HomeMy WebLinkAbout33551 / 85-16August 15, 1985 (CARRIED LOST LAID OVER #16 RESOLUTION WITHDRAWN ) PURPOSE: CHANGE ORDER N0. G-7, OSHKOSH CENTRE PROJECT INITIATED BY: CITY ADMINISTRATION BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order to P. G. MIRON CONSTRUCTION C0. regarding the Oshkosh Centre project, is hereby approved: CHANGE ORDER NO. G-7 P. G. MIRON CONSTRUCTION CO. 806 Valley Road Menasha, WI 54952 Amount added: $604.14 PURPOSE: See attached Change Order BE IT FURTHER RESOLVED by the Common Council of the City of Oshkosh that the aforementioned Change Order is hereby approved; a copy of which is attached to this resolution. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Account No. 331-406 - Oshkosh Downtown Redevelopment Contracts Payable SUBMITTED BY APPRO�'ED -24- CHAi�1GE ORDER AIA DOCUMENT G707 Dis�nbu�ion to: OWN[R ❑ ARCHITECT �1 CONTRACTOR ❑ FIELD ❑ OTHER ❑ PROJECT: Oshkosh Centre (name, address) Oshkosh, Wisconsin TO (Contractor): �P. G. Miron Const. 806 Valley Road Menasha, WI 54952 � RESOLUTION # 16 CHANGE ORDER NUMBER: G-7 INITIATION DATE: July 26, 1985 � ARCHITECT'S PROJECT NO: 1383 Co. CONTRACT FOR: General Project Work - Entire Project JCONTRACT DATE: �cember 20, 1984 You are directed to make the following changes in this Conhact 1. Remove existing buried 16" waterpipe incerfering with placement of Pile,NO. 24. And $216.48 2. Add concrete grade beam at column line N-6. Two piles to be driven at that location �could not be driven due to obstructions. Piles were relocated, but grade.beam was required between two piles to support� column above. - Add 387.66 i hereby ceY;!fY !h2t `.hE �e! [SSaly provi510115 have�j��},rn?��e t:, ra_r ?r�� �iat:iliiy which will Add 5604.14 accrue under this ccrt�a:t. (Proposal attached) °------------- --`--- ----=------°------ CiN Comptr011er Not valid until signed by botl� Ihe Owner and Ar[hi�ec�. Signatore ot the Contractor indicates his agreemem nerewitn, induding xny ao�us;men[ m.ne �on:rac. �um or �enrace Time. The original (Contract Sum) (Evararrteed-IvtaAirnvm{–ost) was ........... ....... ......... $ Net change by pre��iously authorized Change Orders ...................... .... ......... $ The iContrad Sum) (Evaranteed-klaximvrtrEast) prior to this Change Order was .......... $ The (Contract Sum) (GvaranteecrktaxinrvrrrE-ost) will be (increased) (�eEreased�(emeMartged) by this Change Order ......................................................... S The new (Contract Sum) (Guarant�a� ^�axi¢wmCost) induding this Change Order will be ... $ The Contract Time will be frrrctease�-Edeereaeed) (unchanged) by 3,675,000.00 (521,497.75) 3,153,502.25 604.14 , 3,154,106.39 , ( 0 ) Days. The Date of Substantial Completion as of the date of [his Change Order therefore is March 7, 1986 Authorized: Reinke, Hansche, Last, Inc. P. G. Miron Const. Co. The City of Oshkosh '���l�o�th Main Street ��'��'�a�ey Road ���E�hurch Street Address Address Address Oshkosh, WI 54901 Menasha, WI 54952 Oshkosh, 47I 54901 BY' , S /"' �,""_"� BY D:\T[ UEIIl� � 6Y DATE :AI9 DOCUMkNT Gi01 • CHANGE OFDEH • :1PRIL 1978 EDITION • AIA� • ���� 1'�':°�. ,..!:AVLRIC_AVI?15TITUTEOFARCHITEC75.1-S�.VUV'10RK.AVE N.N'..A1'A�Hi�AGTON.fI.[___ ... G701-1y7I1 — 24a — �. _r rz�;.. P G RESOLUTION # 16 11.i.'{ '.. _ �_. Telephone (4141734-4161 P. G. MIRON COI��STRUCTION CO., INC. CONTRACTORS • CONSTRUCTION MANAGERS • MACHINE ERECTORS • DESIGN SERVICES � P.O. Box962 Appleton, WI 54912 May 20, 1985 Reinke, iiar �c;:e, Last, Ii c. 805 North b:._,in Stre_t Oshkosh, Wisconsin 54901 RE: Oshkosh Centre - Change Orders Dear Sir: Please see the enclosed for extra it�ns which we are suLznitting for change order: 1. R�iove 16" waterpipe (84-621-B): I.abor Insurance and Payroll Frn i i �.ment P. G. rLiron Management Fee Total Change $102.31 40.93 45.00 $188.24 2E.24 $216.45 2. Add additional concrete wall at col�n line N-6 (84-621D): I,�-i}�or $ 99.82 Insurance and Payroll 39.93 Ecpailanent 2 . 50 Valley Ready Mi�:ed Concrete 2L53 Viking Steel 173.31 $337.09 P. G. Miron Management Fee 50.57 Total Change $387.66 Total Amount Due $604.14 If you have any questions, please feel free to contact r.ie. Sincerely, P. Gj MIRON STRUC7'ION COMPA�'�7Y, INC. 1. ���((/// � ; :-. ' � /�� `�`�� Gre9 IQiPPen17�? President ` GK/cl Enclosures (9) - 24b - t_..�._.,__....._.____ .,_._.__.. � __..._..�._.�_._........ ... . i � . ..:..4'.. c��D c�3 �n c n o -s � �-+ in � -� o a � c � .-� �. � N � O (D c� c'� C c-r m z � ro .J � o .. �-+ � � � .. o � , V" n a (a�• , � °o � � �� � w �, -� z �= cn o �' � � C� i V � 0 "_ 3 � O � n N � h � � A � � � rn - o t td i y �r � �a1 �