Loading...
HomeMy WebLinkAboutRettler Corp/George Washington Monument City of Oshkosh, WI George Washingfon Monument Site Redeve%pment Project Scope of Services Proposa/ March 24, 2015 The City of Oshkosh George Washington Monument has been a regional landmark, since presented to the City in 1911. The monument is located across form Menominee Park on and triangular parcel, with frontage on Menominee Drive, Hazel Street and East New York Ave. The adjacent neighborhood and the City Parks department have developed a master plan which improves the monument site. Improvements include cleaning of the100 year old monument, providing accessible concrete sidewalks, a new flag pole, site lighting and a large landscape bed. The following Scope of Services is to provide construction development documents and on-site observation services for Site Development as identified in the following scope of services. I. Topographic Survey Services A. Provide topographic map for triangular parcel including centerline of each adjacent street. B. Obtain City utility as built information. C. Include private locate if determined needed by City. Fee for this work paid direct to private locate company. D. Provide hard copy map and digital file. IL Soil Borings � A. Coordinate for Owner, a geotechnical firtn to conduct soil borings (cost of soil borings will be the responsibiliry of the Owner). 1. The number, location, and type of soil borings will be coordinated with the Owner. 2. The geotechnical report will be used in the development of construction plans and specifications. III. Construction Bid Documents A. Obtain final approval, from Owner, for specific site improvements. 1. Improvements a. Tree removal, and other site preparation b. 5" reinforced concrete sidewaik fi:RETTLER corporofion c. Landscape bed, soil amendments, edging, plants, mulch, etc. d. 25' tall flag poie, American Flag, with Iight e. Electrical— by City of Oshkosh i. service ii. controls iii. three (3) street lights � iv. etc. f. Erosion control g. Landscape restoration h. Etc. B. Develop construction drawings 1. �emolition plan 2. Layout plan 3. Grading erosion conhol plan 4. Electrical plan - by City of Oshkosh 5. Landscape plan 6. Applicable details C. Develop Project Manual 1. Specifications 2. CSI Format D. Bidding Administration 1. Provide plan sets for bidding (printing and mailing of plans to be billed to Owner as direct reimbursa6le). 2. Provide pre-construction meeting with contractors to discuss project and contractor's concerns. (if required) 3. Provide bid opening and review bids with Owner and provide recommendation of award of contract. E. Permit Applications. 1. Permit application for WDNR — Notice of Intent (NOI) — Fees by Owner. 2. Other permits, if required, to be reviewed and discussed at known time. Application and/or design requirements and fees would be negotiated at time of scope solidification and expectations. s�: RETTLER corporation IV. Compensation for Services A. If the outlined Scope of Services is changed by the Owner after the beginning of the contract; the Consultant has the opportunity to re- negotiate the changed services. B. All governmental fees shall be paid directly by Owner. C. Plan printing for construction documents by Owner. D. Future phase construction documents not included in proposal. E. Electrical documents/plans not included in this proposal. F. Soil borings shall be paid directly by Owner. They are not included in proposal. G. Site construction layout and topographic mapping services are not inciuded in this proposal. Rettler Corporation will provide separate proposal. H. All billings will be paid on a 30-day basis with the billing amount determined based upon the total percent completion of said services. V. Schedule of Fees A. Item I—Topographic Mapping ......................... $1,650.00 B. Item III —Construction Bid Documents...............$2,950.00 This proposal shall remain firm for a period of ninety (90) days after the contract date below as signed by Rettler Corporation, the proposal may be withdrawn after this time. Rettler Cor�o ion / �31�4f�s Rick Re r Date President City of Oshkosh -�_/���_-- S /J 7 �/�_ Authorized Signature Date ��o RETTLER corporation