HomeMy WebLinkAbout34314 / 87-542 .
March 5, 1987 Ik592 AESOLOTIDN
(CARRIED LOST LAID OVER WITHDRAWN )
PURPOSE: APPROVE AMENDt�NT TO AGREEMENT WITH ROBERT E. LEE 6 ASSOCIATES
FOR WASTEWATER MANAGEMENT ENGINEERING
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
BE IT RESOLVED 6y [he Common Council of the Ci[y of Oshkosh that [he a[[ached
Amendment No. 1 to Agreemen[ for Engineering Services between [he City of Oshkosh�
Wisconsin and Robert E. Lee & Associa[es� Inc. for Wastewater Management Engineering
is hereby approved and [he proper City officials are hereby au[horized and directed
to execute same.
BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated
from Accoun[ No. 919-191 - Sewex Otility - Construction in Progress.
SOBItIS'f6D HY
A?PROtc�� ��� O .x
- z0 -
� aFSOLVmxom asaz
AMEtlDMENT N0 . 1 TO
AGAEEMENT FOR ENGINEEAING SEAVICES BETWEEN
THE CITY OF OSHKOSH� WISCONSIN
AND AOBEAT E . LEE & ASSOCIATES , INC . FOR
WASTEWATEA MANAGEMENT ENGINEERING
THIS AMENDMENT � made and entered into on this _______ day of
March , 1987 , to an agreement dated July 18 , 1986 , by and between the
City of Oshkosh � a municipal corporation located in Winnebago
County , WSsconsin, (OWNER) and Robert E. Lee and Associates, Inc.� a
corporation� authorized to provitle engineering servlces in the State
of Wisconsin (ENGINEEH)
SCOPE OF WOAR
To evaluate the existing chemical feed system to identify
associated operational problems at the Ovner's Wastevater
Treatment Plant and to evaluate methods of separating
sidestream floi+s from influent flous so metering and sampling
of the plant will not lnclude these flows. Findings Will be
incorporated into the Aeratio❑ Study report as a final
submittal to the Owner .
SCHEDULE
A report will be submitted to Owner by April 15 , 1987 .
COMPENSATION
Nork shall be performed on a Lump Sum basis . Total cost of the
work shall be $2 ,250 .00 .
TEAMINATION
Owner may terminate this amendment i❑ the event that test
results from previous studies show that it is not feasible to
incorporate biological phosphorus removal at Lhe Treatment
Plant or that sidestream flov equalizatio❑ to the treatment
process train is not feasibla .
Contract Amendment No . 1
Page 1 of 2
- 20a -
. . RESOLUTION q542
/•
In eigning this Amendment, the Ocmer graata the Engineer speclfic
authorization to proceed with the work deacribed herein as a Special
�Engineering Service under the eaiatlag Agreement for E¢glneering Servicea.
ROBERT E. LEE 6 ASSOCIATES, INC. CZTY OP OSFllCOSH� WISCONSIN
B9 l���l^i��Q_�� BY
Richard S. Swiontek� P.E.
/_��• �/'�,1 '� �
B9� I/�/!_4MI�J � 1' ��l✓ By
5 eldon Stone, Chemiet -
Date A ���Ylle.�.��/ '/2 /r,=�� Date
�/ .
Contrac[ Amendment No. 1
Page 2 of 2
- 20b -
.. � .
� 3 o£io9 �
fy � A --� � �p
� � m Z a � � �
� tT O •• p
Y � :� ➢ N
3
F C� �p D O T r �
p� < 0 3 tD �
�� Vl •--� J � 3
N SL N :�'.Y.
�p p J mtt
� N �.N �
N N h �
h O D W
m �� s.
� �. z
� o, m
,- c« m
� m 9
N � N
�
-�j ��+
r�O
� 'S £
� �
�
��.. ....�r...�-.-»...,�...._��._-..� �1,�..-.... 't
' .y��...�..�.... �. ,,
� �..v.� ...
1 ... . _. . .. .
1, .,... .�_
r
� _. ...�___ . .., .... .. .��.�'
6�_...�..�.r.. . ..
I