Loading...
HomeMy WebLinkAbout33344 / 85-23May 2, 1985 (CARRIED LOST #23 LAID OVER RESOLUTION WITHDRAWN ) PURPOSE: CAANGE ORDER NO. G-2 - OSHKOSH CENTRE INITIATED BY: CITY ADMINISTRATION BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order to P. G. MIRON CONSTRUCTION CO., INC., for general construction work at the Oshkosh Centre, is hereby approved: CHANGE ORDER NO. G-2 P. J. MIRON CONSTRUCTION CO., INC. 806 Valley Road Menasha, WI 54952 Amount added: $13,124.07 Purpose: See attached Change Order BE IT FURTAER RESOLVED by the Common Council of the City of Oshkosh that the aforementioned Change Order is hereby approved; a copy of which is attached to this resolution. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Account No. 331-105 - Oshkosh Downtown Redevelopment Fund Construction -36- SUHMITTED BY APPROYr"•D CHANGE Distribution to: ORDER owNER ❑ ARCHITECT ❑ AIA DOCUMENT G707 CONTRnCTOR ❑ FlELD ❑ OTHER ❑ PROIECT: oshkosh Centre (name, address) Oshkosh, Wisconsin RESOIxTPION # 23 CHANGE ORDER NUMBER: G-2 INITIATION DATE: April 19, 1985 TO (Contractor): ARCHITECTS PROJECT NO: 1383 � P. G. Miron Construction Co.,�c. II06 Valley Road CONTRACT FOR: General Construction Menasha, WI 54952 44ork - Entire Project � � CONTRACT DATE: Dece:nber 20, 1984 You are directed ro make the following changes in this Contract: 1 C Piling Changes Benchmark Error Changed Add $ 2,256.16 Add 12,843.15 3. Provide Handicao Access Showers Add 5,952.00 4. Skywalk Changes to Accomodate Hote1 Design Add 1,595.00 5. Provide UDAG Sign Add 477.76 6. Delete WPS Charges for Relocation of Powe� Line Deduct 10,000.00 Total Change Order - Addition & Deduction - Add $13,124.07 (Proposals attached) \bt valid unlil signed by bot6 �hc Owner and Architect. $Ignalure �f Ihe lonvaaor indlcata_ hls agreement hcra'.vi(I-i, ineludin� :. ,:.d�us.L^:r., .^ !M Con!•zc! Sum o! Cpntrar� Tlme. The original (Contract Sum) (6earar+teed�A4m�imerriC-osH was ........................... 5 3,675, 000.00 , Net change by previously authorized Change Orders ................................... $ (535, 571.00) , The (Contract Sum) (F,�aarantee�#axrmem{-ast) prior to this Change Order �vas .......... 5 3, 139,429.00 , The (Contract Sum) (Ex�ranfeed-,bla�imcmrEest) will be (increased) (decTeas�dr(vnckarrged) by this Change Order ......................................................... $ 13.124.07 . The new (Contract Sum) (Cu.acasitoed-.�Aa�in�um-Gosb) induding �his Change Order will be ... 5 3,152,553.07 . The Contract Time will be (incsea�ad�-{�ec-reased) (unchanged) by ( 0 ) Days. The Date of Substantial Completion as of thc date of this Change Order therefore is Unchanged Authorized: Reinke, Hansche, Last, Inc. P.G. Miron Construction Co. The City of Oshkosh � 1ioEr[h Main Street aU�l�lalley Road ���1� Church Street Add ress Add ress Add ress Oshkosh, WI 54901 h?enasha, WI 54952 Oshkosh, WI 54901 DATE AIA DOCUA7ENT Gi07 • CHANGE ORDER • APFIL 197fl EDITION • AIA°- • RJ 1978 THE AM[BICAN INSTITUTE OF ARCHIT[CTS, 1735 NEW YORK AVE, N.AN., AN/�SHINGTON, D.G 2000G C701 — 1978 - 36a - � : �: Telephone (4141734-4161 RESOLUTIpN # 23 APR 1 1 19E5 6'. G. MlRON CO(VS�°FiUCTION CO., INC. CONTRACTORS • CONSTRUCTION MANAGERS • MACHINE ERECTORS • DESIGN SERVICES P.O. Box 962 Appleton, WI 54912 April 9, 1985 Reinke, Hansche, Last, Inc. 805 N. Main Street Oshlcosh, FTisconsin 54901 Attention: Mr. David Ma]m�ren • � • . ���YY. Dear Sir: We are su�ctitting to you revised breakdowns per our letter of 3/5/85, Piling Changes: 1) Change 3/4" cap to 5/8" cap. 2) Sign piles. 3) Six added piles due to obstructions. 4) I�lay charge due to obstructions. 5) Driving less footage than base bid. 6) Re.m�ving obstructions below surface not shown on plans - Fett EJccavating. BENCAD7F1FtK CHANGES: CREDIT OF ADD OF ADD OF ADD OF CREDIT OF •�� • PLUS P. G. MIRON' S MAD:P.GF�'�IQVT FEE TOTAL PILIlVG CHANGES ---------- 1) 7ncreased thickness of pile caps. (54 yds @ 47.52). 2) 7ncreased concrete for �rouring neat (50 yds @ 47.52) 3) Labor to place 104 yards @ 19.10. 4) Iabor to bring trenches up to correct height 2/7 x 1,846.17. 5) 1ldditional n�terial and labor - Fett �ccavating. PLUS P. G. MIRON'S MANAGII�I�'T FEE Zt7PAL BIIVQA'�I2FC QIFINC�S ------ - 36b - $ 400,00 $1,075,25 $ 732.90 $ 571 .73 $1,250,00 $1,232,00 $1,961,88 294.28 $2,256.16 $2,566.08 $2,376,00 $1,986,40 $ 527.48 $3,712,00 $11,167.96 1,675.19 $12,843,15 I RESOLLlPION # 23 April 9, 1985 RE: OSHICOSH CEN'I'RE u��• ••.� Ja _ C. ys H Pelles Johnson $ 366.45 Labor to install $ 49.00 415.45 PLUS P. G. NLIFZON'S N�FINAGII�IE��T FEE 62.31 Zl7PAL SIGN CEIANGE --------------- $ 477.76 Should you have any questions please feel free to call. Sincerely, P. G. MIRON CONSTRUCTION Greg Kippenhan President GK/kb - 36c - ` � RFSOLUTION # 23 MAR 1 D 1985 Telephone (4141734-4161 P. G. MIRON CONSTRUCTIOIV CO., INC. CONTRACTORS • CONSTRUCTION MANAGERS • MACHINE ERECTORS • DESIGN SERVICES P.O. Box 962 Appleton, W� 54912 March 8, 1985 Fteinke, Hansche, Last, Inc. 805 N. Main Street Oshkosh, 6Visconsin 54901 Attei�tion: ^1r. Ron AanschP �: os�cosx c�zE Dear Ron: In following uo on your letter dated 2/25/85, in regards to WPS charges, it seems the city has paid WPS direct for the relocation of the poc,er lines. Mr. Jim McCabe of H7PS has also inforned me that there will not be any additional charges. The $10,000.00, added in Change Order Gl can therefore, apparently, be eliminated. If you have any questions please feel free to call. Sincerely, P G. MIc20N CONS�2UCTI�7 ����rl�``� Greqory Kippenhan President GK/kb - 36d - '�; .._.� ,;. ;'. '�4: Telephone14141734-4161 RESOL�iJTION # 23 F,!F,P 0 2 1985 P. C7. N!{RON CONSTRUCTION CO., INC. CONTRACTORS • CONSTRUCTION MANAGERS • MACHINE ERECTORS • DESIGN SERVICES P.O. Box962 Appleton, WI 54912 March 1, 1985 RFl,TIf�, HANSCHE. LAST INC. 805 North Main Street Oshkosh, Wisconsin 54901 Attn: Mr. David Malmgren RE: Oshkosh Centre Project No. 1383 Oshkosh, [tiisconsin Dear Sir: As requested by your letter dated January 16, 1985, we are offering the following for your consideration: 1. Revise showers - Roorns No. 159 and 157 to provide handicap access - add stun of: $5,952.00 The breakdown is as follaas: Add partition door width Add ceramic tile Add plwnbing and shower stalls Deduct laminated seats Deduct toilet roan accessories P. G. Miron Management Fee - 36e - $ 52.00 300.00 4,936.00 (50.00) (62.00) $5,176.00 776.00 $5,952.00 RFSOIiJTION # 23 March 1, 1985 REINKE, HANSCEIE, LASP INC. Paqe II 2. Revise ramp length and safety glazing at skywalk- Add $1,595.00: The breakdown is as follows: Add additional railing Add additional erection Add safety glazing P. G. rLiron Nlanagement Fee These proposals are sealed for 30 days decision. Thank you Sincerely, P. G. MIRON CONSTRiJCTION COMPAI�TY, INC. /��,� i� ��}J.t�L-(:Z.� C� � Greg Kippenh President GK/cl - 36f - $ 735.00 180.00 472.00 $1,387.00 208.00 $1,595.00 Please infozm us of your � � � �\ N n � r�o c� r X `— � � \ � .�- �- � � �_ �-- — — -- -- -- s _ ....---_..._____ ____ _..._ _......__.v._.._...,_....� ; —__ -__ .. .__..,_..._._... �` `';u � 1 ..__ ,_,__..._., -_. _._ _ i t i � __._._. , ..-� � f _ _..._.__...... _.. :: ', � `-----_____.....,_ -.. .___,..._.__. _.. ........:_.._ �� �z � � H � � N O � FS � N � � N 'x i-i � � m � � N W Wr� �-J� � 6�