HomeMy WebLinkAbout34744 / 88-441 February 18, 1988 Hqql RESOLUTION (CARRIED LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVE CHANGE ORDER N0. I , CONTRACT N0. 87-21 INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOWE� by the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: FOUR-WAY CONST. OF WI INC. P. 0. 6ox 133 Berlin, WI 54923 Amount added: $10,456.43 Purpose: Add - Water Main & Storm Sewer BE IT FURTHER RESOLVE� that money for this purpose is appropriated from: Acct. No. 339-983 -- Spec. Assessments - Water Acct. No. 810-701 -- Water Utility - Construction in Progress Acct. No. 335-989 -- Sewer Separation Fund Expenditures. SUES::;TF.B EY A?PROl'ED � - � ." _ Z� _ Res. 447 C:;ai1Gc C:3Dr."A PIG. 1 T0: Four-Way Cons[, of WI Inc. 'Jl�T�; Febraary 8� 1988 P.O. Box 133 Bezlin� WI 54923� Your present contract with the City of Oshkosh, Contract tio. s7-21 Ss hereby amended and changed as follows: � ( lnsert here work and/or materlals to be addzd or ell�inated and the ur.it and/or lunp sum orice to be aZded to or deducted from the contract, ) _ ADD - W'ATER MAIN & STORM SEWF,R To[al Added Co Wa[er Main (See page 2 for breakdown.) $8�324.63 To[a1 Added to S[orm Seuer (See page 2 for breakdown.) $2,131 ,80 TOTAL A�DED BY THIS CHANGE ORDER= $10�456.43 Aecommended; CITY Or CS3'dC9E Director of ?ubLic 4lorks �y� C+_tp Manager City C1er� Pnproved and accente3: Consractc° I certify that provision has been made to pay the 11abi1?ty that wi11 accrue to the City of Oshkosh, 'disconsia, nnder the within Change Order. Co^�troLLer Approved as to fora: City Attorney - 21a - �l�I Res. 446 CONTRACT 87-21 - CHRNGE OftDEFt #I ADDED TO WATER MAIN = SECTIDN II 1 . E>;tra labor and materials to lower proposed 8" water main under new drainage swale in easement from Carousel Inc. (fully assessa6le to prfvate developer) 51 �493.20 2. Extra laGor & materials t❑ offset existing 8" water main on Pearl Avenue in two locaticns to allow new constru�tion �4,64 L 36 3. E:ctra concrete curh & gutter� sidewalk, and pavement restoration on Pearl Avenue due to increased construction area 4rom additional valve installation by city Water Department and extra offsets Z2, 190.07 _______________ TOTAL ADDED TO WFiTER MAIN = 58�324. 63 RDDED TO STOFiM 5EWEF2 = SECTION III 1. Re6uild two storm manholes on Fear7 Avenue 51 �350.00 2. E::tra cost to e;ccavate {or lowering gas main in Par4, Plaza easement for storm sewer installation � 781 .80 TOTFIL ADDED TO STOftM SEWER = �2, 131 .BU TOTAI F1DDE0 BV CHANGE ❑RDER ttl 310,456.43 - 21b - C � y � ���p L \ � C O U O Z S N O i OJ O CO � � pi ` d N C O W A � 0 r � Q Q U � d NN L .. � yp > 1� e0 Z W O W 7 O �+ L L ti d' p • a F- K � QZ LL £ U