HomeMy WebLinkAbout34622 / 87-311 October 15, 1987 # 3ii RESOLUTION
(CARRIED LOST LAID OVER WITHDRAWN )
PURPOSE: ACCEPT AND APPROVE WAIVER OF SPECIAL ASSESSME��T NOTICES
AND HEARI�IG IN CONNECTION WITH I14PROVEMENTS
INITIATED BY: �EPARTCIENT OF PUBLIC LlORKS
BE IT RESOLVED by the Common Council of the City of Oshkosh that the
Waiver of Special Assessment Notices and Hearing under Section 66.60 of the
Wisconsin Statutes, for various utility and street improvements, for the premises
described below is hereby accepted and approved:
Description of Premises Benefits Damages
Sanitary sewer
Lots 74, 15, 76, 17
Estimated Construction Cost= $2,314
86 Engineering= 5185.12
Cost/lot = $185.12/4 = $ 46.28 None
Water Main
Lots 74, 15, 16, 77
Estimated Construction Cost= $3,072
8% Engineering= $245.76
Cost/lot = $245J6/4= $ 61 .44 None
Laterals
Lots 14, 75, 16, 17, 78, 19, 20, 21 , 22, 23
Construction Cost = $520/lot
8% Engineering, cost per lot= $ 41 .60/lot None
Gradin & ravelin
10 lots - Lots 14-23)
Cost= 290' x $78/ft.= �5,220.
Cost/lot = 55220/70= S 522.00 Wone
Concrete Pavin
70 lots - Lats 14-23)
Cost= 290' x $60= $17,400
Cost/lot = $17,400/70= $1 ,740,00 Wone
SOBWITT�D HY I'
APP
ii"�jG�--�--.-_L-...
_ Zq _
. Res. 5311
WAIVER OF SPECIAL ASSESSMENT NOTICES AND
HEARING �NDER SECTION 66.60, WISCONSIN STATUTE5
The undersigned� awner of property 6enefited by the
following improvements to be made 6y the city of Oshkosh�
Winnebago County� state of Wisconsin, to wit:
ENGINEERING FEE FOR SANITARV SEWER, WATER MAIN, & LATERALSg
GRADING & GRRVELING� CONCRETE PAVING
In consideration of the construction of said improvements by
the city of Oshkosh, Wisconsin, I here6y admit that such public
improvement will benefit said property and consent to the levying
of special assessments against the premises untler Section 66,60
of the Wisconsin Statutes for the cost of such improvements. In
accordance with Section 66.60(18) of the Wisconsin Statutes, I
hereby waive all special assessment notices and M1earings required
by Section 66.60 of the Wisconsin Statutes� and i further agree
and admit that the benefit of my property from the construction
of such improvements is in proportion to the footage thereof:
Descrietion of Premises
Third portion of ORCHARD LANE ESTATE5 PLAT
BENEFITS DAMAGES
SANITAkY SEWER
Lots 14� 15� 16� 17
Estimated Construction Cost= 52,314
8% Engineering= 5185. 12
COST/LOT= 5185. 12/4= S 46. 28 None
WATEk MAIN
Lots 14, 15, 16, 17
Estimated Construction Cost= 53,072
8% Engineering= �245.76
COST/LOT= $245. 76/4= %61.44 None
LATEftALS
Lots 14� 15� 16� 17� IB� 19� 20� 21w 22� 23
Constructian Cost= $520/lot
e% Engineering,COST PER LOT= 341.60/lot None �
GRADING & GRAVELIN6
(10 lots - Lots 14 - 23)
Coet= 290 ' x E18/ft.= E5,220
COST/LOT= 5220/lU= $522 None
CONCRETE PAVING
(10 lots - Lots 14 - 23)
Cost= 290' r. �60= 517�400
COST/LOT= �17400/10= 51 ,740 None
- 24a -
t
Aes. a311
Signature of Owner: _
6ARRV H. DECKER, OWNER
5treet Rddress:
City:
_________'________'__________
Date:
Signature of Owner: _____________________________
CHERVL DECK.ER� OWNER
Street Address: ___________ __________________
City: __" '
Date:
_________'_______________"_'_
Signature of Owner: _________
_____________________
GERALDINE DODGE, OWNER
5treet Address:
______________________________
City:
Date:
- 24b -
� 3 O m � � ➢ A
a o n .-o n ro
.-p y (i' O J N n V�
A � O 1n7NN O
T Z l D O n V i � C
O .. Z � �+ � �+
. ..N 4�
➢ (7 O � O
a o cn o � �+ a �
� o • c o
m � � £ zo a
vt ti � f+ �-� O 'S J
W � � � � �
<
O� V (l !D -� �
N
aN � U
� a
� � ...
o <
< z �
� � �
� a
� , o
� ... �,
� �
N l0 VI
\ p
� �
� n
m