Loading...
HomeMy WebLinkAbout34262 / 87-478_ . ! JANUARY 22, 1987 iCARRIED # 478 LOST LAID OVER WITHDRAWN RESOLUTION ) PURPOSE: APPROVE CHANGE ORDER E-4 FOR THE GRAND OPERA HOUSE RESTORATION PROJECT, PHASE III AND IV INITIATED BY: GRAND OPERA HOUSE ADVISORY BOARD BE IT RESOLVED by the Common Council of the City of Oshkosh that the following change order for electrical work Eor Phase III and IV, Grand Opera House Restoration Project, is hereby approved: CHANGE ORDER N0. E-4 Meyer Electric, Inc. N2092 County G ChilCon, WI 53014 AMOUNT ADDED: $3,164.09 PURPOSE: See attached change order BE IT FURTHER RESOLVED that the proper City officials are hereby authorized and directed to execute the aforementioned change order; a copy of which is attached hereto. Monies for this purpose are available from Account No. 316105 Buildings - Grand Opera House. - 11 - SllBMITTED BY �.�.�C �2� C""__/ v APPRO� S RESOLUTION # 478 � yarbro - kempinger � architects, inc. 1018 W. SOUTH PARK AVENUE • POST OFFICE BOX 2096 • OSHKOSH, WISCONSIN 54903 • 414/235-3310 CHANGE ORDER r,o E-4 OWNER'S COPY � FILE NO. DATE 8133/79005 - Phases III & IV 22 December 1986 CONTRACTOR'S COPY ARCHITECT'S COPY The City of Oshkosh, OwrvER 215 Church Avenue, Oshkosh, Wisconsin 54 Dleyer Electric, Inc., CoNTRACrOR N2092 County G, Chilton, Wisconsin 53014 Electrical Work, Phases III & IV, Restoration and CONTRACTFOR Rehabilitation, The Grand Opera Aouse, Oshkosh, Wisconsin IT IS HEREBY AGREED THE FOLLOWING CHANGE IN THE WORK SHALL BE COMPLETED IN ACCORDANCE WITH THE ATTACHED PROPOS�.� AND SUBJECT TO TEAMS OF THE ORIG�NAL CONTRACT DATED 20 June 1985 d SEE ATTACHMENT FOR THE SUM OF (ADD - Cr`��SY�� THREE THOUSAND ONE HUNDRED SIXTY FnT7R AND 09/100THS - - - - - - - - - - - DOLLARS ($ PR�oa ro THIS OADER THIS ORDER TOTALTO DATE ADD 12,681.00 3,164.09 15,845.09 DEDUCT NONE NONE NONE APPROVED YARBRO- EMPINGE , ARCSiIT TS BY %�'J Robert L, Yar ORIGINAL CONTRACT EXTRA ORDERS CREDIT ORDERS 119,700.00 15,845.09 NONE NETTOTALTODATE 135,545.09 ACCEPTED CITY OF OSHKOSH, WISCONSIN r:il nager gy Citv Clerk ACCEPTED Approved as to fozm, MEYER ELECTRIC, INC, BY Cit� Attorney �� � I hereby certify that the necessary provisions Bv�-__d�'�� r �P"' - �hY-hav�-b€�ma�e--.`_o-t-��-t_�l�bi3t� that � 4�111 3CC]'1.1('y L�':C:CL� �ii5 CO:1L�dCt. - lla - City Cc�nptroller I J RESOLUTION #a78 ATTACHMENT C aniT ge Order No. E-4 Meyer Electric, Inc. 22 December 1986 RE: File 8133/79005-Phases III & IV Restoration & Rehabilitation The Grand Opera House City of Oshkosh, wisconsin Page 1 of 2 Note: Contractor's Proposals for each item and dated October 27, 1986 are attached. Item No, l: Relocate Electrical Panelboard 1/M to satis£y Electrical Code •�� Item Nc. 2: Extra oriring for au±omatic releases on stage smoke vents ADD Item No. 3: At House Chandeiier, install fabric sleeve on electric cable, paint support cables, rig-up weighted pulley for electric cable Add Item No. 4: Add "end of intermission" push button for chime system at stage left ADD Item No. 5: Adjust Change Order E-1, Item 15, labor cost as follows: Change Order E-1 Labor, not-to-exceed $1,982.00 Actual cost per attachment 1,748.74 DEDUCT Item No. 6: Item No. 7: Replace conduit servina aisle lights that were filled with concrete under Phase II Work ADD Relocate conduit work in Room B-24 to a11ow for ductwork ADD Item No. 8: Relocated wa11 bracket outlets in Public Toilet Room C.06 and C.08 to allow for selected mirrors - llb - ��� $ 334.47 437.77 458.52 386.19 (233.26) 1,291.99 96.38 184.82 RESOLUTION #478 ATTACHMENT C an— g� e Order No. E-4 Meyer Electric, Inc. 22 December 1986 RE: Fi1e 8133/79005-Phases III & IV Restoration & Rehabilitation The Grand Opera House City of Oshkosh, Wisconsin Page 2 of 2 Item No. 9: Relocate Room G.04 and G.OS (Control Rooms) work lights - for aesthetic reasons Item No. 10: Remove and replace Phase II lighting at top land;ng, Stair No. 3 to allow for Phase II-IV insulation Work Item No. 11: Item No. 12: Item No. 13: Relocate sump pump recptacle as directed, Room B.24 Credit for conduit and feeders to new dimmer rack Add two (2) exit lights, one over poors C.-4-5 and one over poor C.-14 (two total) - llc - ADD $ 277.77 ADD 256.74 ADD 117.40 DEDUCT (1,041.70) ADD 597.00 NET CONTRACT ADD $3,164.09 � MEYER ELECTRIC INC. Electrical Contractors COMMERCIAL — RESIDENTIAL — INDOSTRIAL N2092 County G Chilton, WI 53014 October 27, 1986 City of Oshkosh Grand Opera House 215 Church Avenue Oshkosh, WI REFs Relocate panel on stage 20' 1 4 4 4 4 1 1 1 1 2' 3' 15 1 1 1/2" unistrut Dayton ]A601 blade 1/4 x 1 1/4" bolts 1/4" nuts 1/4•' vasher 1/4" unistrut nut qt. wire lube 2•' 2 hole s�rap 2" EMT coupl. 2" ridgid 2" ridgid 3/4•' unistrut welding rods 2" KO closer 9 hours � 23.50 TOTAL N�ATERIAL OVER HEAD PROFZT BALANCE DUE - 11d - IT�t�+ Ko.� RESOLUTION #47fl Telephone: (414) 849-470T � $ $ $ $ 27.51 10.84 .17 .13 .09 1.68 2.73 ,21 4.71 2.81 5.69 4.12 2.62 1.62 64.93 211.50 276.43 27.64 304.07 30.40 339.47 MEYER ELECTRIC INC. Electrical Contractors COMMERCIAL — RESIDENTIAL — INDUSTRIAL N2092 County G Chilton, WI 53014 October 27, 1986 City of Oshkosh Grand Opera House 215 Church Avenue OshkOSh, WI I rEn.� N c�. 2 RESOLUTION #478 Telephone: (414)849-4Y07 REF: Extra wiring for automatic releases on smoke vents 1 2 17 2 12 178' 90' 26 5 2 9 1 3 3 4 4 1 1 Sq. D 2 x 2 x 4' wireway 2 x 2 end plates 1/4" plastic anchor Y �rirenuts R virenuts 12 THHN str. 1/2" EMT 1/2•' steel conn. 1/2" steel coupl. 1/2" mini 1/2" snap strap Klien 1232HS blade 4•' sq. box 4" sq. blan� cover 1/4 x 2" lead anchor stacons 4" sq. box extension Potter Brumfield 120V coil control relay TGTAL Mp.TERiAL 11 1/2 hours @ 23.50 OVER HEAD PROFIT BALANCE DUE - lie - $ 16.80 4.20 .53 .09 .63 13.08 23.62 9.82 2.46 .09 1.32 .85 3 . 8'7 1.44 .46 .17 1.62 10.50 $ 91.55 270.25 $ 361.80 36.18 $ 397.98 39.79 � 437.77 MEYER ELECTRIC INC. Electncal Contractors COMMERCIAL - RESIDENTIAL - INDUSTRIAL N2092 County G Chilton, WI 53014 October 27,1986 City of Ost�lcosh Grand Upera House 215 Church Avenue Cshkosh, WI ITern No.3 RESOLUTION #478 Telephone: (414)849-470Y REF: Install sleeve, paint cables, rig-up pulley for chandelier 2 10 x 1 1/2" screws 34 1/4-20 nuts 8 1G x 1 i/2" screws 1# 16d nails 2 U bolts Paint 15 1/2 hours � 23.50 TOTAL MATERIAL OVER HEAD PROFIT BALANCE DIIE - llf - $ $ $ $ � .11 1.42 .34 .52 4.20 8.11 14.70 364.25 378.95 37.89 416.84 41.68 458.52 MEYER ELECTRIC INC. Electrical Contractors COMMERCIAL - RESIDENTIAL - INDUSTRIAL N2092 County G Chilton, WI 53014 October 2'I, 2986 City of Oshkosh Grand Opera House 215 Church Agenue Oshkosh, WI 1 TE t�i Ko - � RESOLUTION #478 Telephone: (414)849-4ZOT REF: Add push button for chime system on stage left, eaet side - requested by Bob Yarbro 200' 100 70' 1 12 2 1 1 8 8 1 1 Beldon 16-3 cable 5018CV12 staples 1/2" EMT 1 g. masonery box 1/4" plastic anchors 1/2•' steel conn. 4" sq. box 4" sq, blank 1/2" steel coupl. 1/2" snap strap Nutone push button Sierra P14 plate 8 hours C 23.50 TOTAL MATERTfAT• OVER HEAD PROFIT BAI�ANCE DUE - llg - $ $ $ $ $ 96.60 2.10 18.37 2.82 .51 .76 1.29 ,49 3. 94 .76 2. 96 .58 131.18 188.00 319.18 31.91 351.09 35.10 386.19 ITE'r� Ko_s RESOLUTION #47A MEYER ELECTRIC INC. Electrical Contraciors COMMERCIAL - RESIDENTIAL - INDUSTRIAL N2092 County G Telephone: Chilton, WI 53014 (414) 849-4Y07 October 27, 1986 City of Oshkosh Grand Opera House 215 Church Avenue Oshkosh, WI REF: Per letter of 10/16/85 - wiring of roof top units (labor only) 61 1/2 ha•.:rs C� 8.50 $ 1,445.25 OVER HEAD 144.52 $ 1,589.77 PROFIT 158.97 BALANCE DUE $ 1,748.74 - llh - 1VIEYER ELECTRIC INC. Electncal Contractors COMMERCIAL - RESIDENTIAL - INDUSTRIAL N2092 County G Chilton, WI 53014 October 27, 1986 City of Oshkosh Grand Opera House 215 Church Avenue Oshkosh, WI REFs 1 1 1 2 102' 2 30' 3 1 4 2 1 1 4 2 6 11 5 5 8 9 5 45 ' 1 5 1 1 1 1 2 I TE h� NO. lo RFSOLUTZOra #n7e Replace conduit that vas full of concrete (per Bob Yarbro's instructions) 4" sq� box 4" sq. blank cover 1/2 x 3" nipple 1/2" locknut 12 THHN str. G wirenuts 1/2" emt 1/2" snap strap 1/4" lead anchor 1/4" plastic anchor 1/2" steel conn. 1/4" masonery bix Klein 1232HS blade 1/2" locknut 1/2 x 3" nipple R virenuts 1/4'• plastic anchor 4" sq, box 4" sq. box cover 1/2" snap strap 1/2" cann. 1/2" coupl. 1/2" EMT 4" sq. box ext, 1/4 x 1 1/4" lead anchor 1/2" x 12" bit 1/2" x 18" bit gal. Acryl 60 50# non shrink grout P415 conn. 39 hours @ 23.50 TOTAL MATERIAL OVER HEAD PROFIT BALANCE DUE - lli - Telephone: (414)849-4707 $ 1.29 .49 1.20 .21 4.55 .23 7.87 .16 .12 .76 .99 2.10 .85 .42 2.39 .31 .23 6.45 2.41 .17 3.40 1.10 11.81 1.62 .41 28.66 34.24 16.81 13.75 6.27 $ 151.2'7 916.50 $1,067.77 106.77 $1,174.54 117.45 $1,291.99 l l�nry No. 7 RESOLUTION #478 MEYER ELECTRIC INC. 6lectrical Contractors COMMERCIAL - RESIDENTIAL - INDUSTRIAL N2092 County G Chilton, WI 53014 October 27, 1986 City of Oshkosh Grand Opera House 215 Church A enue Oshkosh, WI ° Telephone: (414)849-4707 REFs Move pipe for duct in basement - requested by Bob Yarbro 1Q' 3/4" EMT 1 3/4" KO closer 2 roll plastic tape 3 1/4 hours � 23.50 TGTAL MATERIAL OVER HEAD PROFTT BALANCE DUE - llj - $ $ $ � $ 2. 31 .21 .77 3.29 76.27 79.66 7.96 87.62 8.76 96.38 MEYER ELECTRIC INC. Electrical Contractors COMMERCIAL - RESIDENTIAL - INDUSTR(AL N2092 County G Chilton, WI 53014 October 27, 1986 City of Oshkosh Grand Opera House 215 Church Avenue Oshkosh, WI Ircn� Ho.B RESOLUTION #478 Telephone: (414)849-4Y07 REF: Relocate bathroom lite fixtures as requested by Bob Yarbro 6 1/2 hours C 23.50 OVER HEAD PROFIT BALANCE DUE - llk - $ 152.75 15.2"7 $ 168.02 16.80 $ 184.82 - ITen., No.9 RESOLUTION #47S MEYER ELECTRIC INC. Electrica/ Contractors COMMERCIAL - RESIDENTIAL - INDUSTRIAL N2092 County G Telephone: Chilton, WI 53014 (414) 849-4707 October 27, 1986 City of Oshkosh Grand Opera House 215 Church A�enue Oshkosh, WI REF: Move lites in control room - requested by Bob Yarbro 30 • 1/2'• EMP $ 7. 87 4 1/2" coupl. •79 3 1/2" conn. .66 3 1/2" snap strap •28 120� 12 THHN str. $•82 6 R wirenuts •32 3 4" sq. box 6.20 3 4" sq. x rmad plaster zing 4.8$ TOTAL MATERIAL # 29.82 8 1/2 @ 23.50 199.75 $229.57 OVER HEAD 22.95 $252.52 PROFZT 25.25 BALANCE DUE $277.77 - 11L - MEYER ELECTRIC INC. Electrical Contractors COMMERCIAL - RESIDENTIAL - INDUSTRIAL N2092 County G Chilton, WI 53014 RESOLUTION i?478 �� M�"'G Telephone: (414)849-4707 October 27, 1986 City of Oshkosh Grand Opera House 215 Church Avenue Oshkosh, WI REFe Lites - top of landing - requested by Bob Yarbro 10' 1/2•' emt $ 2.62 4 Caddy clips •21 2 Y wirenuts •�9 1 R wirenut .06 43' 12THIiN str. 3.16 1 1/2" conn. •38 1 1/2" snap strap .03 1 1/4 x 1 1/4" lead anchor .�2 TOTAL MATER�AL $ 6.57 8 3/4 hours � 23.50 205.62 OVER HEAD PROFIT BAIANCE DUE - llm - $ 212.19 21.21 $ 233.40 23.34 $ 256.74 MEYER ELECTRIC INC. Electncal Contractors COMMERCIAL - RESIDENTIAL - INDUSTRIAL N2092 County G Chilton, WI 53014 October 27, 1986 Cityof Oshkosh Grand Opera House 215 Church Avenue Oshkosh, WI I7�M N0, I j RESOLUTION �478 Telephone: (414)849-4707 REFs Move receptacle in basement for sump pump as requested by Bob Yarbro 1 4" sq. box 1 4" sq. blank 5 1/4 x 1" plastic anchor 2 1/4 x 2" lead anchor 2 1/2" steel conn. 1 1/2" coupl. 4 hours @ 23.50 TOTAL MATERIAL • ;S. • � PROFIT �ALANCE DUE - lln - $ 1.48 .48 .21 .24 .40 .22 $ 3.03 94.00 $ 97.03 9.70 $106.73 10.67 $117.40 MEYER ELECTRIC INC. Electncal Contractors COMMERCSAL — RESIDENTIAL — INPUSTRIAL N2092 County G Chilton, WI 53014 October 27, 1986 City of Oshkosh Grand Opera House 215 Church Avenue Oshkosh, WI 1 T�n.r �ro , 1 2 RESOLUTION #q78 Telephone: (414)849-4Y07 REF: Per Addendum #1 Phase V-B dated July 11, 1986 Credit for conduit and f€eders to new dimmer rack Material $ 900.00 2 hours @ 23.5� 47.00 $ 94�.00 OVER HEAD 94.70 TOTAL CREDIT $1041.70 - llo - RESOLUTION #478 v �5i��""^"'� l TE �n Ha . 13 MEYER ELECTRIC INC. N2092 County G CHILTON, WISCONSIN 53014 (414) 849-4707 Uctobet 27, 1986 Yarbro–hempinger Architects 1018 ti�1. South Yark Avenue Oshkosh, Y%I Attn: Eob Yarbro REF: Add two exits S4e are pleased to quote you on the addition of tcao exits for Grand Opera House. $597.00 If you have any questions, please feel free to call. WE PROPOSE to furnish labor and material — complete in accordance with above specifications, and subject to conditions tound on boih sides ot this agreement, for the sum of: Five hundred ninety seven dollars($ 59�•00 ). Payment to be made as follows: ACCEPTE0. The above Orices, speci/ications and tonditions are satis�ac ReSpectfully 5ubmitted, tory ana dre hereby accepted. You are authorized to do the woik as sveci�ied- Payment wi�l be maee as ouUined above. (Read reverse side). MEYER ELECTRIC INC. Date of Acceptance —. t �� � Bv_ gy eC�z. ���'C �, , _: — _ -_. _ � s.;«�5., . ..,. • ;,;: _:.: _ ___ __ ___. � - llp- � i � 4.. . i � r�. c c� a cr � �G C d n � � � N � =a N . � W v c'� 3 � o .Z7 � .Z7 �-+ � O m z p.. a <o° m v (/� --i � -am� � i � O A v� �.\O N fi� �--' � � � �+ o� c F .. � ... �. O v � � o a� h �,roo N -S a D � � .-i 2'p F-+ O � C O Qo V1 < � � C TJ C-J �'-� N � 3 �n a N cf 3 �G O lL] N � N � w c-r o m .-. � �- o a m�co � � �-r � � � � N � A v � a � --V-� �p�y� \ �