HomeMy WebLinkAbout34301 / 87-525 . R E V I S E D
February 19, 1987 II525 RESOLOTION
(CARAIED LOST LAID OVER WITHDRAWN )
PORPOSE: AUTHORIZE BOILER COIL REPAIR AND REPLACEMENT
INITIATED BY: DEPARTMENT OF POBLIC WORKS
WHEREAS, [he coils in [he two boilera in the Zimpro sludge processing
system a[ the was[ewater trea[ment plant malfunctioned on February 6 S 11, respec-
tively, thezeby completely closing down the sludge processing plant, and
WfIEREAS, arrangements have been made [o transpor[ raw sludge to Appleton
for processing at approximately $1500 per day, and
WHEREAS, while performing repaixs on one coil, Azco, Inc. estimated
the coil� which shows signs of very serious deterioration� has an estimated life
of one year if returned to operation� and
WHF.REAS, [he City can purchase new coils from Zimpro, Inc. � [o be
shipped from Cincinna[i� Ohio� at a cost of $10,300.00 each plus shipping, and
WHEAEAS, i�ediate installation oY new coils is essential to eliminate
the need for continued transpor[ing of xaw sludge, [hereby making it impractical
to solicit bids for this purchase,
NOW, THEREFORE, BE IT RESOLVED by the Co�mnon Council of the City of
Oshkosh tha[ the proper City officials are hereby au[horized and dieected to waive
bids and [o purchase two new boiler coils from Zimpro, Inc. at a cost of $10,300.00
each� plus shipping. Money for this purpose is hereby appropriated from:
Accoun[ No. 941-369 -- Sewage Utility, Solid Disposal Repairs.
SUBNITTED BY .TT,_
APF��'��� ��.-_—L_
- 29 -
� �t � 3 tic'�v p
fD 9 O Y O tD lU
h .v —1 lD �in �n
'G A � O� �O
� O� T2 � AC L
Y O .. f0 (D Y (T
!0 �G J 9 N
Z Ch y O fT
F � ➢ �
�o n o v -s
(�. < o rr
mv aaoo
N ~ t=+ A ➢ �
� � � � IP
d O ��M1
N ✓ �
3 N
N N
�
c+ W
�O
£ �-
p� r�-
�n N
�+ �
N
£
N
c�
N
l