HomeMy WebLinkAbout14. 15-252
MAY 26, 2015 15-252 RESOLUTION
(CARRIED___6-0_____LOST________LAID OVER________WITHDRAWN________)
PURPOSE: APPROVE ENGINEERING SERVICES AGREEMENT WITH AECOM
TECHNICAL SERVICES, INC. FOR DESIGN OF LIBBEY/NICOLET
WATERSHEDS NORTH MAIN STREET AREA STORM WATER
DETENTION BASIN ($189,600.00)
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
BE IT RESOLVED by the Common Council of the City of Oshkosh that the proper
City officials are hereby authorized to enter into and take those steps necessary to
implement an appropriate professional services agreement with AECOM Technical
Services, Inc. for design and bidding support services related to the Libbey-Nicolet North
Main Street Area Detention Basin in the amount of one hundred eighty-nine thousand six
hundred dollars ($189,600.00)
Acct. No. 561-2010-1799-00000 Storm Water Utility – Construction in Progress
n
ON THE WATER
011-KOIH
MEMORANDU
TO: Honorable Mayor and Members of the Commo' i
FROM: James Rabe, Civil Engineering Superviso,
DATE: May 21, 2015
RE: Engineering Services Agreement for Libbey-Nicolet North Main Street Area Storm Water
Detention Basin Design Services
AECOM Technical Services, Inc. (AECOM) ($189,600)
BACKGROUND
AECOM began the watershed-wide storm water management plan analysis for the Libbey Avenue and
Nicolet Avenue Watersheds in 2009. In 2010, the Department of Public Works began implementing flood
reduction projects within the watersheds with the construction of the Oshkosh North High School Area
Wet Detention Basin. Acquisition of the land necessary for the construction of the North Main Street Area
Detention Basin began in 2012. The construction of the North Main Street Area Detention Basin is
expected to occur in 2016.
ANALYSIS
The Department of Public Works has requested a proposal from AECOM to provide design and bidding
support services for the Libbey-Nicolet North Main Street Area Detention Basin. AECOM was chosen
due to their staff familiarity with the City of Oshkosh, the Libbey-Nicolet Watershed, and previous work
within this watershed.
FISCAL IMPACT
The cost of the proposal is $189,600. Funds for this project are included in the Storm Sewer section of
the 2015 Capital Improvement Program.
RECOMMENDATIONS
Chapter 12 of the Municipal Code of the City of Oshkosh provides that professional services of a
specialized nature, including engineering services, may be procured without the use of formal, sealed
quotes. I have reviewed the proposal and in accordance with Section 12-16 of the Code, I am hereby
recommending that the Common Council approve this agreement.
Approved,
Mark A. Rohloff
City Manager
JERnn
IEpineenng @015 CONTRACTS\1518 Libbey Wtrsted-N Main St Nee Del Basin-Desi nPRgect_IMOmialiOn\CO,respondenceMemo115-18 AECOM Memo-Libbey.Nimlel N
Main SI(Yea Del Basin Des 5-21.15 docx