BID FOR PUBLIC WORKS CONTRACT N0. 85-13
DEPARTMENT OF PUBLIC WORKS
RESOLUTION
WITHDRAWN )
WHEREAS, the City of Oshkosh has heretofore advertised for bids for
Public Works Contract 1k85-13 for the City of Oshkosh Public Works Department
for asphalt parking lot improvements and storm sewer work; and
WHEREAS, upon the opening and tabulation of bids, it appears that the
following is the most advantageous bid:
JIM FISCHER, INC.
407 N. Casaloma Drive
Appleton, WI 54915
Total Bid: $43,131.25
NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh
that the said bid is hereby accepted and the proper City officials are hereby
authorized and directed to enter into the appropriate agreement for the purpose
of same, all according to plans, specifications, and bid on file. Money for this
purpose is hereby appropriated from:
Account No. 321-519 - CDBG - 9th Ave. Parking Lot
Account No. 339-989 - Special Assessments - Other
SUBMITTED BY
APPROUED
-23-
J
ti
� �
BID OPENINC: August 7� 1985
10:30 A.M.� C.D.S.T.
1. 1�280 sq.yds. pavemen[ removel�
per square yard
2. Furnlsh 6 Snstall 305 tons cxushed s[oae
base course, per ton
3. Approx. 245 tons 3" ihick bltt�inous
pavement� per con _
4. Approx. 340 Lin.ft. std. 30" concrete cur6
d gutCer� per lln.ft.
5. Approx. 105 1in.ft. 6" curb sec[Son,
per lineal foo[
6. Approx. 1�590 sq.ft. 5�� toncrete sideweLk�
per square foo[
7. Approx. 190 sq.f[. 6" concre[e sidewalk
6 dziveway� per sq.f[.
8. Approx. 890 sq.ft. bxick pavers� per sq.f[,
9. Furnish 6 install 2 brick re[aining walls,
L�p s�
10. ExcavatSon 6 placemen[ of black dlrt
for pLen[ing erees� Limmp st�
11.�COnstruct 5 new staaderd inle u�
as specified, eech •
12. Adjust 2 stozm menholes as specified�
eech
. Futnish 6 install 3.6 ver0.f[. std.s[ozm
F4i in 1 1¢a[SOn� per vert.ft, -
14. Furnish 6 Lnscall 135 lia.ft. 8" Inlet
Lead� per 11nea1 foot
15. Fuinish 6 install 175 lin.ft. 6" Scorm
Drain� per lin.ft. '
16. Approx. 7 std, light beses, each
GRAND TOTAL - ITEMS 1 THROUGH 16
COMPLETE -
BEGIN - 10 deys eftez everd; days of st
BID BOND/CERTIFIED CHECK
JIM FISCHER� INC.
407 N. Casaloma Drive
Appleton� NI 54915
ONIT PRICE
$2.:<�
$4.75
$32.50
$10.25
$9.50
$3.75
$2.25
$5.50
$550.00 I
$125.00
$175.00
$ 16.00
$ 13.50
$500.00
$43�131.25
TOTAL
5 z,e50.0u
$ 1�448.75
$ 7�962.50
$ 3,485.00
$ 997.50
$ 2,782.50
$ 42J.50
$ 4,895.00
$ 6�000.00
$ 600.00
$ 2�750.00
$ 250.00
$ 630.00
$ 2�160.00
$ 2,362.50
$ 3�500.00
_ z� _
RFSOLUPION # 15
BID TABULATION
CONTRACT 85-13
ASPHALT PARKING LdC II�ROVEMENTS 6 STORM SEWER WORK
BIDDERS
NOATHEAST ASPHALT INC.
P.O. Box 1513
Fond du Lac� 6:I 54935
IIN?T PR10E TdCAL
$1.50 $ 1�920.00
$7.58 $ 2�311.90 � -
$28.10 $ 6�884.50
$12.50 $ 4,250.00
$9.00 $ 945.00
$3.22 S 5�119.80
$3.44 $ fi53.60
$7.90 $ 7�031.00
- $ 5�000.00
$ 700.00
$410.00 $ 2�050.00
$100.00 $ 200.00
$130.00 S 468.00
$17.00 $ 2,295.00
$16.00 $.2�800.00
$250.00 $ 1,750.00
$44,378.80
BID BOND
�
f
c� n
h �
�G C
N
n c" c+
� � �
F� .
�`' 1O
W
cn
�
�
�
� 3
ao
��
.ZJ r-�
� O
m z
o••
a o
� o
N �
�
(/� Z ➢
�o�
o �
� � �
N i
F w�
m�a
� v
d �
�i
� �
in c
r�
o .-•
�+ c�
.-� �
3 0
��
��
O N
<
� O
N �
7 c-F
c-F �
A�
d n
� C+
d
�
m
N
�
v�
��
i�
��
�..'!
�