HomeMy WebLinkAbout12. 15-250 MAY 26, 2015 15-250 RESOLUTION (CARRIED____6-0___ LOST _______ LAID OVER _______ WITHDRAWN _______) PURPOSE: APPROVE CHANGE ORDER NO. 3 FOR PUBLIC WORKS CONTRACT 13-08 WITH MIRON CONSTRUCTION CO., INC. FOR THE PUBLIC WORKS FIELD OPERATIONS FACILITY (+$98,012.36) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: MIRON CONSTRUCTION CO., INC. 1471 McMahon Drive Neenah, WI 54956 Net Increase to contract: $98,012.36 PURPOSE: See attached Change Order. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. No. 323-0450-7214-06510 Property Improvement Fund – Central Garage RECEIVED ® MAY 1 3 2015 )�'AIA Document G701ra — 2001 DEPT OF YI_.ki.IC WORKS OSHKOSH-'\\ i sc.ONSIN Change Order PROJECT(Name and address): CHANGE ORDER NUMBER:003 OWNER CITY OF OSHKOSH DATE:5/82015 ARCHITECT:Z 639 WITZEL AVENUE OSHKOSH,WI 54902 CONTRACTOR:❑ TO CONTRACTOR(Name and address): ARCHITECT'S PROJECT NUMBER: FIELD:❑ MIRON CONSTRUCTION CONTRACT DATE:July 17th 2013 1471 MCMAHON DRIVE CONTRACT FOR:General Construction OTHER❑ NEEHAN,WI 54956 THE CONTRACT IS CHANGED AS FOLLOWS: (Include,where applicable,any undisputed amount attributable to previously executed Construction Change Directives) The original Contract Sum was S 14,052,771.00 The net change by previously authorized Change Orders $ -2,826,054.61 The Contract Sum prior to this Change Order was S 11,226,716.39 The Contract Sum will be increased by this Change Order in the amount of $ 98,012.36 The new Contract Sum including this Change Order will be $ 11,324,728.75 The Contract Time will be increased by Zero(0)days. The date of Substantial Completion as of the date of this Change Order therefore is NOTE:This Change Order does not include changes in the Contract Sum,Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor,in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. KUENY ARCHITECTS,1-LC MUtON CONSTRUCTION CITY OF OSHKOSH DPW ARCHITECT(Firm name) CONTRACTOR(Firm name) OWNER(Firm name) 10505 •• •TE DRIVE, STE 100, 1471 McMAHON DRIVE 215 CHURCH AVNUE PLE• )a l; I , WI 53158 NEEHAH WI 54956 1 OSHKOSH,WI 54903-1103 AD Off AD.O /J ADDRESS �.-_/ / BY(Si/ •tore) = (Sr ame) � BY(Sigrwture) JO WALLENKAMP David G.Voss Jr.,Pre-.ert (Typed name) (Typed name) (Typed name) May 8,2015 DATE DATE DATE MA Document 3701 tv-2001.Copyright 01979,1987,2000 and 2001 by The American Institute of Architects.MI rights reserved.WARNING:This MAs Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or disttibution of this NA,Document,or any 1 portion of N,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.This document was produced by AIA software at 13:45:29 on 05/06/2015 under Order No 4620217239_1 which expires on 0411412016,and Is not for resale. User Notes! (2001680216) Signed for and in behalf of the City of Oshkosh Mark A. Rohloff, City Manager Pamela R. Ubrig, City Clerk Lynn Lorenson, City Attorney Trena Larson,Director of Finance I hereby certify that the necessary provisions have been made to pay the liability which will accrue under this contract. IA Oshkosh DPW-April 1,2014 Change Proposals from Miron Date POOP Amount Credit Description Requested/Required $110,861.54 Saving for elimination of sales tax. CilB TAU ttedtretti i '{ r Request for contractor to provide owners&contractors protective -aye 11/20/2013 1 Rev $17,161.10 liability for the City of Oshkosh. Cit -q' s, LSf =v .,• Electric division requested for low 9/17/2013 3 5448.00 Install conduits for future use to fiber/phone. voltage 10/16/2013 5 $4,569.25 Deleting 149'of 6"sanitary pipe and sanitary manhole#1 RFI#5. David deleted 10/29/2013 7 $2,741.00 Credit to delete six hand dryers,circuits and conduits. Kevin deleted 10/15/2013 8 $1,08900 Credit for deleting video screen in the Lunch/Training Room. Kevin deleted screen 11/8/2013 10 $319.70 Cost saving for using 12 55 Super Saver Model Light fixtures at fuel island. Change in tight fixtures Furnish electrical panels for vehicle fueling station-Use for future salt 2/25/2014 13 $38,503.00 storage structure. Part of salt Bid not taken 1/22/2014 15 $276.00 Delete the floor drain in the welding bay base. Kevin requested Install(2)4"conduits and(2)2"conduits from the future CNG station to 1/22/2014 16 $3,951.00 the fuel island center islands. Required for future CNG 12/17/2013 17 $1,443.00 Add Drip pan and Condensate liner to inside condensing units. Manufacture recommendation Provide(22)Circuit breakers at 35 KVA in panel PP1 and PP4 per 12/18/2013 19 $3,208.00 coordination study upon selection of emergency generator. Generator required 1/8/2014 21 $411.00 Moving sink from laundry Room#119 to Support Room#120. Kevin requested 1/13/2014 24 5954.00 Increase overhead doors to 18'from 16'-two openings. Kevin requested 2/4/2014 25 5335.00 Change flooring in RM 101 to polished concrete in lieu of carpet. Kevin requested 3/10/2014 26 $881.00 Change flooring in shower area from polished concrete to epoxy. Added for better finish Revisions to site elec.,storm water&fencing,office area,vehicle 3/17/2014 27 $5,405.00 parking,weld bay and small engines. See attached site plan/plan 2/27/2014 30 Rev $4,418.00 Provide concrete stain in rooms,101-106,109-110&112. City requested in noted rooms Credit for countertop icemaker&associated piping/wiring in vending 3/4/2014 31 $2,605.00 113. Kevin deleted 3/11/2014 34 $496.00 Provide card access at each gate-in lieu of fuel master units. Architect changed-better system Update the new fuel control system from 60 5martcards to 500 3/14/2014 37 Rev $2,783.00 specialized keys. City needed more keys then spec'd ' Subtotal $79,901.10 $122,957.49 Total Credit/Allowance in Mirons Contract Change Order 02 I $43,056.39 (Credit/Allowance to Remain in Miron Contract Approved a m o 0 o a a or o e o n o n n wa a co o No U N N N N N o O 0 0 o O O O O O a 0 0 N 0 O N 0 of 0 E a o O a O O 0 0 0 0 0 0 0 N 0 0 0 0 m 0 0 W 0 0 a 0 O °i N o m o 0 o O o 0 o ei o .-, b o 0 m ry N o a o m o o °i ry rei u3 a 6 e a .+ ti E o ^ i° N n m `O N m o vi N o m m ao .-1 M < N 'i a a a N .<.1 P N m N N N a N N N N v N N in N N N N N N N N N N in N N 9 to c N q O . A a L E A O C_ v O a N Q D O I O O« 9 y u a o al o E o `m - o a ^' w a n y 33 a O aZ 9 0 IIIW a d a o° — w n o A a u e�.140 E a 3 mx u >•+ c v a y .n m a r d o j C O o 9 W a _ 9 _ c ra a `o °c v = N a a a .10. m a en a .o .n n 'u N :n v m n v c ti D a o c CL v O. a ET C n a a v m E al N a , V > •c `m CI O. m v g a " '° m a a 0 . i o a re `ov o - o- a o m > M m m N ,` c - o cri d• y `m c o a o n °�' v a s v « m' .. '° c c g '" c ro j __ c c -at s a n vi oo N C v, ` u c c ,_ - '� as Z _re E Z d o v - s_' a n o 115 a s n ^' a m '^ .. ° „ i U, t - m E N .. a n \ ' -o a ry m v L a N a m W m o n = 3 a us ur y -o i urn a q E '�^ N .°i '`O .. ti n v v $ a 3 0 0 .n LO .. o u m m ° P „ - ° r a `o o a ° o c c ° - o 0 v o o n f Sim °• o' $ E ao = ` N m g m 9 o c _ n - N L ur i a > v - - o at mac Les in x .c _ ▪ o 0 ,- N - - - 0. 0.. 0 n - n u - o n $ s ru a .y m - a ._ n f ` r ° N ° n °° n 3 ac i ° " f0 a „ co .-1 •• a �, r v IS E E .. v >> -- i c v N P. c m y y m « o o °1 v c o �.`- v '; E '° n o a m LL m ° E o w g n m '. v 'n c 'n m « 'LL" 3 0 ° " ; a N n p .a. Q c E o N `o o M m c m • y a t" _ .o°` E y 'n u a q ° v a v m m `o -Co _ a° u ▪ c .10e a c c 0o m - ` 0, m « m « t .a « a m « c E o a c m m° m m '^ q > - 0 - m ` • `o c c c c c _c ° E 9 ; o E vl w c t a .v. ) E ,- c E 3 a °. '- c -c n a• E t. t 0 E c = H .�° 7 7 5 - n v ° A a o 0 0 E _ `. m m « o ; . c Z' m n 03 `m u m a d s c m ,A„ ¢ v v v v q E E.e 51 .. .. .. rt o -c a m - a 'n a = s te r g y m s al t m E ' ,a,, ` v -o .. '> E . c c t m .° > c '> `n m o o « E a E 2 c c ou _cr ,n uu` > > > E � et LLo UUU n aw LLau = aen a - LL3LL i. u: riLL LL O m2 N J ti O N N m O OI k a .N o °o o o °ry v 0 .v c o . n N N O m CC O U NNN : U N 0 O W O 10 I N O Vml Of N N O M O m M N 'I C 6 N _ V O m 'n o co o a ` m Q a g N .i 'i m fi N I :. N o N N N N N Q V a L '. i DTI: • H ON THE WATER MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Steven M. Gohde, Interim Director of Public Works " "5 DATE: May 21, 2015 RE: Change Order No. 3 for Public Works Contract No. 13-08 Public Works Field Operations Facility Miron Construction Co., Inc. (Miron) (+$98,012.36) BACKGROUND In July of 2013, the Common Council awarded a bid to Miron for construction of the new Public Works Field Operations Facility. In addition, Change Order No. 1 was approved in November of 2013 to allow the City to purchase the building materials for this project as a way to eliminate the expense for the State of Wisconsin sales tax. Change Order No. 2 was approved in April of 2014 to process various changes that were required as part of the first phase of this project. ANALYSIS Change Order No. 3 is required to process various changes that were required as part of the first phase of this project. These changes were required for the following reasons: 1. Addition of fluid delivery system to project. The City Manager added this equipment to the project because installation would be less costly if done during this phase of work. 2. To address changes in specifications. 3. To address changes in plans due to site conditions. 4. To provide upgrades to specified items to improve compatibility with existing equipment and to improve operations. FISCAL IMPACT The original contract amount was for $14,052,771. The net impact of the previous change orders decreased the Miron contract by $2,826,054.61. Change Order No. 3 is for $98,012.36. The revised contract price with this change order is $11,324,728.75. This project is included in the 2013 and 2014 Capital Improvements Program under the Property Improvements section. RECOMMENDATIONS I recommend approval of Change Order No. 3 to contract 13-08 in the amount of +$98,012.36 to Miron Construction Co., Inc. Approved, Mark A. Rohloff City Manager SMG/lIt I:%Engmeenng113-08 PW Field Ops Fac\Progtl-Inlormallw1C res ndav∎Meme\13-08 Memo for CO#3_521-15 doa