Loading...
HomeMy WebLinkAboutPW CNT 14-11/CHG OR 1/Wood Sewer & ExcavatingDEPARTMENT OF POBLIC WORKS 215 Church Avenue P.O. Box 1130 Oshkosh, Wisconsin 54903-ll30 Ph.(920)236-5065 Faz (920) 236-5068 June 18, 2015 Ms. Sue Wood VJood Sewer & Excavating, Inc. E9238 County Road X New London, WI 54961 Subject: Change Order No. 1 Contract 14-11 Deaz Ms. Wood: � OIHKOIH ON THE WNTEP Enclosed is an executed copy of Change Order No. 1 between the City of Oshkosh and Woos Sewer & Excavating, Inc, regazding the abovementioned project. If you have any questions, please call our office at (920)236-5065. Sincerely, even M. Gohde,� Interim Director of Public Works SMG/U[ � Enclosure: Change Order No. 1 cc: Pam Ubrig, City Clerk (w/originai) Tara Wendt, Assistant Finance Director (w/copy) File (w/original) 1?Engincuing�2014 COM[tAC'fS\t4-11 Sm 1.61 Rchab-I&I Rcduttio� Pmg�Projac InEOrmacio�\Contnn Info\Ch¢ngc Page 1 of l Orders\lal l Fsccumd CO k] Lv 6-19-IS.doa TO: Wood Sewer & Excavating, Inc. E9238 County Road X New London, WI 54961 CHANGE ORDER #1 DATE: MAY 13, 2015 Your present contract with the City of Oshkosh, Contract No. 14-11, awarded July 22, 2014, is hereby amended and changed as follows: NET INCREASE TO: SECTION I- SANITARY MANHOLE REHAB NET INCREASE TO CONTRACT Section I Sanitary Manhole Rehabilitation Totals Bid Total $393,03920 $393,039.20 C.O. #1 $39,825.02 $39,825.02 Contract Total $432,864.22 $432,864.22 CITY OF OSHKOSH Gi'11 Recommen d: �Ca.- Interim Director of Public Works � $39,825.02 $39,825.02 Appr /ed and accepted: ontractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. � ��� �� � Comptroller Approved as t orm: f > City AttOt� CONTRACT 14-11 - CHANGE ORDER #1 SECTION I- SANITARY MANHOLE REHABILITATION ADDITIONAL WORK REQUIRED: C.O. #1 - SECTION I ITEM BID INSTALLED NET NET UNIT �NCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT qUANTITY QUANTITIES INCREASE DECREASE PftICE CONTRACT CONTRACT PRICE PRICE 1 Additional equipment, labor, and materials to install hot mix asphalt for temporary pavement a� the intersection of Sawyer and Lump Witzel on 10/31/2014 Sum 0.00 1.00 1.00 $1,053A2 $1,053.02 2 Additional equipment, labor, and materials to repair sanitary sewer on Newport Avenue on Lump 11/6/2014 Sum 0.00 1.00 1.00 $6,300.00 $6,300.00 3 Additional equipment, labor, and materials to cut and cap a 12" sanitary sewer forcemain on Bowen Streetonll/24/2014 Lump Sum 0.00 1.00 1.00 $12,600.00 $12,600.00 4 Additional equipment, labor, and materials ro repair sanitary sewer on Lump Oak Street on 12/11/2014 Sum 0.00 1.00 1.00 $5,400.00 $5,400.00 5 Additional equipment, labor, and materials to repair sanitary sewer on 20th Avenue on 1/23/2015 Lump and 1/26/2015 Sum 0.00 1.00 1.00 $14,472.00 $14,472.00 ADDITIONAL WORK: C.O. #1 -(ITEMS 1- 4) - SUBTOTAL NET INCREASE TO: SECTION I NET INCREASE TO SECTION I NET DECREASE TO SECTION I NET INCREASE TO CONTRACT: Page 1 of 1 539,825.02 $0.00 $39,825.02 $39,825.02 $0.00 $39,825.02