HomeMy WebLinkAbout34619 / 87-308 October 15, 1987 #306 RESOLUTION
(CARRIED LOST LAID OVER WITHDRAWN )
PURPOSE: APPROVE CHANGE ORDER, PUBLIC WORKS CONTRACT 87-01
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
BE IT RESOLVED by the Common Council of the City of Oshkosh
that the following Chanqe Order, a copy of which is attached, is
hereby approved:
CHANGE ORDER, PUBLIC WORICS CONTRACT 87-01
Knaus Construction, Inc.
1691 E. Mason St.
Green Bay, WI 54302
Amount added: $27,750
Contract Time increased: 14 calendar days
Purpose: Replace existing sewer with larger diameter sewer,
modify three manholes and abandon fourth manhole.
BE IT FURTHER RESOLVED that money for this purpose is appropriated
from Account No. 348-145 -- Sanitary Sewer Construction - 1987
Construction in Progress.
SUDM2TTED BY __
n ..+ r
APPRO ��"rU d
- 20 -
���� ReS. CNANGE ORDER 1
PHOJECT TITLE > > �'� A�enue Sewer Intercep[or
PROJCCT N0. ��a CONTRACT NO. 8�-�� CONTRACT DATE $ept 8J
CONTRACTOR Kraus Construction Inc.
Thc followir�9 chan9c: a:c hcreby madc ;o thc Convact Documrnts:
Remove exis[ ing 12-inch diame[er sewer in 24th Avenuc between Sou[h Main and Ooty
Stree[s , and repla<e wi[h 15- �nch diameCer sewer in accordance wi [h Contract �oc-
uments and S�ecifi w[ ions, and line plan and profile drawings to he provided by
the Owner. 'dork includes installation of 1S-inch sewer be[ween Mf{ �y-1b3 and 14- -
453, and MH 14-4j3 and 14-186. Existing manholes 14-183, 14-453 abd 14-166 are to
be modified; manhole 14-18$ is tc be abandoned. �
Justiflwtion: - �
Sewer s.ize is inadeGuate for projected design flow rates. Replacement is necessary
in accordance wi2h projec[ Facility Planning.
CHANGE TO CGNTRACT PFICE � Will be de[ermined on uniC price basis plus $1 ,950 for MH
reconstruc[ ion and $1 . 150 for manhole and sewer abandonmenL EsCimated total is
Ori9inalConVactPrice: g 496, 137. 50 based on [�uantity es[ imates, see below.
Current contract priee,as adjusmd 6y previous chan9e orders: 3 �96� � 37• 50
The ConVact Price due m this Chan9c Order will be [increasedj [6aeraased] by 3 Z�'�5�
Thc ncw Convac: Pricc duc to this Chan9c Ordcr will bc S 523 �a�].50
Estimated Cost Breakdown: 15-inch sewer �@ $78/If x 240 if = $13,720
Bi [ Lonc Restoration (� $16/If x 130 If = 2,020
PC Conc Resroration a $3571f x 110 lf = 3,850
CHANGE TO CO�TRACT TIME MH Recons[. (� $650 ea x 3 = � ,95�
MH/Sev�er A:.�andonmen[ @ $I , ISO Is = 1 , 150
TheContractTimewillbe �incrcasedj [�•==- - � byfour[een���endardays. $2),]SO
The date for compictian ot all work under the conerac;will be December 21 , 1987 '
Appravals Heqvircd:
. uc etlective,thiz orucr mu:t he app:evM Ly V�.c Owner if i!ch>n9o: :LC sope o: objective of tM1C projecl, o�as may othetwise
bc rcquiretl undm thc ;crms ot thc Supplemcntary Gcncral Conditions ot thu ConVaet.
Fequcscedby CitY of Oshkosh - Gerald F. Konrad. DPW ���c �0/2/R7
ftecommendedby HMTB - Jeff M 11 Proiect Manager4' fi1.�•"IOQ.P'TQ� date 10/7/87
�b U c/
Ordcredby L�tv of 0 hko h - C Id F Konrad DPIJ dare
ir�
-r . ✓/�-� l C� ��`J
Accepeedby Knaus Cons[ruction Inc - Donald Kn us President date � /
Wilay�Flsk Porm 1iJ
- 20d -
' � : Res. #308
Page 2� Change Order lll� Contract 87-OS
Recommended: CITY OF OSHKOSH
By:
Diiec[or of Public Works C1ty Manager
City Clerk
I ceztify tha[ provision has been made Co pay the liabili[y [ha[ wi11 accrue
to the City of Oshkosh, Wisconsin� under the within Change Order.
. Comptroller
Approved as to form:
City Attorney
- 20b -
� 3 O SG ➢ a
no n p�o m
JJy rf Va
A -+ O I Z O
�+ O Q 00
m z rD < c
O .. Z lD c+
• ➢ Cl O
1 O Vl � J
`< O � O+
N � � yk
� ti �
i0 lD W
CO O e
O� V O W TJ
V d VI
l �
� D
0
�
�.
�
a
�
�