December 22 , 1987
Mz. Gerald F. Konrad, P.E.
Director of Public Works
CITY OF OSHKOSH
215 Church Avenue
P.O. Box 1130
Oshkosh, Wisconsin 54902
Dear Mr. Konrad:
In accordance with your request we have prepared this proposal to
review the existing sewer "user charges" presently in effect for
the City of Oshkosh, and to update such user charges as required
due to changes in operating expenses , additions to sewer plant
investment, changes in number of customers and their usage
patterns, and changes in the wastewater pollutant strengths of
Category B customers, if any. The present rates are based on our
"Report on Proposed Sewer User Charges" dated December 1985.
As the City is aware from our previous study, the firm of JOHN A.
MAYER ASSOCIATES is familiar with the practices and procedures of
the EPA/DNR and the Wisconsin PSC with respect to sewer cost-of-
service and zate design studies. The sewer cost allocation and
rate design procedure utilized is based on user charge
principles.
This proposal is layered i❑ three parts or tasks: 1) revision and
updating of the existing sewer user charges, 2) development of a
sewer cost allocation model to be left with the City and training
of City personnel in the use of the model, and 3 ) leaving behind
the model on a working PC computer as a stand-alone sewer cost
allocation computer model. These "layers" are cumulative.
TASR #1: UPDATE EXISTIN6 SEWER USER CHARGES
A. Determination of Billable Units of Service
This is the single most important step i❑ the development of
rates. The following information must be assembled :
1. Category A: # of customers S billed sewer usage for
the most recent 12-month period.
2. Category B: Listing of customers, billed flow and
strengths for BOD, SS and Phos. for the most recent
12-month period .
- 9a -
aes. #393
Mr. Gerald F. Koniad, P.E.
December 22 , 1987
Page 2
3. Accumulate trailing 12-mo. billable from Tn. of
Algoma, Winnebago M.H. Institute, and any other
contractual users of the system.
4. Verification that items pl through X3 are
representative of a "typical" year.
5. Reconcile revenues by applying present tariff to
trailing 12-months billable units of service and
comparing to booked revenue. Discrepancy should be
narrowed to within 0. 58 if possible.
B. Gather Sewer System Plant Investment Statistics
1. Update plant investment, by uniform system of
accounts, for plant additions since the previous
study.
2. Determine Replacement Fund Annual Accrual.
C. Review Financial Information
1. Examine the Annual Reports/AUdits 1985-1986
2. Review any new debt issues outstanding since the
previous study.
3. Capital Structure as of 12-31-87
4. Hudget (OMSR) projection for 1988.
5. Determine revenue requirement using the "utility
basis" as well as the "cash basis" .
D. Perform Cost-Of-Service Allocation Study
1. Review the cost allocation study performed for the
December 1985 report and update as required.
2. Perform a cost allocation study and determine unit
costs for flow, BOD, SS and Phosphorus .
E. Design Sewer User Charqes
1. Design rates for Category A customers.
2 . Desig❑ rates for Category B customers.
F. Prepare Letter Report On Proposed Sewer Rate58
Prepare a letter report on the results of the cost
allocation study and our recommendations for
proposed sewer user charge rates for the City.
- 9b -
. ' Res. #393
Mr. Gerald F. Konrad, P.E.
December 22 , 1987
Page 3
TASK A2: DEVELOP SEWER USER CHARGE MODEL FOR USE BY
CITY PERSONNEL IN PERIODIC OPDATING OF THE USER CHARGE RATES
1. Modify the sewer user charge model i❑ order to
simplify input and output to the extent possible
for easy updating by City personnel.
2. Conduct two 4-hour sessions with City personnel
showing them how to update the sewer rate model.
TASR �3: PROVIDE THE USER CHARGE MODEL ON A WORRING PC COMPUTER
1. If the City desires to have the user charge model
provided along with the computer hardware to
operate the software program, a used COMPAQ
Portable 1 computer with 640K of RAM, and 2-360R
disk drives could be provided.
2. A used 20-meg PLUS DEVELOPMENT HARD CARD could also
be installed in the computer as an option.
PROFESSIONAL FEE ESTIMATE
Task #1: Update Existinq Sewer User Charqes
Assuming that the City's Staff is able to gather most of the
billing data and other data required for the updating process,
the total professional time estimated to complete the project is
32 - 90 hours @ $60/hr. or a dollar range of $1, 920 - 52,400 .
Task y2: Develop Sewer User Charge Model for Use by City Personnel
in Periodic Updatinq of User Charqe Rates
Modify the sewer user charge model to the extent practical
for ease of data input and output by City personnel. Conduct two
half-day training sessions, preferably a week or more apart, in
order to allow time to °play with" the model before the second
session. Estimated professional time: 30 hours - $1, 800.
Task #3: Provide the Sewer User Charqe Model w/ Associated
Hardware in Order to have a Complete Independent System
Provide the COMPAQ Portable 1 computer as described above
upon which to run the Sewer Oser Charge Model - $950 .
Add the 20-meg hardcard disk drive described above - $600 .
Out-of-pocket expenses for data processing, travel , telephone,
xerox and other expenses directly related to the specific
assignment will be billed on a dollar-for-dollar basis and are in
addition to the professional fee. These expenses are estimated
to be in the $300 - $400 range.
- 9c -
Res. #393
Mr. Gerald F. Konrad, P. E.
December 22, 1987
Page 4
COMPLETION TIlfE
It is understood that time is of the essence with respect to
getting the sewer rates revised. If the City Staff can provide
assistance in gathering the data required, we will make every
attempt to complete Task #1 and have the rate recommendation to
the City within 15 working days from noti£ication of acceptance
of Task ►1 of this proposal.
Should further information be needed, I would be more than happy
to respond to your request.
Re tfully submitted,
JOHN A.yMAY ASS IATES
John A. Mayer �
JAM/cpq
- 9d -
January 7 , 1988 g393 AESOLUTION
(CARRIED ______ LOST _____ LAID OVER _____ WITHDRAWN )
PURPOSE: APPPOVE AGREEMENT FOA SEWER CHARGE REVISIONS
INITIATED BY ; City Administration
WHEAEAS, from time to time, it is necessary for the City of
Oshkosh to review existing sewer user charges to fairly assess all
users for the costs of operating the sewage treatment plant ; and
WHEREAS� the City has solicited a proposal for services from
its past utility rate consultant to update the prese�t rates based
on a December 1985 report ; antl
WHEREAS� it is advantageous at this time to accept services for
Tasks 1 and 2 of the proposal of John A . Mayer Associates , Mequon ;
NOW, THEPEFORE� BE IT RESOLVED that the attached proposal for
sewer charge revisions from John A. Mayer Associates , 10624 N. Port
Washington Aoad , Mequon , Wiseonsln 53�92 is accepted and approved as
follows :
Task 1 -- Update Existing Sewer User Charger
32 to 40 hours @$60/hr . or $1 ,920 to $2 ,400
Task 2 -- Develop Sewer User Charge Model
30 hours @$60/hr . -- $1 , 800
BE IT FURTHER RESOLVED that the proper City officials are
authorized and directed to enter into an appropriate agreement for
such services . Money for this purpose is hereby appropriated from:
Account No. 950-560 -- Sewer Utility� General & Administrative
Professional Services .
SUBD�ITTED BY �---------�—
__.-----�__
- .J � v .a.s._.�
APPROYID .
- 9 -
ov
o �
� L
T
7 �
M L
� � c
3 ip C
N
� �
i � ~ N
O Ol p W �.ry
� � T �
4 4
r�l +� �n 1�
Ol C C
[h N O
YF E'� i •• p
41 �O O �
N'.+ � .v ¢
� t > C F- d'
v mv �0 06
O_' Q K '7 E CJ