PURPOSE: CHANGE ORDER N0. G-7, OSHKOSH CENTRE PROJECT
INITIATED BY: CITY ADMINISTRATION
BE IT RESOLVED by the Common Council of the City of Oshkosh
that the following Change Order to P. G. MIRON CONSTRUCTION C0.
regarding the Oshkosh Centre project, is hereby approved:
CHANGE ORDER NO. G-7
P. G. MIRON CONSTRUCTION CO.
806 Valley Road
Menasha, WI 54952
Amount added: $604.14
PURPOSE: See attached Change Order
BE IT FURTHER RESOLVED by the Common Council of the City of
Oshkosh that the aforementioned Change Order is hereby approved; a
copy of which is attached to this resolution.
BE IT FURTHER RESOLVED that money for this purpose is hereby
appropriated from:
Account No. 331-406 - Oshkosh Downtown Redevelopment
Contracts Payable
SUBMITTED BY
APPRO�'ED
-24-
CHAi�1GE
ORDER
AIA DOCUMENT G707
Dis�nbu�ion to:
OWN[R ❑
ARCHITECT �1
CONTRACTOR ❑
FIELD ❑
OTHER ❑
PROJECT: Oshkosh Centre
(name, address) Oshkosh, Wisconsin
TO (Contractor):
�P. G. Miron Const.
806 Valley Road
Menasha, WI 54952
�
RESOLUTION # 16
CHANGE ORDER NUMBER: G-7
INITIATION DATE: July 26, 1985
� ARCHITECT'S PROJECT NO: 1383
Co. CONTRACT FOR: General Project Work -
Entire Project
JCONTRACT DATE: �cember 20, 1984
You are directed to make the following changes in this Conhact
1. Remove existing buried 16" waterpipe
incerfering with placement of Pile,NO. 24.
And $216.48
2. Add concrete grade beam at column line N-6.
Two piles to be driven at that location
�could not be driven due to obstructions.
Piles were relocated, but grade.beam was
required between two piles to support�
column above. -
Add 387.66
i hereby ceY;!fY !h2t `.hE �e! [SSaly provi510115
have�j��},rn?��e t:, ra_r ?r�� �iat:iliiy which will Add 5604.14
accrue under this ccrt�a:t.
(Proposal attached)
°------------- --`--- ----=------°------
CiN Comptr011er
Not valid until signed by botl� Ihe Owner and Ar[hi�ec�.
Signatore ot the Contractor indicates his agreemem nerewitn, induding xny ao�us;men[ m.ne �on:rac. �um or �enrace Time.
The original (Contract Sum) (Evararrteed-IvtaAirnvm{–ost) was ........... ....... ......... $
Net change by pre��iously authorized Change Orders ...................... .... ......... $
The iContrad Sum) (Evaranteed-klaximvrtrEast) prior to this Change Order was .......... $
The (Contract Sum) (GvaranteecrktaxinrvrrrE-ost) will be (increased) (�eEreased�(emeMartged)
by this Change Order ......................................................... S
The new (Contract Sum) (Guarant�a� ^�axi¢wmCost) induding this Change Order will be ... $
The Contract Time will be frrrctease�-Edeereaeed) (unchanged) by
3,675,000.00
(521,497.75)
3,153,502.25
604.14 ,
3,154,106.39 ,
( 0 ) Days.
The Date of Substantial Completion as of the date of [his Change Order therefore is March 7, 1986
Authorized:
Reinke, Hansche, Last, Inc. P. G. Miron Const. Co. The City of Oshkosh
'���l�o�th Main Street ��'��'�a�ey Road ���E�hurch Street
Address Address Address
Oshkosh, WI 54901 Menasha, WI 54952 Oshkosh, 47I 54901
BY' , S /"' �,""_"� BY
D:\T[
UEIIl�
�
6Y
DATE
:AI9 DOCUMkNT Gi01 • CHANGE OFDEH • :1PRIL 1978 EDITION • AIA� • ���� 1'�':°�.
,..!:AVLRIC_AVI?15TITUTEOFARCHITEC75.1-S�.VUV'10RK.AVE N.N'..A1'A�Hi�AGTON.fI.[___ ... G701-1y7I1
— 24a —
�.
_r
rz�;..
P G
RESOLUTION # 16
11.i.'{ '.. _ �_.
Telephone (4141734-4161
P. G. MIRON COI��STRUCTION CO., INC.
CONTRACTORS • CONSTRUCTION MANAGERS • MACHINE ERECTORS • DESIGN SERVICES
� P.O. Box962 Appleton, WI 54912
May 20, 1985
Reinke, iiar �c;:e, Last, Ii c.
805 North b:._,in Stre_t
Oshkosh, Wisconsin 54901
RE: Oshkosh Centre - Change Orders
Dear Sir:
Please see the enclosed for extra it�ns which we are suLznitting for change
order:
1. R�iove 16" waterpipe (84-621-B):
I.abor
Insurance and Payroll
Frn i i �.ment
P. G. rLiron Management Fee
Total Change
$102.31
40.93
45.00
$188.24
2E.24
$216.45
2. Add additional concrete wall at col�n line N-6 (84-621D):
I,�-i}�or $ 99.82
Insurance and Payroll 39.93
Ecpailanent 2 . 50
Valley Ready Mi�:ed Concrete 2L53
Viking Steel 173.31
$337.09
P. G. Miron Management Fee 50.57
Total Change $387.66
Total Amount Due $604.14
If you have any questions, please feel free to contact r.ie.
Sincerely,
P. Gj MIRON STRUC7'ION COMPA�'�7Y, INC.
1. ���((///
� ; :-. ' �
/�� `�`��
Gre9 IQiPPen17�?
President `
GK/cl
Enclosures (9)
- 24b -
t_..�._.,__....._.____ .,_._.__..
� __..._..�._.�_._........ ... .
i
� . ..:..4'..
c��D c�3 �n
c n o -s �
�-+ in � -� o a
� c � .-� �. �
N � O (D c�
c'� C c-r m z � ro
.J � o .. �-+
� � � .. o
� , V" n a
(a�• , � °o �
� ��
� w �, -� z
�= cn o
�' � �
C� i
V
�
0
"_ 3
�
O
�
n
N
�
h
�
�
A
�
�
�
rn
- o
t td
i y
�r
�
�a1
�