HomeMy WebLinkAbout33925 / 86-86.
MAY 15 1986
(CARRIED LOST
PURPOSE
INITIATED BY
�
LAID OVER WITHDRAWN
CHANGE ORDER N0.'S G-3 AND E-3
GRAND OEPRA HOUSE PHASE III AND IV
GRAND OPERA HOUSE BOARD
RESOLUTION
6
BE IT RESOLVED by the Common Council of the City of Oshkosh that the
following change orders for general construction work and electrical work,
Phase III and IV in the Grand Opera House is hereby approved:
CHANGE ORDER N0. G-3
Marino Construction Co., Inc.
3620 South Clement Avenue
Milwaukee, WI 53207
Amount Added: $32,391.98
Purpose: See attached change order
�
i
BE IT FURTHER RESOLVED by the Common Council of the City of Oshkosh
that the aforementioned change orders are hereby approved; copies of which
are attached to this resolution.
BE IT FURTHER RESOLVED that monies for this purpose will be available
from Account No. 316-105 from the 1986 General Obligation Bond.
- 37 -
SIIBiiITTED BY
'' ' � � � :�'
r
1018 MtEST SOUTH PaFK AVENUE. BOX 2096. OSMFGSM, WISCONSW 5<�]3
TEIEPHONE 1016� 235-]3t0
6 May 1986
210 ENST MICMIGAN $1FEET, MILWAUKEE, M45CANSIN 5JZt,
ARCHITECTS/PL4NNERS . _. tE�aHOO+E Uul ni-sa:..
RE: FILE 8133/79�05 - PHASES III 6 IV
RESTORATION AND REiiA$ILITATION
THE GRAND OPERA HGiJSE
CITY OF OSHKOSH� WISCONSIN
CHANGE ORDEE?S FOR SUBMISSION TO:
GRAND OPERA HOUSE BOARD - 6 MAY 1986
FOR CONSIDERATION
OSHKOSH COMMON COUNCZL - 15 MASC 1986
FOR ACTTON
GENERAL CONSTRUCTION - MARZNO
RESOLUTION # 86
Estimate No. 15
Item No, 1- Renail Annex lst and 2nd subfloor
including Landing 3 of Stair 2
Item No. 2- Apply 15# felt between subfloor
and underlayment, Rooms C.04,
C.07 (both levels) and C.15.
Estimat� No, 16 - Install oak out-corners on Room
C.OS free-standing columns.
Estimate No. 17 - Add wood moldings to House Walls
per Architect's Drawings A-113,
127 and 128 - for wall fabric
scrolls.
Estimate No. 18 - Change plaster on Balcony Stair
Bulkheads to wainscoting.
Estimate No. 19 - Repair Stage Truss West end
bearing per Architect's Drawing
Sheet A-125
Estimate No. 20 - Remove top layer of Historic Lobby
Wood Floor and install new pLywood
underlayment.
- 37a -
FOR
THE GRAND OPERA HOUSE
OSHKOSH, WISGONSIN
ADD $ 1,003.95
ADD 284.63
ADD 333.65
ADD 1,910.04
ADD 1,650.70
ADD 438.75
ADD 2,657.35
. RESOLUTION # 86
/
Estimate No. 21
Item No. 1- Head out Aistorical Lobby ceiling
joists to allow centering of light
fixtures. ADD $ 110.32
Item No. 2- Enlarqe existing door E-1 framing
to provide for a legal exit width. ADD
Item No. 3- Provide a concrete pad in Room
C.09 for relocated lighting dimmer
cabinet. ADD
Item No. 4- At west side, Procenium Arch,
remove discovered door jamb to
allow plastering of wall flush
Item No. 5-(This item was included in Change
Order G-1, Ztem 4.)
ADD
Item No. 6- Fur west wall, Room C.06 to
accommodate electric cabinet heater. ADD
Item No. 7- Fur out south wall, Room C.15, to
accommodate relocated electrical
panels.
Item No. 8, 10, 11, 12 14, 16, 17, 19 -
Add fire stopping as directed by
the City Building Inspector.
Item No. 9-(This item was included in Change
Order G-2, Item No. 4.)
Item No. 13- Add a new joist below Room C,06
to replace a rotted joist.
Item No. 18- (This item was included in Change
Order G-2, Item No. 2.)
Item No, 20- Insulate north exterior walls,
Room C.06, C.10, C.07.
Item No. 21- Fur west wall, Room G.oq to
accommodate electrical panel.
Item No. 22- Insulate wall cavity under east
House wall windows.
File 8133/79005 - Phases III & IV
Change Orders for Submission
- 37b -
ADD
ADD
ADD
•��
•��
•��
69.00
189.61
124.20
182.01
159.97
3,361.80
148.81
643.25
272.42
89.01
Page 2 of 3
i
r v1
RESOLUTION # 86
Item No. 23- (This item was included in Change
Order G-2, Item No.
Item No. 24- Rough Hardware, Small tools,
Trucking and Superintendent
for above items.
Interior Brass Railings
per Marino's original alternate bid
House Scaffolding L'se
Five i5) weeks at $985.00 per week
in accordance with Marino's
June 18, 1985 letter
ADp $ 1,337.51
ADD 12,500.00
ADD 4,925.00
TOTAL - MARINO CHANGES
- • „ -• - -
- .
------ - - - �
_�.5--- -- - - — -
File 8133/79005 - Phases SII & IV
Change Orders for Submission
- 37c -
$32,391.98
Page 3 of 3
•
3UZOH
n
y
�C
n
r
�yJ
x
�
K
r
�
N
�
m
rn
�ryy o
�1 y
H
H O
d z
T� C7
K O
� ro
tn H
�
z
0
„.... .. ,_. ... , . .. .;ee ta
�
c. ... .:..... :......, ,.,:r.a ,_
�
.... �_....... . . w
.. .. . ... . .. . �.;,;.
�,. . . ....,.�a.�t.aar,:.x� M:,w�
v
J
v° ro
mro
N O
5 N
C (�
� x
m w
�
w
N
O
tt
�
N
�S
m
�
Gl
�t
w
�
a
m
m
a
�
�
�
��
�
'��
��