Loading...
HomeMy WebLinkAbout33492 / 85-16�!N TOs ROBERT ALBRIGHT CONST. 1633 Brooks Road Oshkosh� Wisconsin 54901 RESOLUTION # 16 ; � C:iP c1GE Gr3D�i IdG . 1 D9TED: June 25� 1985 Your present contract with the Clty of Oshkoshs Contract No. 85-10 � is hereby amended and changed as follows: (lnsert here work and/or naterials to be added or eliniiiated and the unit and/or lunp sun rorice to be added to or deducted fro� the conLract,) ADD TO BLDG. ADDNS. & ALTERATIONS TO PARKS� STREET/SANITATION & ELECTRICAL DEPTS. SEE ATTACHED ITEhff ZED LISTING. TOTAL ADDED BY CHANGE ORDER �il TOTAL DEDUCTED �3Y CHANGE ORDER �kl NET ADDED BY CF�ANGE ORDER �il Reconmended; Director of Pub11c :�Iorks $34�113.05 222.00 $33,891.05 CITY GF CS.'.KQ9E By: Citj� :`larager City C1erK Approved an3 accepted: ontrac�cr I certlfy that provision has been made to pay the liability that c�rill accrue to the City of Oshkosh, 4Jisconsin, ur.der the within Change Order. Approved as to forms City Attorney - 24a - � Co�ptroller J RESOLIPPION # 16 CHANGE ORDGR 1k1 - CONTRACT 85-10 Elec'ricai & Sien Dept. alterations @ 926 Dempsey Trail 1, Furnish & install 2 coats of paint (dark color) from floor to 9' above first floor. ADD $560.00 Sanitation Garage @ 639 Witzel Avenue 1. Provide interior liner panel on a11 wa11s 2. Provide all labort materials & taxes to connect the bldg. sanitary sewer line inCO the existing city garage saniLary sewer in lieu of the storm sewer line extending out of the last addition to the city garage. This change is required by the Plumbing Inspector. Park Dept. Building Addn. @ 805 Witzel Avenue ADD ADD 1. Deepen & modify foundations as necessary to circumvent the landfiil and bear on the clay subgrade. Changes are to include but not limited to: A. Addn. excavation & backfill; B. Dewatering of excavations as required; C. Addn, concretg & xebar required; D. Provide foundation walls under al1 masonry wa11s; E. A11 labcr� materials� & taxes. ADD 2. Prcvide 4" PSK fiberglass wa11 insulation & 6" PSK roof insulation in lieu of 2" in room A104. 3. Provide interior�metal Iiner panel on the exterior wa11s of room A104. 4. To offset a portion of the cost of change to Sanitation (2.), replace the concrete base for the exterior oil storage tank w/a concrete saddle �. over its' top and eliminate two hold down straps. ��� Also eliminate one of magnesium anodes. TOTAL ADDED BY THIS CFiAnG� ORDER TOT,�L DEDOCTED BY THIS CHANGE ORDER TOTAL - CHAPiGE ORDER 4�1 NEid COtiTRACT TOTAL INCLCIDING CHANGE ORDEF 4i1. $440,434.05 - 24b - ► �� ADD DEDUCT $5,400.00 $897.00 $19,216.05 $3,240.00 $4,800.00 $222.00 $34�113.G5 - $ 222.00 $33�891.05 ib July 18,11985 (CARkIED _ PURPOSE INITIATED BY: LOST LA1D OVER Ik 16 RESOLUTION _ WITHDRAWN ) CHANGE ORDER N0. 1, PUBLIC WORKS CONTRACT 85-10 DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order to ROBERT ALBRIGHT COASTRLCTION for addition to building additions and alterations to Parks, Street/Sanitation and Electrical Depart- ments, is hereby approved: CHANGE QFDF.2 NQ. 1 ROAERT ALBRIGHT CONSTRUCTION 1633 Brooks Road Oshkosh, WI 54901 Amount added> $33,891.05 PORPOSE: See attached Chacrge Order BE IT FURTHER-RESOLVED by the Common Council of the City of Oshkesh that the aforementioned Change Order is hereby approved; a copy of which is attached to this resolution.� from: BE IT FL'RTHER RESOLVED that money for this purpose is hereby appropriated Account No. 347-999 -- New Storage Facilities 1985 - 24- Sl18YITTL�D BY APPROVED � �, � r r ( r' � �G ` 1' �G n �� c W � � � �� � � � _ � I� � \�, �� �� N r c� 3 ao A � A �+ �-+ O m z p .. zao o �c o ro ro v � � � .� o� c"� c"� o � 7 d c'F � d � n �+ o -s m n cn m � -5 o z 0 � v � Q [� E O � � N � m N � rn LJ�d �� ��:r. ,P�.r `t d