Loading...
HomeMy WebLinkAbout10. 15-248 MAY 26, 2015 15-248 RESOLUTION (CARRIED___6-0____ LOST _______ LAID OVER _______ WITHDRAWN _______) TH PURPOSE: AWARD BID FOR 24 AVENUE BOAT LAUNCH RESTROOM RENOVATION FOR PARKS DEPARTMENT TO CAPELLE BROS. & DIEDRICH, INC. ($82,440.00) INITIATED BY: PURCHASING th WHEREAS, the City of Oshkosh has heretofore advertised for bids for the 24 Avenue boat launch restroom renovation for the Parks Department; and WHEREAS, upon the opening and tabulation of bids, it appears that the following is the most advantageous bid: CAPELLE BROS. & DIEDRICH, INC. 253 N. Hickory Street Fond du Lac, WI 54935 Total Bid: $82,440.00 NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the said bid is hereby accepted and the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of same, all according to plans, specifications, and bid on file. Money for this purpose is hereby appropriated from: Acct. No. 325-0610-7214-07503 Park Improvement Fund – Buildings 323-0130-7214-06535 Property Improvement Fund -- Buildings Q a o x x x w s a 0 Z °m x x x 0 m x ° o0 0° °o u m o ud o a a S 0 et 3 0 c4 al Lri a O m w Q p 1- H Z W a w v W p O a N F Z K V a I- ° >. /.;:c- 0 I- a m m O O ° J w a ,n m ter N N N 61-• R Z Y w a 0 a cc Q O cc v o J m V Q LL O ° O o o E. O tp O re w ro N m w m r--up N N K to N in- u V U Z 0 C N Q u u1 V t0 vt L K 9 y 01 O 5 Ol p t o o E v1 'r , N Yi ° till Z , N � a ` of V z3P3 a �, o cC oY u 0 " u `o ..c o m _u J V '' J u t T w v = v' . a -0 u Z rnD w Z -0 LE, mv2 ri 322 ti ° ' N° N U- U tL Y CITY HALL 215 Church Avenue P.O_Bo 1130 Oshkosh,Wisconsin 540031130 City of Oshkosh OJHKOJH TO: Honorable Mayor and Members of the Common Council FROM: Jon G. Urben, General Services Manager DATE: May 18, 2015 RE: Bid Award-24th Avenue Boat Launch Restroom Renovation BACKGROUND The Common Council allocated $80,000 in the 2014 CIP Park Improvements to renovate the restroom facility at the 24th Avenue Boat Launch. The city hired HGM Architecture, Inc. to coordinate designs and bid specifications. The renovation includes updates to the masonry/concrete, plumbing and plumbing fixtures, doors, windows and thermal/moisture protection. In addition, the bid specifications provided an alternate for replacing the current flat roof with a new pitched roof that is better for water runoff and would make the aesthetics of the restroom facility more consistent with other park restrooms. ANALYSIS Working in conjunction with the project architect and Parks Department personnel, Purchasing reviewed and prepared bid specifications for the new restroom/shelter building. Bids were advertised in the local paper. The bids were opened on May 14, 2015. The bid tab is attached. After reviewing the bids, it is the consensus of the project architect and city staff that the low bid from Capelle Bros. & Diedrich Inc. met the minimum bid specifications for this project. In addition, because of Capelle's competitive bid, and because replacing the flat roof with a pitched roof will extend the replacement schedule for this roof, it is the recommendation of the project architect and staff that the roof alternate replacement be included within this renovation. FISCAL IMPACT The combined total fiscal impact of the renovation bid and roof replacement ($82,440), electronic door strikes/locks ($2,900) and architectural fees ($4,800) is $90,140. This project was budgeted in the 2014 CIP Park Improvements at $80,000 and will be charged to A/N#: 325-0610-7214-07503. The overage for this project ($10,140) will be funded by the 2015 Roofing/HVAC CIP budget. There are sufficient funds in the Roofing/HVAC CIP for this project which will be charged to A/N#: 323-0130-7214- 06535. RECOMMENDATION The project architect and City staff recommend this bid be awarded to Capelle Bros. & Diedrich, Inc. for $82,440. Respectfully Submitted, Approved: (IL ,yea_ Jon G. Urben, General Services Manger Mark A. Rohtoff, City Manager