HomeMy WebLinkAbout33492 / 85-16�!N
TOs ROBERT ALBRIGHT CONST.
1633 Brooks Road
Oshkosh� Wisconsin 54901
RESOLUTION # 16 ; �
C:iP c1GE Gr3D�i IdG . 1
D9TED: June 25� 1985
Your present contract with the Clty of Oshkoshs Contract No. 85-10 �
is hereby amended and changed as follows:
(lnsert here work and/or naterials to be added or eliniiiated and
the unit and/or lunp sun rorice to be added to or deducted fro� the
conLract,)
ADD TO BLDG. ADDNS. & ALTERATIONS TO PARKS� STREET/SANITATION & ELECTRICAL
DEPTS.
SEE ATTACHED ITEhff ZED LISTING.
TOTAL ADDED BY CHANGE ORDER �il
TOTAL DEDUCTED �3Y CHANGE ORDER �kl
NET ADDED BY CF�ANGE ORDER �il
Reconmended;
Director of Pub11c :�Iorks
$34�113.05
222.00
$33,891.05
CITY GF CS.'.KQ9E
By:
Citj� :`larager
City C1erK
Approved an3 accepted:
ontrac�cr
I certlfy that provision has been made to pay the liability that
c�rill accrue to the City of Oshkosh, 4Jisconsin, ur.der the within
Change Order.
Approved as to forms
City Attorney
- 24a -
� Co�ptroller
J
RESOLIPPION # 16
CHANGE ORDGR 1k1 - CONTRACT 85-10
Elec'ricai & Sien Dept. alterations @ 926 Dempsey Trail
1, Furnish & install 2 coats of paint (dark color) from
floor to 9' above first floor. ADD $560.00
Sanitation Garage @ 639 Witzel Avenue
1. Provide interior liner panel on a11 wa11s
2. Provide all labort materials & taxes to connect
the bldg. sanitary sewer line inCO the existing
city garage saniLary sewer in lieu of the storm
sewer line extending out of the last addition to
the city garage. This change is required by the
Plumbing Inspector.
Park Dept. Building Addn. @ 805 Witzel Avenue
ADD
ADD
1. Deepen & modify foundations as necessary to circumvent
the landfiil and bear on the clay subgrade. Changes are
to include but not limited to:
A. Addn. excavation & backfill;
B. Dewatering of excavations as required;
C. Addn, concretg & xebar required;
D. Provide foundation walls under al1 masonry wa11s;
E. A11 labcr� materials� & taxes. ADD
2. Prcvide 4" PSK fiberglass wa11 insulation &
6" PSK roof insulation in lieu of 2" in
room A104.
3. Provide interior�metal Iiner panel on the
exterior wa11s of room A104.
4. To offset a portion of the cost of change to
Sanitation (2.), replace the concrete base for
the exterior oil storage tank w/a concrete saddle
�. over its' top and eliminate two hold down straps.
��� Also eliminate one of magnesium anodes.
TOTAL ADDED BY THIS CFiAnG� ORDER
TOT,�L DEDOCTED BY THIS CHANGE ORDER
TOTAL - CHAPiGE ORDER 4�1
NEid COtiTRACT TOTAL INCLCIDING CHANGE ORDEF 4i1. $440,434.05
- 24b -
► ��
ADD
DEDUCT
$5,400.00
$897.00
$19,216.05
$3,240.00
$4,800.00
$222.00
$34�113.G5
- $ 222.00
$33�891.05
ib
July 18,11985
(CARkIED _
PURPOSE
INITIATED BY:
LOST
LA1D OVER
Ik 16 RESOLUTION
_ WITHDRAWN )
CHANGE ORDER N0. 1, PUBLIC WORKS CONTRACT 85-10
DEPARTMENT OF PUBLIC WORKS
BE IT RESOLVED by the Common Council of the City of Oshkosh that the
following Change Order to ROBERT ALBRIGHT COASTRLCTION for addition to building
additions and alterations to Parks, Street/Sanitation and Electrical Depart-
ments, is hereby approved:
CHANGE QFDF.2 NQ. 1
ROAERT ALBRIGHT CONSTRUCTION
1633 Brooks Road
Oshkosh, WI 54901
Amount added> $33,891.05
PORPOSE: See attached Chacrge Order
BE IT FURTHER-RESOLVED by the Common Council of the City of Oshkesh that
the aforementioned Change Order is hereby approved; a copy of which is attached
to this resolution.�
from:
BE IT FL'RTHER RESOLVED that money for this purpose is hereby appropriated
Account No. 347-999 -- New Storage Facilities 1985
- 24-
Sl18YITTL�D BY
APPROVED
� �, �
r r ( r' �
�G ` 1' �G
n ��
c W
� �
� ��
� �
�
_ �
I� �
\�,
��
��
N
r
c� 3
ao
A �
A �+
�-+ O
m z
p ..
zao
o �c o
ro ro v
� � �
.� o�
c"� c"�
o �
7 d
c'F �
d �
n
�+ o
-s
m n
cn m
� -5
o z
0
�
v
�
Q
[�
E
O
�
�
N
�
m
N
�
rn
LJ�d
��
��:r.
,P�.r
`t d