HomeMy WebLinkAbout34744 / 88-441 February 18, 1988 Hqql RESOLUTION
(CARRIED LOST LAID OVER WITHDRAWN )
PURPOSE: APPROVE CHANGE ORDER N0. I , CONTRACT N0. 87-21
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
BE IT RESOWE� by the City of Oshkosh that the following Change Order,
a copy of which is attached, is hereby approved:
FOUR-WAY CONST. OF WI INC.
P. 0. 6ox 133
Berlin, WI 54923
Amount added: $10,456.43
Purpose: Add - Water Main & Storm Sewer
BE IT FURTHER RESOLVE� that money for this purpose is appropriated
from:
Acct. No. 339-983 -- Spec. Assessments - Water
Acct. No. 810-701 -- Water Utility - Construction in Progress
Acct. No. 335-989 -- Sewer Separation Fund Expenditures.
SUES::;TF.B EY
A?PROl'ED � - � ."
_ Z� _
Res. 447
C:;ai1Gc C:3Dr."A PIG. 1
T0: Four-Way Cons[, of WI Inc. 'Jl�T�; Febraary 8� 1988
P.O. Box 133
Bezlin� WI 54923�
Your present contract with the City of Oshkosh, Contract tio. s7-21
Ss hereby amended and changed as follows: �
( lnsert here work and/or materlals to be addzd or ell�inated and
the ur.it and/or lunp sum orice to be aZded to or deducted from the
contract, ) _
ADD - W'ATER MAIN & STORM SEWF,R
To[al Added Co Wa[er Main
(See page 2 for breakdown.) $8�324.63
To[a1 Added to S[orm Seuer
(See page 2 for breakdown.) $2,131 ,80
TOTAL A�DED BY THIS CHANGE ORDER= $10�456.43
Aecommended; CITY Or CS3'dC9E
Director of ?ubLic 4lorks �y� C+_tp Manager
City C1er�
Pnproved and accente3:
Consractc°
I certify that provision has been made to pay the 11abi1?ty that
wi11 accrue to the City of Oshkosh, 'disconsia, nnder the within
Change Order.
Co^�troLLer
Approved as to fora:
City Attorney
- 21a -
�l�I
Res. 446
CONTRACT 87-21 - CHRNGE OftDEFt #I
ADDED TO WATER MAIN = SECTIDN II
1 . E>;tra labor and materials to lower
proposed 8" water main under new
drainage swale in easement from
Carousel Inc. (fully assessa6le
to prfvate developer) 51 �493.20
2. Extra laGor & materials t❑ offset
existing 8" water main on Pearl
Avenue in two locaticns to allow
new constru�tion �4,64 L 36
3. E:ctra concrete curh & gutter�
sidewalk, and pavement restoration
on Pearl Avenue due to increased
construction area 4rom additional
valve installation by city Water
Department and extra offsets Z2, 190.07
_______________
TOTAL ADDED TO WFiTER MAIN = 58�324. 63
RDDED TO STOFiM 5EWEF2 = SECTION III
1. Re6uild two storm manholes on
Fear7 Avenue 51 �350.00
2. E::tra cost to e;ccavate {or
lowering gas main in Par4, Plaza
easement for storm sewer
installation � 781 .80
TOTFIL ADDED TO STOftM SEWER = �2, 131 .BU
TOTAI F1DDE0 BV CHANGE ❑RDER ttl 310,456.43
- 21b -
C
� y
�
���p L
\ � C
O
U
O
Z
S
N
O
i OJ
O CO �
�
pi ` d N
C O W
A � 0 r
� Q Q
U �
d NN L .. �
yp > 1� e0 Z W
O W 7 O �+
L L ti d'
p • a F- K
� QZ LL £ U