AE 15) Wall Surfaces, Ceramic Tile AE or Vitra-Glaze Block for Kitchen - 13y - _ ,� �f �� AE AE AE GC GC GC GC GC GC GC GC GC GC n RESOLUTION # 12 EXHIBIT "A" DIVISION 10, SPECIALTIES = CONTRACT BUDGET DESIGN DOCUMENT PURCHASE INSTALL 1) Accessories - Employee Restroom 2) Accessories - Guest Room Bathroom 3) Accessories - Public Restroom 4) Chutes - Laundry/Trash 5> :loset Rods, Shelves, Hooks (Inc. Guest Room - Vogel-Peterson) 6> Coat Racks - Portable 7> Display Boards and Interior Signs 8> Display Boards/Screens - Built-in or Nung for Meeting Rooms 9) Door Numbers 10) Employee Lockers and Benches 11) Exterior Signs <hook up by GC> 12) Fire Extinguisher Cabinets and Extinguishers as required by Code 13> Fire Extinguisher without Cabinets in Me[hanical Spaces 14) Hardware - ArchiteCtural 15) HardNare - Automatic Door (Locks, Threshold> 16) Hardware - Decorative Door (Locks & Closures by G.C.) 17) Hardware - Store Front AE/ID AE/ID AE/ID AE AE/ID AE AE AE AE AE GC GC GC GC GC GC GC GC GC GC ID ID PA PA ID ID PA PA ID ID PA PA ID ID ie AE ID ID ID AE AE AE AE/ID AE AE/ID AE pA PA PA PA PA PA GC GC GC GC GC GC GC Gi, ID ID PA PA AE AE GC GC - 13z - Paae il of 42 � d RESOLUTION # 12 EXHIBIT "A" DIVISION 10, SPECIALTIES (con't) 18) Partitions - Movable, with Built- in TraCk 19> Partitions, Movable - Covering ZO> Partitions - Portable 21> Partitions - Public Toilet 22) Safe Deposits - Cashier 23> Safe Deposits - Guest 24) Shelving - Storge (self-supporting) 25) Storage Cabinets - Metal 26> Planters, Portable - Interior 27) Plants - Interior (Lease Item) CONTRACT BUDGET DESIGN DOCUMENT PURCHASE INSTALL AE/ID ID/AE ID AE/ID ID ID ID ID ID ID - 13aa - Page 12 of 42 AE ID ID AE ID ID ID ID ID ID GC PA PA GC PA PA PA PA PA PA GC GC PF GC GC GC PA PA PA PA .J 0 RESOLUTION # 12 EXHIBIT "A" DIVISION 11, EQUIPMENT _ CONTRACT BUDGET DESIGN DOCUMENT PURCHASE INSTALL 1) Ballroom $potlight (Trouper> 2> Bar Fixtures (Hook-up by GC) 3> Refrigeration Coil Drain Lines 4> Cooler Boxes and Walk-ins, Coils, Controls, Compre55ors (hook-up by GC> 5> D�inking Fountain 6> Electric Clocks (Public Areas, Service Areas) 7) Guest Room Refrigerators or Ice Machines (HOOk up by GC) 8> Kitchen Equipment (HOOk-up by GC> 9) Laundry/Dry Cleaning Equipment <HOOk-up by GG 10) Loading Dock Levelers 11> Maintenance Equipment 12) Portable Stages, Platforms, Etc. 13) Projection Screens, Portable 14) Projection Screens, Manual or Motorized - Buiit-in ID ID AE/ID ID ID ID AE ID AE AE ID ID ID ID ID ID AE ID ID ID ID - 13bb - Page 13 of 42 ID ID AE ID ID ID ID PA PA GC PA PA PA GC PA GC GC PA GC PA PA PA PA GC PA FA PA PA PF PA GC PA PA PA GC ..J 6 RFSOLUTION # 12 EXHIBIT "A" DIVISION il, EQUIPMENT (Con't> CONTRACT BUDGET . DESIGN DOCUMENT PURCHASE INSTALL 15> Trash Compactors (Hook-up 0/X 0/X X GC by GC) (Lease Item) 16) Ice Machines (Hook-up by GC> ID ID PA PA 17) Window Washing $taging AE AE GC GC 18> Vending Machines (lease) 0 0/X 0/X 0/X - 13cc - Paee '4 of 42 �r� � ` RFSOIdJTION # 12 EXHIBIT "A" DIVISION 12, FURNISHINGS = CONTRACT BUDGET DESIGN DOCUMENT PURCHASE INSTALL 1> Ash Trays (built-in> 2) Ash Trays (portable or urn) 3) Carpet (Interior and Exterior) 4) Drapes - Manuaily operated - Track Hardware 5) Drapes - Motorized - Equipment, Hardware (Electric hook-up by GC> 6> Fireplace Grates, Logs, Burners 7> Sports Equipment 8) Stage Drapery Track, Controls (Electrical Hook-up by GC) AE/ID ID ID ID AE ID ID ID ID I6 ID ID ID IC ID ID - 13dd - Page 15 of 4^ GC PA PA PA GC PA PA PA PA PF. PA PA PA PA PA PA . � 0 RESOLUTION # 12 EXHIBIT "A" DIVISION 13, SPECIAL CONSTRUCTION = CONTRACT BUDGET DESIGN DOCUMENT PURCHASE INSTALL 1) 2) 3) 4) Flagpoles Life Rings, Etc., Per Code Sauna Swimming Pool with anything permanently attached AE AE AE AE — 13ee — Page 16 of 42 AE AE AE AE GC GC GC GC GC GC GC GC ._ J RESOLUTION # 12 EXHIBIT ��a�� DIVISION 14, CONVEYING SYSTEMS = CONTRACT BUDGE7 DESIGN DOCUMENT PURCHASE INSTALL 1) Baggage Conveyors (if required) 2> Dumbwaiter (if required) '3> Elevator Cab, Decorative 4> Elevator Entrances, Jambs, Doors, Decorative 5) Elevators, (To be used for Ff&E Installation) 6> Escalators (if required) 'REFER TO NOTE ON PAGE 42 fOR ALLOWANCE AE AE AE/ID AE/ID AE AE AE AE AE AE AE AE — 13ff — Page 17 of 4? GC GC GC GC GC GC GC GC GC GC GC GC A x e RESOLUTION # 12 EXHIBIT "A" DIVISION 15, MECHANICAL CONTRAC7 BUDGET DESIGN DOCUMENT PURCHASE INSTALL 1> Ducts from Laundry AE 2) Ducts/Ro�f Fans from Kitchen AE Equipment Hoods 3> Grease Traps AE 4) Hand Washing Sinks for Kitchen AE Equipment 5) Hot Water Booster for Kitchen ID Equipment (if required> 6) K-Way Conduit for Refrigerator AE Lines and Central Beverage Dispenser. 7> Kitchen Hoods and/or Fire Protection ID System (Fuel shut off vaive installed by GC) 8> Laundry Equipment ID Hook up by G.C. 9> Plumbing Fittings, Traps, etc. AE 10) Plumbing Fixtures, standard AE 11) Product Refrigerator without ID hook-up (non aaik-in) 12) Rough-in with hook-up of Bar AE/ID Fixtures 13) Rough-in with hook-up of Kitchen AE/ID Equipment 14) Rough-in with hook-up of Laundry AE/ID 15) Rough-in with hook-up of Vending/ AE/ID Ice Machines 16) Wat2r So`tener (Laundry, Dish- AE washinc, if required> Page 18 of 42 - 13gg - AE AE AE AE ID GC GC GC GC GC GC GC GC PA GC AE GC ID PA ID AE AE ID AE PA GC GC PA GC GC PA GC GC PA GC GC AE GC AE GC AE GC AE GC GC GC GC G;; ..� RESOLUTION # 12 EXHIBI7 "A" DIVISION 16, ELECTRICAL - CONTRACT BUDGET DESIGN DOCUMENT PURCHASE INSTALL •1> Fixtures, Catalog Decorative `2) Fixtures, Custom-built Decorative 3) fixtures, Portable and/or Lamps (with Bulbs) `4) Fixtures, theatrical (with hulbs) track 5> Lighting, Building Exterior 6) Lightinq, Landscape 7) Mounting brackets, bolts, eyes, frames for decorating fixtures 8) Recessed general lighting fixtures (layout) <Include verification of footcandle requirements> '9) Rough-in Bar '101 Rough-in OeCOrative F�xtures 'll) Rough-in Exterior Signs •12> Rough-in Interior Illuminated Signs •13) Rough-in Kitchen Equipment, productS refrigerator •14; Rough-in Laundry/Valet Equipment •15> Rough-in Systems (see Div. 16-A) •16) Rough-fn Vending/Ice Machines 17) Setting and Trimming Detorative FixtUres ID ID ID IQ ID PA GC ID PA GC ID PA PA ID PA GC AE AE GC GC AE AE GC GC AE AE GC GC AE/ID AE AE/ID AE(ID AE/ID AE/ID AElID AE/ID AEIO AEJID AE/ID AE AE AE AE AE AE AE AE AE GC GC GC GC GC GC GC GC GC GC GC GC GC GC GC GC GC GC GC GC 'H�k-up by Contra[tor - 13hh - Page '9 cr »_ I �. .��.«e___ ,.r.. RESOLUTION # 12 EXHIBIT "A" DIVISION 16-A, ELECTRICAL SYSTEMS CONTRACT BUDGET — DESIGN DOCUMENT PURCHASE INSTALL SYSTEMS EQUI?MENT: 1) Background Music - Restaurant, AE/0 Coffee Shop and Public Areas (With Paging) 2) Sound 5ystem - Lounge (entertainent) ID/AE 3) Closed Circuit TV - Empty Conduit - AE/ID Cable, Wireways (if required) 4) Dimming - Dimmer and Controls AE/ID 5) Fire Alarm - Manual and Automatic AE (as required) ` 6) Hold-up Alarm AE/0 7> Message Waiting - In Telephone 0/X 8) Radio Antenna (if required> AE/0 ' 9> Room Status ID 10> Smoke Detection (if required) AE •71) Teleautograph ID `12) Telephone (Lease or Purchase 0/X Option) '13) Teletype ID 14) Televisio� Antenna AE/0 15) Theatrical Lighting ID (Circuits and Electricai hook-up by AElGC> ` CONDUIT FOR ANY AND ALL OF THE ABOVE SYSTEMS AS PER CODE. (SY GENERAL CUNTRACTOR) " HOOK UP BY GC - 13ii - Paqe ?0 oT 4? AE GC GC ID PA AE GC AE GC AE GC AE 0/X AE ID AE ID 0/X ID AE ID GC X GC PA GC PA X PA GC PA PA GC GC GC GC X GC GC GC PA X PA GC G� 0 e RESOLUTION # 12 EXHIBIT "A" DIVISON 16-A, ELECTRICAI SYSTEMS (Con't> 16) Voice Amplification - Ballroom Etc. 17) Wireless Intercom Antenna (Pocket Paging) 18> Wireless Intercom Instruments CONTRACT BUDGET DESIGN DOCUMENT PURCHASE INSTALL AE/0 AE GC GC ID ID ID ID - 13�� _ Page 21 of 4� PA PA PA PA J RFSOLUTION # 12 EXNIBIT "A" CONSTRUCTION & FF&E CLASSIFIGATION BY ROOM SPACES 500 GUEST SPACES I. GUEST ROOMS: 1) TV Antenna 2> Carpentry 3) Carpet 4) Ceilings: Accoustical Paint Special finish 5> Connecting Door & Silencer 6) Drapery .•7) Electrical 8> Furniture 9> Lock Systems 10) Mechanical 11) Message Waiting Lignt (in telephone) 12) TV andlor radio 13> Teiephone 14) Wall Finishes: `Miilwork (Gen. Contr) Paint Vinyl 'REFER TO PAGE 6 OF 42 FOR I4iSiALLATION CONTRACT BUDGET DESIGN DOCUMENT PURCHASE INSTALL AE/0 AE AE AE ID ID AE/ID AE AE/ID AE AE/ID AE AE AE ID ID AE/ID AE ID ID AE/0 AE AE AE oix oix ID/0 ID 0/ID/X 0/X AElID AE AE/ID AE ID ID — 13�_ Page 22 of 4_ GC GC PA GC GC GC GC PA GC PA GC GC 0/X PA X GC GC PA GC GC PA GC GC GC GC PA GC PA GC GC O/X ; PA x GC GC G� II. GUEST BATHROOMS: 1) Bath Linen ' 2) Carpentry 3> Ceilings: Ac[ouStiCdl Paint 5pecial finish 4) Electrical 5) Floor & Wall Tile 6) Hardware & Accessories 7) Heat Lamp 8) Mirrors 9) Mixing FauCet 10> Shower Curtain 11> Shower Head 12) Vanity Marble 13> Vanity Millwork 14) Wall Finish: Paint Vinyl III. GUEST FLOOR CORRIDORS: 1) Ash Urns: Fixed Portable 2) Carpet RESOLUTION # 12 EXHIBIT "A" CONTRACT BUDGET DESIGN DOCUMENT PURCHASE INS?A�L ID AE/ID AE/ID AE/ID AE/ID AE AE/ID AE/ID AE AE AE ID AE AE/ID AE/ID AE/ID ID AE/ID ID ID P�^e �3 c` 4� — 13LL — ID AE AE AE AE AE AE AE AE AE AE ID AE AE AE AE ID AE ID ID PA GC GC GC GC GC GC GC GC GC GC PA GC GC GC GC PA GC PA PA PA GC GC GC GC GC GC GC. GC GC GC PA GC GC GC GC GC GC PA PA � III. GUEST FLOOR CORRIDORS: (con't) — 3) Ceilings: Accoustical • Paint Special Finish 4) Door Security Viewers 5> Door Silencers 6> Doors 7) Fire Cabinet & Hose 8) Fire Extinguisher 9> furniture 10) Lock System • 11> Lighting 12) Mirrors/Pictures/ Artifa[ts '* 13) Paneling & Elevator Lobby 14) Room Numbers 15) Wall Finish: " MillWOrk Paint Vinyl • IF DECORATIVE - SUPPLIED UNDER FF&E `* REFER TO PAGE 6 Of 42 FOR INSTALLATION RESOLUTION # 12 EXHIBIT "A" CONTRACT BUDGET DESIGN DOCUMENT PURCHASE INSTALL AE/ID AE/ID AE/ID AE AE AE/ID AE AE ID AE/0 AE/ID ID AE AE AE AE AE AE AE AE ID AE AE ID ID ID ID ID AE/ID AE AE/ID AE ID ID - 13inn - Paae Z4 of 42 GC GC GC GC GC GC GC GC PA GC GC PA GC GC GC GC GC GC GC GC PA GC GC PA PA GC PA PA GC GC GC GC PA GC 700 PUBLIC SPACE — I LOBBY AND PUBLIC FOYERS: � 1) Ceilings: Accoustical Paint Special Finish 2) Chandeliers 3> Drapery 4) Furniture 5) Graphics & 5igning 6) Mirrors/pictures/ artifacts 7) Mirrors — Fixed 8) Recessed Lighting 9> Store fronts 10) Tetephone 800ths 11) Terrazzo/Tite Floor & Base 12> Wall Finish: •Millwork Paint Vinyl 13) Wall Sconces DESIGN AE/ID AE/ID AE/ID ID ID ID ID ID AE/ID AE AE/ID ID AE/ID ID AE/ID ID ID RFSOLU'i'ION # 12 EXHIBIT "A" CONTRACT DOCUMENT AE AE AE ID ID ID ID ID AE AE AE ID AE ID AE ID ID II. PUBLIC RESTROOMS: 1> Built—in Vanities AE/ID AE 2) Ceilings: AC[oustical AE Paint AE Special Finish AE ' REFER TO PAGE 6 OF PAGE 42 FOR INSTALLkTION Paoe 25 of 42 — 13nn — AE AE AE BUDGET PURCHASE INSTALL GC GC GC PA PA PA PA PA GC GC GC PA GC GC GC GC GC PA PA PA PA GC GC GC P�. GC PA PA GC GC PA Gi, PA GC GC �C GC GC GC GC GC GC 0 II. PUBLIC RESTROOMS: (ton't> 3> Furniture • 4) Hardware & Accezsories 5) lighting & Electrical 6> Mirrors & Coat hooks 7) Piumbing & Fixtures 8) Telephone 9) Tile Floor 10> Toilet Partitions 11) Wall rinish: Tile Vinyl III. MEETING RQOMS/BALLROQM: 1) Carpet 2) Ceilings: Accoustical Paint Spetial finish 3) Chandeliers 4> Dance Floor: Parquet - Built-in Portable 5> Lights: General/Down 6) lighting & Ele[trical RESOLUTION # 12 EXHIBIT "A" CONTRACT SUDGET DESIGN DOCUMENT PURCHASE INS?ALL ID AE/ID AE AE AE 0/ID AE/ID AE/ID AE/ID ID ID AE/ID AE/ID AE/ID ID AElID ID ID AE AE AE AE O/X AE AE AE ID PA GC GC GC GC X GC GC GC PA PA GC G� GC GC X GC GC GC GC ID PA PA AE GC GC AE GC GC AE GC GC ID PA GC AE GC GC ID PA PA AE/ID AE GC GC AE/ID AE GC GC - 1300 - Paae 26 of 42 J III. MEETING ROOMS/BALLROOMS: (Con't> — 7) Movable Partition Walls: • Wall Unit Applied Finish 8) Sound & Visual System g) Tables, Chairs, 5taging 10> Wall finish: ' Millwork Paint Vinyl il) Wall SCOnces IV. RESTAURANTS AND SARS: 1) Account�ng Machines (lease> ' 2> Back Bar Unit ' 3> Built In: Cabinetry Shelving Counters Stools Service Station 4> Carpet ' S) Cashier/Host Station 6> Ceilings: ACCOUStital Paint Special Finish 7) Chandeliers ' 8> Decorative Ooors/ Windows ' REfER TO PAGE 6 Of 42 FOR IN$TALLATON RESOLUTION # 12 EXHIBIT "A" CONTRACT BUDGET DESIGN DOCUMENT PURCHASE INSiALL AE/ID AEIID AE/0 ID ID AE/ID ID ID/AE ID/0 ID ID ID ID ' I�J ID ID ID AE!ID AE/ID AE/ID ID ID F�413�� of 42 AE ID AE ID ID AE ID ID ID/0 ID ID ID ID ID ID ID ID AE AE AE ID ID GC PA GC PA PA GC PA PA 0/X PA PA PA PA PA PA PA PA GC GC GC PA PA GC GC GC PA PA GC GC GC 0/X PA PA PA PA PA PA PA PA GC GC GC GC PA IV. RESTAURANTS AND BARS: (con't) ' 9) Dividers—decorative • 10) Drapery (exCept theatrical) 11> Electrical Plumbing " 12) Under Bar Equipment • 13> Front Bar Unit 14) Furniture 15> Lights: General/Down 16) Graphics & 5igning 17> Lighting (Decorative) 18> Mirrors/pi[tures/ artifacts ,19) Mirrors — Fixed 20> Sound System (Background dnd Paging) •` 21) Sound System — Lounge (or video) 22) Telephone 23> Tile Floor 24) Wall finiSh: • Miliwork Paint Vinyl 25) Wali Sconces •REFER TO PACE 6 Of 42 FOR INSTALLATION "HOOK UP BY G� RFGOLUTION # 12 EXHIBIT "A" CONTRACT BUDGET DESIGN DOCUMENT PURCHASE INSTALL ID/AE ID AE/ID ID ID ID AE/ID ID ID/AE ID ID ID AE ID ID ID AE ID ID ID PA PA GC PA PA PA GC PA PA PA GC PA GC PA PA PA GC PA GC PA IDlAE AE GC GC AE/ID AE GC GC ID ID PA PA 0/ID 0 0 0 AE/ID AE GC GC ID ID PA PA AE/ID AE GC GC ID ID PA GC ID/AE ID PA GC — 13qq — Page 28 of 4_ 0 800 SERVICE AREAS — I. MAIDS CLOSETS: ' 1) Ceilings: Accoustical Paint Special Finish 2) Lighting 3) Wall Finish: Paint 4) Shelvinq <Fixed> (Portable> 5) Telephone 6> Vinyl Floor II. SERVICE ELEVATOR LANDING: ll Floor 2> Ceiling 3) Walls 4> Chutes: Linen Trash 5> Lighting III. LOCKER ROOMS: 1) Ash Urns: fixed 2) Benches RESOIxJTION # 12 EXHIBIT "A" CONTRACT BUDGET DESIGN DOCUMENT PURCHASE INSTALL AE AE AE AE AE/ID AE/ID ID 0/ID AE/ID AE AE AE AE AE AE AE/ID ID — 13rr — Page 29 of �2 AE AE AE AE AE ID ID 0 AE AE AE AE AE AE AE AE ID GC GC GC GC GC PA PA 0 GC GC GC GC GC GC GC GC PA GC GC GC GC GC PA PA 0 GC GC GC GC GC GC GC GC PA . III. LOCKER ROOMS: (CON'T) 3> Ceilings: , Accoustical Paint Special finish 4) Ele�trical Plumbing 5) Graphics & Signing 6> lockers 7) Mirrors 8) Shower Curtain 9) Speakers 10) Tile Floor 17) Wall Finish: Paint Tile IV. STORE ROOMS: 1) fire Extinguishers 2) Ceiling 3> floor 4> Lighting 5) Shelving & Pallets 6> Walls RESOLUTION # 12 EXHIBIT "A" CONTRACT BUDGET DESIGN DOCUMENT PURCHASE INSTA.LL AE/ID AE1ID AE/ID AE ID ID AE/ID ID AE/0 AE/ID AE/ID AE/ID AE AE AE AE ID AE — 13ss — Page 30 of 42 AE AE AE AE ID ID AE ID AE AE AE AE AE AE AE AE ID AE GC GC GC GC PA PA GC PA GC GC GC GC GC GC GC GC PA GC GC GC GC GC PA PA GC PA G:, GC GC GC GC GC GC GC PA GC i _ V. HOUSEKEEPING: 1) Ceilings: � Accoustical Paint Special Finish ` 2) Co�trol Desk 3> Uniform Garment Racks 47 Furniture 5> Graphlcs & Signing 6) Key Control Box 7> Lighting 8) Wall Finish: Paint 9) Room Status 5ystem 10) Shelving 1]> Vinyl Ftoor VI. MAINTENANCE SHOP: ' 1) Buitt—in Shelving ' 2) Cabinetry 3) Electrical 4) Equipment: Portable Stationary 5) Ceiling ' REFER TO PAGE 6 OF 42 FOR INSTALLATION RFSOLUTION # 12 EXNIBI7 "A" CONTRACT BUDGET DESIGN DOCUMENT PURCHASE INSTALL AElID AE/ID AE/ID ID ID ID ID ID AE/ID AE/ID AE/0 ID AE/ID ID ID AE ID ID AE/ID — 13tt — Page 31 of 42 AE AE AE ID ID ID ID ID AE AE oix ID AE ID ID AE ID ID AE GC GC GC PA PA PA PA GA GC GC x PA GC PA PA GC PA PA GC GC GC GC GC PA PA PA PA GC GC GC PF GC GC GC GC PA DA GC VI. MAINTENANCE SHOP: (COn't> 6) Ftoor 7) Furniture & Files 8) Hand Tools 9) Key Cabinet 10> Movable Shelving 11) 5upplies 12) Telewriter 13) Wdlls 14) Work BenChes VII. STAFF DINING ROOM: 1) Cash Register 2) Ceilings: A[[oustical Paint , Special Finish 3) Equipment: Hook-up Set In Place 4) Furniture 5) Graphics & Signing 6> Hand Sink •• 7) Kitchen Equipment 8> Lighting & Electrical ` REFER TO P,4GE 6 OF 42 FOR INSTALLATION •• HO�K UP BY GC RESOLUTION # 12 EXHIBIT "A" CONTRACT BUDGET DESIGN DOCUMENT PURCHASE INS7ALL AEIID ID ID ID ID ID ID AE ID AE ID ID ID ID ID ID AE ID GC PA PA PA PA PA PA GC PA GC PA PA PA PA PA PA GC PA 0/ID 0/ID PA PA AE/ID AE/ID AE/ID AElID ID ID ID AE ID AE - 13uu - Paae -- �r "Z AE AE AE AE ID ID ID AE ID AE GC GC GC GC PA PA PA GC PA GC GC GC GC GC PA PA DA GC PA GC c VII. STAfF DINING ROOM: (COn't) 9) Plumbing & Mechanical 10> Speaker 11) Stainless Steel Fabrication 12) Vinyl Floors 13> Wall Finish: Paint Vinyl VIII. ROOM SERVICE: 1> Ceilings: A[coustical Paint Spe[ial Finish 2> Electrical 3) Equipment: Hook-up Portable 4) Graphics & Signing • 5) Kitchen Equipment 6) Lighting 7) Stainless Steel fabrication 9) Tile Floor 9) Wall finish: Paint Tile ` HOOK UP BY GC R�SOLUTION # 12 EXHIBIT "A" CONTRACT BUDGET DESIGN DOCUMENT PURCHASE INSTALL AE AE/0 ID AE/ID AE/ID ID AE/ID AE/ID AE/ID AE AE/ID ID ID ID AE/ID ID AE/ID AE/ID AE/ID - 13w - ?age 33 �` �� AE AE ID AE AE ID AE AE AE AE AE ID ID ID AE ID AE AE AE GC GC PA GC GC PA GC GC GC GC GC PA PA PA GC PA GC GC GC GC GC PA GC GC GC GC GC GC GC GC PA PA PA GC PA GC GC GC IX. PURCNASING/RECEIVING/ — STORAGE • 1) Alarm/Security System ' 2> Built—In: Shelving 3> Ceilings: Accoustical Paint Special Finish 4) Electrical 5> Furniture & files 6> Graphics & Signing 7) Paint Walls 8) Platform Scale — Portable 9) Refrigeration: Utility ,' Supply and Coil Drawing Hook—up 10> Shelving & Pallets il) Vinyl/Tile Floor X. OFFICES—PERSONNEL & SECURITY: 1) Built—In: Desks 2) Ceilings: Accoustical Paint Special Finish 3> Furniture & Files ' REFER TO PAGE 6 Of 42 FOR INSTALLATION RESOLUTION # 12 EXHIBIT "A" CONTRACT BUDGET DESIGN DOCUMENT PURCHASE INSTALL 0/AE AE/ID AE/ID AE/ID AE/ID AE ID ID AE/ID ID AE GC GC AE AE AE AE AE ID ID AE ID AE/ID AE ID ID AE/ID AE ID ID AE/ID AE/ID AE/ID ID — 13ww — Page 34 of 42 AE AE AE ID GC GC GC GC GC PA PA GC PA GC GC GC GC GC PA PA GC PA GC GC PA PA GC GC PA PA GC GC GC PA GC GC GC PA J � RESOLUTION # 12 X. OfFICES-PERSONNEL & SECURITY: <con't> . 4) Lighting & Electrical 5> Vinyl Floor 6) Wall Finish: Paint Vinyl XI. OFFICES-ADMIN/SALES/ACC7G: 1) Built-In: Shelving 2) Carpet 3) Ceilings: Accoustical Paint Speciai Finish 4> Drapery 5> Furniture & Files 6) Glass or Oecorative Door 7) Graphics & Signing 8> Lighting & ElectriCal 9) Mirrors/Picture5/ Artifacts 10> Office Machines 11> Telephone * REFER TO PAGE 6 OF 42 FOR INSTALLATON EXNIBIT "A" CONTRACT BUDGE7 DESIGN DOCUMENT PURCHASE INSTALL AE/ID AE GC GC AE/ID AE P� GC AE/ID AE GC GC ID ID PA GC AE/ID ID AE/ID AE/ID AE/ID ID ID ID ID AEIID ID ID 0/ID - 13�ac - Page 35 of 4' AE ID AE AE AE ID ID ID ID AE ID ID 0/X GC PA GC GC GC PA PA PA PA GC PA PA X GC PA GC GC GC PA PA PA PA G� PA PA x : • XI. OFFICES-ADMIN/SALES/ACCTG: <con't> ` 12> Wall finish: ` Miliwork � Paint Vinyl XII. FRONT OFFICE: 1) Accounting Machines ' 2> Built-In: Cabinetry Shelving Desk Unit-Back side Desk Unit-Front side 3> Electrical 4) Furniture & Files ' S) Key Rack " 6> Lighting 7) Messaging Writing System 6) Room Status System/ Room Rack ' 9> Safe/Security Vault `?0> Safety Deposit Boxes 11) Telephone 12) Telephone Register Unit 13> Carpet Floor * REFER TO PAGE 6 Of 42 fOR INSTALLATION " SPECIAL DECORATIVE BY CONTRACTOR RESOLiJTION # 12 EXHIBIT "A" CONTRACT BUDGET DESIGN DOCUMENT PURCHASE INSTALL ID AE/ID ID ID ID ID ID ID AE/ID ID ID AE/ID ID ID ID ID 0/ID 0/ID ID - 13yy - Fage 36 ��� :_ ID AE ID ID ID ID ID ID AE ID ID AE ID ID ID ID 0/X 0/X ID PA GC PA PA PA PA PA PA GC PA PA GC PA PA PA PA X X PA PP. GC GC PA PA PA PA PA GC PA GC GC PA G� GC GC X X P4 , � XII. FRONT DESK: (con't> 15> Wall finish: • ` Millwork Paint Vinyl XIII. RESERVATIONS/BACK OfFICE: ` 1) Built-In: Cabinetry Shelving 2) Carpet 3) Ceilings: Accoustical Paint Special Finish 4) Furniture & Files 5) Li9hting & Electricity 6) Reservation Machinery 7> Sound Proofing 8) Telephone 9> Wall Finish: Paint Uinyi 10) Carpet Floor XIV. GENERAL CASHIER OfF10E 1) Alarm/Security System • REFER TO PAGE 6 OF 42 for INSTALLATION RESOLUTION # 12 EXHIBIT "A" CONTRACT BUDGET DESIGN DOCUMENT PURCHASE INSTALL ID AE/ID ID AEJID AE/ID ID AE/ID AE/ID AEJID ID AE/ID ID AE 0/ID AE/ID ID ID ID AE ID AE AE ID AE AE AE ID AE ID AE 0 AE ID ID AE/0 AE - 13zz - Paae 37 of 4� PA GC PA GC GC PA GC GC GC PA GC PA GC 0 GC PA PA GC PA GC GC GC GC PA Ur. GC GC PA GC PA GC 0 GC GC PA GC r • XIV. GENERAI CASHIER OFFICE: - (Con't) ' * 2> Built—In: Cabinetry Shelving 3) Ceilings: Accoustical Paint Speciai Finish •4) Drop Vault 5) Furniture & Files 6) Lighting & Electrical `7> Safe/Security Vault 8> Vinyl Tile Floor 9) Carpet Floor 10) Wall FiniSh: Paint Vinyl XV. PBX SWITCHBOARD ROOM: •1) Built—In: Cabine`ry Shelving 2) Ceilings: Accousticai Paint Special finish 3> Furniture & Files 4) Lighting & Electrical ' REFER TO PAGE 6 Of 42 FOR INSTALLATION RESOLUTION # 12 EXHIBIT "A" CONTRACT BUDGET DESIGN DOCUMENT PURCHASE INSTALL AE/ID AE/ID AE/ID AE/ID AE/ID ID ID AE/ID ID AE/ID ID AE/ID ID AE/ID AE/ID AE/ID AE/ID AE/ID ID AE/ID — 13�a _ Page 38 of 4= AE AE AE AE AE ID ID AE I•D AE ID AE ID AE AE AE AE AE ID AE GC GC GC GC GC PA PA GC PA GC PA GC PA GC GC GC GC GC PA GC GC GC GC GC GC GC PP. GC GC GC PA G� GC GC GC GC GC GC PA GC XV. PBX SWITCHBOARD ROOM: — (con't? , 5> Slave Typewriter 6) Vinyl Tile Floor 7> Carpet floor 8) Wall Finish: Paint Vinyl RFSOLUTION # 12 EXHIBIT "A" CONTRACT BUDGET DESIGN DOCUMENT PURCHASE INSTALL ID AE/ID ID AE/ID ID — 13bbb — Page 39 cf 42 ID PA PA AE GC GC ID PA PA AE GC GC ID PA GC , . • 900 KITCHEN AND PANTRIES 1> Ceilings: • Accoustical Paint Special Finish 2) Cooking Ventilation System 3> Furniture & Files 4) Graphics & Signing ' S) Kitchen Equipment 6) Lighting & Electrical 7> Paint Walls 8) Plumbing & Fixtures (hand sinks, towel and soap dispensers, mop sinks) 9) .Refrigeraticn lines (Utility supply and coil drain line) Hook-Up by GC 10> Stainless Steei: Cdbinetry 5helving Fabrication Walls 11) Tile: Floor (Quarry) Wall ' HOOK UP BY GC RFSOLUTION # 12 EXHIBIT "A" CONTRACT BUDGET DESIGN DOCUMENT PURCHASE INSTALL AE/ID AE GC AE/TD AE GC AE/ID AE GC ID ID PA (hood only)(hood only)(hood only) ID ID PA ID ID PA ID ID PA ID/AE AE GC AE AE GC AE AE GC GC G� GC GC PA PA PA G� GC GC ID ID PA PA -- -- -- GC ID ID PA PA ID ID PA PA ID ID 4A PA ID ID PA PA AE/ID AE GC GC AE/ID AE GC GC - 13c�� _ Paoe ;�� �r �� , � , . 1200 LAUNDRY = 1> Electrical P) Equipment & Carts 3) Equipment (Utility supply hookup by GC> 4> Floor/Ceiling/Walls 5> Furniture 6) Plumbing & Mechanical 7) Shelving & Racks 8) Ventilation 9) Work Tables 4200 4300 ELECTRICAL/MECHANICAL 4400 I. ELECTRICAL/MECHANICA U TELEPHONE ROOM II. EMERGENCY STAIRhELL III. ELEVATOR PENTHOUSE 4500 ELEVATORS 1) Advertising Frames 2) Ash Urns - Fixed RESOLUTION # 12 EXHIBIT "A" CONTRACT BUDGET DESIGN DOCUMENT PURCHASE INSTALL AE/ID ID ID AE ID AE/ID ID AE/ID ID AE AE AE AE ID AE/ID - 13ddd - Paa2 41 of 42 AE ID ID AE ID AE ID AE ID AE GC GC PA PA PA P4 Hookup- GC GC GC PA PA GC GC PA PA GC GC PA PA GC GC AE GC GC AE GC GC AE GC GC ID PA PA AE GC GC � � .. • 4500 ELEVATORS (con't) _ 3) Cab Interior 4) Carpet 5) Door Exterior 6) Graphics & Signing 7) Lighting 8) System (Elevator) 9) Telephone RESOLUTI013 # 12 EXHIBIT "A" CONTRACT BUDGET DESIGN DOCUMENT PURCHASE INSTALL AElID ID AE/ID AEIID AE/ID AE AE/0 AE ID AE AE AE AE AE NOTE: Suggest that an allowance of $ for passenger cabs and $ for service cabs be provided in the construct�on specification for finishes in elevator cabs. — 13eee — Page 42 of 42 GC PA GC GC GC GC GC GC PA GC GC GC GC GC 5��:c � ➢ � � � � N .J ("') c� �� � � � � � � v^ �v q Cn `C�: . C` � � eJ:� �-, � a� Z h � F+. p � � 2 .. �G Dp fD O N � � ill __� ''�'r �a h � n a \ O O < �n N 3 X ("') O O s � � h Z n d � n � C'f c+ \ � � lD C � � cF C � N T X c-F C Z N N � N N =4F: N