PURPOSE: CAANGE ORDER NO. G-2 - OSHKOSH CENTRE
INITIATED BY: CITY ADMINISTRATION
BE IT RESOLVED by the Common Council of the City of Oshkosh
that the following Change Order to P. G. MIRON CONSTRUCTION CO.,
INC., for general construction work at the Oshkosh Centre, is hereby
approved:
CHANGE ORDER NO. G-2
P. J. MIRON CONSTRUCTION CO., INC.
806 Valley Road
Menasha, WI 54952
Amount added: $13,124.07
Purpose: See attached Change Order
BE IT FURTAER RESOLVED by the Common Council of the City of
Oshkosh that the aforementioned Change Order is hereby approved;
a copy of which is attached to this resolution.
BE IT FURTHER RESOLVED that money for this purpose is hereby
appropriated from:
Account No. 331-105 - Oshkosh Downtown Redevelopment
Fund Construction
-36-
SUHMITTED BY
APPROYr"•D
CHANGE Distribution to:
ORDER owNER ❑
ARCHITECT ❑
AIA DOCUMENT G707 CONTRnCTOR ❑
FlELD ❑
OTHER ❑
PROIECT: oshkosh Centre
(name, address) Oshkosh, Wisconsin
RESOIxTPION # 23
CHANGE ORDER NUMBER: G-2
INITIATION DATE: April 19, 1985
TO (Contractor):
ARCHITECTS PROJECT NO: 1383
� P. G. Miron Construction Co.,�c.
II06 Valley Road CONTRACT FOR: General Construction
Menasha, WI 54952 44ork - Entire Project
� � CONTRACT DATE: Dece:nber 20, 1984
You are directed ro make the following changes in this Contract:
1
C
Piling Changes
Benchmark Error Changed
Add $ 2,256.16
Add 12,843.15
3. Provide Handicao Access Showers Add 5,952.00
4. Skywalk Changes to Accomodate Hote1 Design Add 1,595.00
5. Provide UDAG Sign Add 477.76
6. Delete WPS Charges for Relocation of Powe� Line Deduct 10,000.00
Total Change Order - Addition & Deduction - Add $13,124.07
(Proposals attached)
\bt valid unlil signed by bot6 �hc Owner and Architect.
$Ignalure �f Ihe lonvaaor indlcata_ hls agreement hcra'.vi(I-i, ineludin� :. ,:.d�us.L^:r., .^ !M Con!•zc! Sum o! Cpntrar� Tlme.
The original (Contract Sum) (6earar+teed�A4m�imerriC-osH was ........................... 5 3,675, 000.00 ,
Net change by previously authorized Change Orders ................................... $ (535, 571.00) ,
The (Contract Sum) (F,�aarantee�#axrmem{-ast) prior to this Change Order �vas .......... 5 3, 139,429.00 ,
The (Contract Sum) (Ex�ranfeed-,bla�imcmrEest) will be (increased) (decTeas�dr(vnckarrged)
by this Change Order ......................................................... $ 13.124.07 .
The new (Contract Sum) (Cu.acasitoed-.�Aa�in�um-Gosb) induding �his Change Order will be ... 5 3,152,553.07 .
The Contract Time will be (incsea�ad�-{�ec-reased) (unchanged) by ( 0 ) Days.
The Date of Substantial Completion as of thc date of this Change Order therefore is Unchanged
Authorized:
Reinke, Hansche, Last, Inc. P.G. Miron Construction Co. The City of Oshkosh
� 1ioEr[h Main Street aU�l�lalley Road ���1� Church Street
Add ress Add ress Add ress
Oshkosh, WI 54901 h?enasha, WI 54952 Oshkosh, WI 54901
DATE
AIA DOCUA7ENT Gi07 • CHANGE ORDER • APFIL 197fl EDITION • AIA°- • RJ 1978
THE AM[BICAN INSTITUTE OF ARCHIT[CTS, 1735 NEW YORK AVE, N.AN., AN/�SHINGTON, D.G 2000G C701 — 1978
- 36a -
�
: �:
Telephone (4141734-4161
RESOLUTIpN # 23
APR 1 1 19E5
6'. G. MlRON CO(VS�°FiUCTION CO., INC.
CONTRACTORS • CONSTRUCTION MANAGERS • MACHINE ERECTORS • DESIGN SERVICES
P.O. Box 962
Appleton, WI 54912
April 9, 1985
Reinke, Hansche, Last, Inc.
805 N. Main Street
Oshlcosh, FTisconsin 54901
Attention: Mr. David Ma]m�ren
• � • . ���YY.
Dear Sir:
We are su�ctitting to you revised breakdowns per our letter of 3/5/85,
Piling Changes:
1) Change 3/4" cap to 5/8" cap.
2) Sign piles.
3) Six added piles due to obstructions.
4) I�lay charge due to obstructions.
5) Driving less footage than base bid.
6) Re.m�ving obstructions below surface not
shown on plans - Fett EJccavating.
BENCAD7F1FtK CHANGES:
CREDIT OF
ADD OF
ADD OF
ADD OF
CREDIT OF
•�� •
PLUS P. G. MIRON' S MAD:P.GF�'�IQVT FEE
TOTAL PILIlVG CHANGES ----------
1) 7ncreased thickness of pile caps. (54 yds @ 47.52).
2) 7ncreased concrete for �rouring neat (50 yds @ 47.52)
3) Labor to place 104 yards @ 19.10.
4) Iabor to bring trenches up to correct height 2/7 x
1,846.17.
5) 1ldditional n�terial and labor - Fett �ccavating.
PLUS P. G. MIRON'S MANAGII�I�'T FEE
Zt7PAL BIIVQA'�I2FC QIFINC�S ------
- 36b -
$ 400,00
$1,075,25
$ 732.90
$ 571 .73
$1,250,00
$1,232,00
$1,961,88
294.28
$2,256.16
$2,566.08
$2,376,00
$1,986,40
$ 527.48
$3,712,00
$11,167.96
1,675.19
$12,843,15
I
RESOLLlPION # 23
April 9, 1985
RE: OSHICOSH CEN'I'RE
u��• ••.� Ja _ C. ys H
Pelles Johnson $ 366.45
Labor to install $ 49.00
415.45
PLUS P. G. NLIFZON'S N�FINAGII�IE��T FEE 62.31
Zl7PAL SIGN CEIANGE --------------- $ 477.76
Should you have any questions please feel free to call.
Sincerely,
P. G. MIRON CONSTRUCTION
Greg Kippenhan
President
GK/kb
- 36c -
`
�
RFSOLUTION # 23
MAR 1 D 1985
Telephone (4141734-4161
P. G. MIRON CONSTRUCTIOIV CO., INC.
CONTRACTORS • CONSTRUCTION MANAGERS • MACHINE ERECTORS • DESIGN SERVICES
P.O. Box 962 Appleton, W� 54912
March 8, 1985
Fteinke, Hansche, Last, Inc.
805 N. Main Street
Oshkosh, 6Visconsin 54901
Attei�tion: ^1r. Ron AanschP
�: os�cosx c�zE
Dear Ron:
In following uo on your letter dated 2/25/85, in regards to WPS
charges, it seems the city has paid WPS direct for the relocation
of the poc,er lines. Mr. Jim McCabe of H7PS has also inforned me
that there will not be any additional charges.
The $10,000.00, added in Change Order Gl can therefore, apparently,
be eliminated. If you have any questions please feel free to call.
Sincerely,
P G. MIc20N CONS�2UCTI�7
����rl�``�
Greqory Kippenhan
President
GK/kb
- 36d -
'�;
.._.� ,;. ;'. '�4:
Telephone14141734-4161
RESOL�iJTION # 23
F,!F,P 0 2 1985
P. C7. N!{RON CONSTRUCTION CO., INC.
CONTRACTORS • CONSTRUCTION MANAGERS • MACHINE ERECTORS • DESIGN SERVICES
P.O. Box962 Appleton, WI 54912
March 1, 1985
RFl,TIf�, HANSCHE. LAST INC.
805 North Main Street
Oshkosh, Wisconsin 54901
Attn: Mr. David Malmgren
RE: Oshkosh Centre
Project No. 1383
Oshkosh, [tiisconsin
Dear Sir:
As requested by your letter dated January 16, 1985, we are offering
the following for your consideration:
1. Revise showers - Roorns No. 159 and 157 to provide
handicap access - add stun of: $5,952.00
The breakdown is as follaas:
Add partition door width
Add ceramic tile
Add plwnbing and shower stalls
Deduct laminated seats
Deduct toilet roan accessories
P. G. Miron Management Fee
- 36e -
$ 52.00
300.00
4,936.00
(50.00)
(62.00)
$5,176.00
776.00
$5,952.00
RFSOIiJTION # 23
March 1, 1985
REINKE, HANSCEIE, LASP INC.
Paqe II
2. Revise ramp length and safety glazing at skywalk-
Add $1,595.00:
The breakdown is as follows:
Add additional railing
Add additional erection
Add safety glazing
P. G. rLiron Nlanagement Fee
These proposals are sealed for 30 days
decision.
Thank you
Sincerely,
P. G. MIRON CONSTRiJCTION COMPAI�TY, INC.
/��,� i� ��}J.t�L-(:Z.�
C� �
Greg Kippenh
President
GK/cl
- 36f -
$ 735.00
180.00
472.00
$1,387.00
208.00
$1,595.00
Please infozm us of your
� �
� �\ N
n �
r�o c� r
X `— �
� \ �
.�-
�-
�
�
�_
�-- — — -- -- -- s
_ ....---_..._____ ____ _..._ _......__.v._.._...,_....�
; —__ -__ .. .__..,_..._._... �` `';u �
1
..__ ,_,__..._., -_. _._ _
i
t i
� __._._. , ..-� � f
_ _..._.__...... _.. :: ', �
`-----_____.....,_ -.. .___,..._.__. _.. ........:_.._
��
�z
� �
H
�
�
N
O
�
FS
�
N
�
�
N
'x
i-i
�
�
m
�
�
N
W
Wr�
�-J�
�
6�