HomeMy WebLinkAbout33614 / 85-100
October 3, 1985 #10 RESOLUTION
(CARRIED LOST LAID OVER WITHDRAWN )
PURPOSE: CHANGE ORDEF - OSHKOSH CENTRE PROJECT
INITIATED BY: CITY ADMINISTRATION
BE IT RF:fi�LVF;D by the Common Council of the City of Oshkosh
that the following Change Orders Lo P.G. MIROIv CONSTRtiCTION CO.,
INC. for additional mutc-rial for tne convention center, is hereby
approved:
CHANGE URDE;R G-10
P.G. MIRON CONSTRUCTION CO.� INC.
806 Valley Road
Menasha, WI 54952
Arnount added: $6,075.14
PURPOSE: (Additional structural steel)
See attached Change Order
CHANGE ORDER G-11
P. G. MIFON CONSTRUCTION CO., INC.
806 Valley Road
Menasha, WI 54952
Amount added: $3,584.10
PURPOSE: (Material & labor - roof drain piping)
See attacned Change Order
BE IT FURTHER RESOLVED by the Common Council of the City of
Gshkosh that t:he aforementioned Change Order is hereby approvd; a
copy of which is attached to this resolution.
BE IT FURTHER RESOLVED that money f�r tYsis purpose is hereby
appropriated from:
Account No. 331-105 - Centre Redevelopment -
Construction.
- 13 -
SU�L�ITTED BY
pppap'; ,^�
CHANGE
ORDER
AIA DOCUMENT G707
PROIECT: Oshkosh Centre
(name, address) Oshkosh, Wisconsin
Distribution to:
OWNER ❑
ARCHIfECT ❑
CONTRACTOR ❑
FIELD ❑
OTHER ❑
TO (Contractor):
�P. G. Miron Construction Co
806 Valley Road
Menasha, WI 54952
�
RESOLUTION # 10
CHANGE ORDER NUMBER: G-lo
INITIATION DATE: September 17, 1985
'� ARCHITECT'S PROJECT NO: 1383
,Inc.l
CONTRACT FOR:General Project Work -
Entire Project
� CO NTRACT DATE: December 20, 1984
You are directed to make the following changes in this Contract:
Provide additional structural steel to frame
around roof penetrations.
(Proposal Attached)
Add $6,075.14
Not valid until signed by bodi the O�ener and Architect.
Signa[ure ot Ihe Contra<tor indica[es his agreemen[ herewith, induding any adjustment in the Contract Sum or Con[racl Time.
The original (Contrac[ Sum) (fmarenteed-M:ncimnm-Eost) was .. .. . .... . . .. .... .... .. .... $
Net change by previously authorized Change Orders ................................... $
The (Contrad Sum) (Gu;�ramee�MaxirrttmrEost}prior ro this Change Order was .......... $
The (Contrzct Sum) fGuarmHeec�h4emirmnn{-g� will be (increased) fdecreasedtfutrtfiart�d)
by this Change Order ......................................................... $
The new (Contract Sum) (�u,u.uueocLb4aziuuK»Eest) induding this Ghange Order will be .. .$
The Contract Time will be 4+ac;eased}-{deer�sed) (unchanged) by
3,675,000.00
(505,893.61)
3,169,106.39
6,075.14
3,175,181.53 ,
( � ) Days.
The Date of Substantial Completion as of the date of [his Change Order Iherefore is March 28, 1986
Reinke, Hansche, Last, Inc.
A�St�IIT� rth Main Street
Address
Oshkosh, WI 54901
Authorized:
P. G. Miron Construction Co. The City of Oshkosh
�U6��%a�l�e�y Road
Address
Menasha, WI 54952
AIA DOCUAIFNT C701 • CHANGE OFDEft • AFRIL l9'8 EDIIION • AIA'� • OO 1WA
THE AMERICAN WSTITU7E Of ARCHITEC75, 1735 NE\V YOR4: A\�E, N.IV., VJASHWGTON, D.0 20UOG
- 13a -
��ti~��5 Church Street
Address
Oshkosh, Wi 54901
RESOLUTION # 10
AUG 2 2 1985
Telephone 14�4) 734-4161
P. G. MIRON CONSTRUCTION CO., INC.
P G CONTRACTORS • CONSTRUCTION MANAGERS • MACHINE ERECTORS • DESIGN SERVICES
P.O. Box962 Appleton, WI 54912
August 22, 1985
Reinke, Hansche, Last, Inc.
805 N. N1ain Street
Oshkosh, Wisconsin 54901
RE: OSHKOSH CENTRE
Gentlesm_n :
Tne following is a breakdown of the costs incurred to fui-nish and
install the framing requised for roof penetrations.
Appleton Structural Steel
�� ��
m
P. G. Mison Iabor
�� ��
m
Insurance & Payroll F�cpense
+P. G. Mison's Management Fee
TCJTAL ---------------------
$146.56
48.96
$3,150.00
84.00
1,775.00
195.52
78.21
5,282.73
792.41
$6,075.14
Please issue a change order in the above amount at your earliest
convenience. Should you have any questions please feel free to call.
Sincerely,
P�.� G. MIRON CONS'I'RI.K.'I'ION
i a
���`� � / �,
� ��,yt �
Greg Kippenh �
President
GK/kb
encs.
- 13b -
CHANGE o;st,;e�,;o� �o:
ORDER owNER ❑
ARCHIYECT ❑
AIA DOCUMENT G707 CONTRAC70R ❑
FIELD ❑
OTHER ❑
PROIECT: Oshkosh Centre
(name,address) Oshkosh, Wisconsin
TO (Contractor):
�
�
P. G. Miron Construction Co
806 Valley Road
Menasha, WI 54952
RESOLUTION # 10
SEP 2 3 1985
CHANGE ORDER NUMBER: G-11
INITIATION DATE: September 17, 1985
ARCHITECT'S PROJECT NO: 1383
,Inc
CONTRACT FOR: General Project Work -
Entire Project
JCONTRACT DATE December 20, 1984
You are directed to make Ihe following changes in this Contract:
Additional material and labor to renovate
roof drain piping.
(Proposal attached)
Add $3,554.10
Not valid until signed by bodi the O�aner and Architect.
SignaW re ot [he Contractor indicares his agreement herewith, Induding any adjus[men[ fn the Contract Sum or Contract Tlme.
The original (Contract Sum) (C�rasanteed-�iiakiwaiuu�osq was ........................... $
Net change by previously authorized Change Orders .. .. ....... .. . .. ... ....... ......... $
The (Contract Sum) (Gea+aMeec#A4a+crmw�L-ost� prior to this Change Order was ... ....... $
The (Contract Sum) (E'marxinfeed-himrrt�errrEest) will be (increased) (decrc�sed��uaFhaaged)
by [his Change Order ......................................................... 8
The new (Con�ract Sumj (6t+ar�nEee��kk�:r�wr�{.osH induding this Change Order will be .. .$
The Contract Time will be{i+jereased}{decfe�r;ed) (unchanged) by
3,675,000.00
(499,818.47)
3,175,181.53
3,584.10 .
3,178,765.63 .
( 0 ) Days.
The Date of Substan[ial Comple[ion as of the date of this Change Order therefore is March 28, 1986 .
Reinke, Hansche, Last, Inc.
`�5����orth Main Street
Address
Oshkosh, WI 54901
RV �` . /�/�`(/ihhlJiJ
�—
onTE 4��3�B.i
P.G. Miron Construction Co.
��T�a�iey Road
Address
Menasha, WZ 54952
6Y
o�TE �-
AIA DOCUMENT G707 • CHANGE ORDCft • APRIL 1978 EDITION • AIA�' • C� �9;8
THE AM[RIGAN WSTITUTE OF ARCHITECTS, 1735 KEVV YORK AA'E, N.�N., WASHINGTON, D.C. ?000G
- 13c -
Authorized:
The City of Oshkosh
�217E Church Street
Oshkosh, WI 54901
�
:� �
,
RESOLUI'ION # lOuG 2 2 �
R
Telephone14141734-4161
P. G. MIRON CONSTRUCTION CO., INC.
CONTRACTORS • CONSTRUCTION MANAGERS • MACHINE ERECTORS • DESIGN SERVICES
P.O. Box 962 Appleton, WI 54912
Auaust 22, 1985
Reinke,�Hansche, Last, Inc.
805 N. hiain Street
Oshkosh, Wisconsin 54901
RE: OSFIICC�H CF��TL'RE
.,l�'�i�_ -��5�7'��
Enclosed is a proposal from Drucks Pl�mibing for additional work
co�leted on the above captioned project. This proposal is for
rerouting the roof drains as necessary. A breakdown is as follows:
Drucks Plwnning . $3,116.61
+P. G. Miron's Management Fee 467.49
---- -
Zt7PAL --------------------------------- $3,534.10
Please issue a change order in the above amount at your earliest
convenience. Should you have any questions please feel free to call.
Sincerely,
P. G. NffId�N CONSTRUCTION
l�'�.r:l��.��/� v�/i':-�
�� � i �:�,
Greg Kippenhan
President
GK/kb
enc.
- 13d -
�-:. o
�
c+; c+
`G; �, p
Q
n�: �
�- . �
m;
F�, w
C,_ �
Q� Ul
(� _.-.,
n
r
�
� 3
no
.Z1 �
."O i--�
� O
m z
o ••
a
� o
N �
�
-s v� c�oa
o <-+ o cn -o
O -S 7 �'O
-h C In T� Z
(� c-F O O
O_ c+ � cn <
� � c �ro
w � n
... ro rr c� �
� .•. ro �
v� o � o,
'O c-f � c-f 7
.+. N � t�
-O N C7 N N
�• �O
7 v O
(� 20.. 'S �
O O_
v � c �. �p
d 7 (D �
fi n n �
fD • c+
i I GJ
� I
o� a -�
n.c�o
n.
ao �-� a
c+3�
.-� .+. r.• p.
O� O 'S
Q 7 O L7
O d 7 1
-S ^�
�
m
N
a
0
�J+-
��
�3i
r�^+a
f�'�