HomeMy WebLinkAbout33469 / 85-12I , , July 3, 1985 (CARRIEll PURPOSE: INITIATED BY: LOST LAID OVER il 12 RESOLUTION _ WITHDRAWN ) CHANGE ORllER N0, l, PUBLIC WORKS CONTRACT 85-10 DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order to ROBERT ALBRIGHT CONSTRUCTION for addition to building additions and alterations to Parks, Street/Sanitation and Electrical Depart- ments, is hereby approved: CHANGE ORDER N0. 1 ROBERT ALBRIGHT CONSTRUCTION 1633 Brooks Road Oshkosh, WI 54901 Amount added: $33,891.05 PURPOSE: See attached Change Order BE IT FURTHER RESOLVED by the Common Council of the City of Oshkosh that the aforementioned Change Order is hereby approved; a copy of which is attached to this resolution. from: BE IT FUKTHER RESOLVED that money far this purpose is hereby appropriated Account No. 347-999 -- New Storage Facilities 1985 - 14 - � T0: ROBERT ALBRIGHT CONST. 1633 Brooks Road Oshkosh� Wisconsin 54901 RESOLUTION # 12 C:iAiVGE OBDr."'fi NG. 1 .—'-- DATED: June 25, 1985 Your present contract with the City of Oshkosh� Contract No. 85-10 y is hereby amended and change3 as followss (insert here work and/or materials to be added or eLiminated and the unit and/or lump sum price to be added to or deducted from the contract.) ADD TO BLDG. ADDNS. & ALTERATIONS TO PARKS� STREET/SANITATION & ELECTRICAL DEPTS. JGi. n�il�ii.::.�.,� I�:i:i��F.T TTCTTi�I(` TOTAL ADDED BY CHANGE ORDER �kl TOTAL DEDUCTED BY CHANGE ORDER �kl NET ADDED BY CHANGE ORDER 4F1 Recommended; $34�113.05 222.00 $33�891.05 CITY OF CSHKQ9H By: Director of Public '.�lorks City '.'�nager City C1erk Approved and accepted: Contractcr I certlfy that provision has been made to pay the 1lability that will accrue to the City of Oshkosh, 411sconsin, under the within Change Order. Approved as to forma City Attorney - 14a - Comptroller , , RESOLUTION # 12 CHANGE ORDER �kl - CONTRACT 85-10 Electrical & Sign Dept. alterations @ 926 Dempsev Trail 1. Furnish & install 2 coats of Paint (dark color) from floor to 9' above first floor. ADD $560.00 Sanitation Gara�e @ 639 Witzel Avenue 1. Provide interior liner panel on al1 wa11s 2. Provide a11 labor� materials & taxes to connect the b1dg. sanitary sewer line into the existing city garage sanitary sewer in lieu of the storm sewer line extending out of the last addition to the city garage, This change is required by the Plumbing Inspector. Park Dept. Buildin� Addn. @ 805 Witzel Avenue ADD I• 11 1. Deepen & modify foundations as necessary to circumvent the landfiil and bear on the clay subgrade. Changes are to include but not limited to: A. Addn. excavation & backfill; B. Dewatering of excavations as required; C. Addn. concrete & rebar required; D. Provide foundation walls under a11 masonry wa11s; E. A11 labor� materials, & taxes. ADD 2. Provide 4" PSK fiberglass wa11 insulation & 6" PSK roof insulation in lieu of 2" in room A104. 3. Provide interior metal Iiner panel on the exterior walLs of room A104. 4. To offset a portion of the cost of change to Sanitation (2.)� replace the concrete base for the exterior oil storage tank w/a concrete saddle over its' top and eliminate two hold down straps. Also eliminate one of magnesium anodes, TOTAL ADDED BY THIS CHANGE ORDER TOTAL DEDUCTED BY THIS CHANGE ORDER TOTAL - CHANGE ORDER �pl NEW CONTRACT TOTAL INCLUDING CHANGE ORDER �tl. $440�434.05 — 14b— ADD ADD DEDUCT $5,400.00 $897.00 $19�216.05 $3,240.00 $4,800.00 $222.00 $34,113.05 - $ 222.00 $33,891.05 ♦ , .� � � k O p� o � N � � W � 2 � (�D � � � rr0 � x � � � � u�, � N � vy �� �..�' � � � � � � � �� n � � �� x �