Loading...
HomeMy WebLinkAbout34622 / 87-311 October 15, 1987 # 3ii RESOLUTION (CARRIED LOST LAID OVER WITHDRAWN ) PURPOSE: ACCEPT AND APPROVE WAIVER OF SPECIAL ASSESSME��T NOTICES AND HEARI�IG IN CONNECTION WITH I14PROVEMENTS INITIATED BY: �EPARTCIENT OF PUBLIC LlORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the Waiver of Special Assessment Notices and Hearing under Section 66.60 of the Wisconsin Statutes, for various utility and street improvements, for the premises described below is hereby accepted and approved: Description of Premises Benefits Damages Sanitary sewer Lots 74, 15, 76, 17 Estimated Construction Cost= $2,314 86 Engineering= 5185.12 Cost/lot = $185.12/4 = $ 46.28 None Water Main Lots 74, 15, 16, 77 Estimated Construction Cost= $3,072 8% Engineering= $245.76 Cost/lot = $245J6/4= $ 61 .44 None Laterals Lots 14, 75, 16, 17, 78, 19, 20, 21 , 22, 23 Construction Cost = $520/lot 8% Engineering, cost per lot= $ 41 .60/lot None Gradin & ravelin 10 lots - Lots 14-23) Cost= 290' x $78/ft.= �5,220. Cost/lot = 55220/70= S 522.00 Wone Concrete Pavin 70 lots - Lats 14-23) Cost= 290' x $60= $17,400 Cost/lot = $17,400/70= $1 ,740,00 Wone SOBWITT�D HY I' APP ii"�jG�--�--.-_L-... _ Zq _ . Res. 5311 WAIVER OF SPECIAL ASSESSMENT NOTICES AND HEARING �NDER SECTION 66.60, WISCONSIN STATUTE5 The undersigned� awner of property 6enefited by the following improvements to be made 6y the city of Oshkosh� Winnebago County� state of Wisconsin, to wit: ENGINEERING FEE FOR SANITARV SEWER, WATER MAIN, & LATERALSg GRADING & GRRVELING� CONCRETE PAVING In consideration of the construction of said improvements by the city of Oshkosh, Wisconsin, I here6y admit that such public improvement will benefit said property and consent to the levying of special assessments against the premises untler Section 66,60 of the Wisconsin Statutes for the cost of such improvements. In accordance with Section 66.60(18) of the Wisconsin Statutes, I hereby waive all special assessment notices and M1earings required by Section 66.60 of the Wisconsin Statutes� and i further agree and admit that the benefit of my property from the construction of such improvements is in proportion to the footage thereof: Descrietion of Premises Third portion of ORCHARD LANE ESTATE5 PLAT BENEFITS DAMAGES SANITAkY SEWER Lots 14� 15� 16� 17 Estimated Construction Cost= 52,314 8% Engineering= 5185. 12 COST/LOT= 5185. 12/4= S 46. 28 None WATEk MAIN Lots 14, 15, 16, 17 Estimated Construction Cost= 53,072 8% Engineering= �245.76 COST/LOT= $245. 76/4= %61.44 None LATEftALS Lots 14� 15� 16� 17� IB� 19� 20� 21w 22� 23 Constructian Cost= $520/lot e% Engineering,COST PER LOT= 341.60/lot None � GRADING & GRAVELIN6 (10 lots - Lots 14 - 23) Coet= 290 ' x E18/ft.= E5,220 COST/LOT= 5220/lU= $522 None CONCRETE PAVING (10 lots - Lots 14 - 23) Cost= 290' r. �60= 517�400 COST/LOT= �17400/10= 51 ,740 None - 24a - t Aes. a311 Signature of Owner: _ 6ARRV H. DECKER, OWNER 5treet Rddress: City: _________'________'__________ Date: Signature of Owner: _____________________________ CHERVL DECK.ER� OWNER Street Address: ___________ __________________ City: __" ' Date: _________'_______________"_'_ Signature of Owner: _________ _____________________ GERALDINE DODGE, OWNER 5treet Address: ______________________________ City: Date: - 24b - � 3 O m � � ➢ A a o n .-o n ro .-p y (i' O J N n V� A � O 1n7NN O T Z l D O n V i � C O .. Z � �+ � �+ . ..N 4� ➢ (7 O � O a o cn o � �+ a � � o • c o m � � £ zo a vt ti � f+ �-� O 'S J W � � � � � < O� V (l !D -� � N aN � U � a � � ... o < < z � � � � � a � , o � ... �, � � N l0 VI \ p � � � n m