Loading...
HomeMy WebLinkAbout34972 / 88-184 July 2l, 1988 # 7g4 RESOLUTION (CARRIED LOST LAID OVER WITHDRAWN ) PURPOSE: ACCEPT AND FPPROVE WAIVER OF SPECIAL ASSESSMENT NOTICES AND HEARING IN CONNECTION WITH IMPROVEMENTS INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLUED by the Common Council of the City of Oshkosh that the Waiver of Special Assessment Notices and Hearing under Section 66.60 of the Wisconsin Statutes, for concrete paving and concrete sidewalk, for the premises described below is hereby accepted and approved: Descriotion � Premises � Luebke Plat , Lots 1-4, 6-10 (9 Lots) BENEFITS DAMAGES Sanitary Sewer 57,800 .00 x 88 Eng . _ 58,424 .00 Cost/LOt= 58,424 .00/9 5936 .00/LOt NONE Laterals 5535 .00 x 88 Eng . _ 5577 .80 COSt/LOt= 5577 .80 5577 . 80/LOt NONE Water Main 511 ,895 .00 x 88 Eng . � 512,846 .60 COSt/LOt 512.846 .60/9 51 ,427 .60/LOt NONE Storm sewer � Developer Cost = Assessment + Rear Drains + Storm Laterals = 510 ,168 .61 Cost/LOt 510 ,168.61/9 51 ,129 .85/Lot NONE SOBNITTED HY _ Zg _ APPROVED ,WJ� ' � July 21, 1988 #184 - Cont'd. G=ading a Graveling 510,400.00 x 88 Eng . � 511�232 .00 Cost/LOt $11 ,232 .00/9 51 ,248 .00/LOt NONE Conccete Paving 529,900 .00 x 88 Eng . _ 532,292.00/9 Cost/LOt 532 ,292 .00/9 53 ,588.00/Lot NONE Sidewalks LOt 1 $1 ;703 .00 NONE Lot 2 S 684.00 NONE Lot 3 S 366 .00 NONE , Lot 4 S 495 .00 NONE LOt 6 S 366 .00 NONE Lot 7 $1,076 .00 NONE Lot 8 81,722 .00 NONE Lot 9 5 746 .00 NONE LOt 10 ' S 995 .00 NONE Descriotion Qf Premises . Graceland Plat (71 Lots) BENEFITS DAMAGES Sanitacy Sewec 586 ,961 .00 x 88 Eng . _ 593 ,918.00 Cost/LOt $93 ,918.00/71 51 ,322 .79/LOt NONE Sanitary & water Latecals 5540 .00 x 88 Eng . _ 5583 .20 COSt/LOt 5583 .20 5583 .20/LOt NONE Water Main 593 ,834 .00 x 88 Eng . _ 5101 ,340 .72 Cost/LOt 5101 ,340 .72/71 51,427 .33/LOt NONE Storm Sewer Developer Cost = Assessment + Rear Yard Drains + Storm Laterals 558,543 .88 Cost/Lot 558 ,543 .88/71 5624 .56/LOt NONE - 28a - ' ' July 21 , 1988 #184 Cont'd. Grading S Graveling 570,866.00 x 88 Eng . _ 876�535 .28 Cost/LOt 576,535 .28/71 $1,077.96/Lot NONE Conccete Paving 5226,377 .50 x 88 Eng . _ 5249 ,487 .70 Cost/LOt 5244,987.70/71 53,443 .49/Lot NONE Sidewalk Lot 1 $ 645 .00 NONE Lot 2 S 762 .50 NONE Lot 3 51 ,929 .38 NONE LOt 4 S 680 .00 NONE Lot 5 $ 721 .25 NONE LOt 6 S 771 .25 NONE Lot 7 $ 721 .25 NONE Lot 8 $ 721 .25 NONE Lot 9 ` 51 ,850 .43 NONE Lot 10 $ 882 .13 NONE Lot 11 S 717 .13 NONE Lot 12 S 431 .43 NONE Lot 13 S 468 .14 NONE Lot 14 5 762 .50 NONE Lot 15 51 , 853 . 40 NONE Lot 16 51 ,958.75 NONE Lot 17 S 737 .75 NONE Lot 19 $ 601 .79 NONE LOt 19 S 433 .00 NONE Lot 20 S 486 .13 NONE Lot 21 5 �436 .79 NONE Lot 22 5 737 .75 NONE LOt 23 S 737 .75 NONE Lot 24 $2 ,206 .25 NONE Lot 25 SZ �Z05 .84 NONE Lot 26 S 680 .00 NONE Lot 27 $ 680 .00 NONE Lot 28 5 680 .00 NONE Lot 29 S 680 .00 NONE Lot 30 $ 680 .00 NONE Lot 31 S 680 .00 NONE Lot 32 52 ,205 .84 NONE Lot 33 52,413 .24 NONE Lot 34 52;076 .98 NONE Lot 35 5 645 .93 NONE Lot 36 S 425 .24 NONE Lot 37 S 400 .74 NONE Lot 38 S 492 .81 NONE Lot 39 51 ,880 .79 NONe Lot 90 $ 721 .25 NONE Lot 41 S 721 .25 NONE - 28b - 2 . July 2l , 1988 kl84 Cont'd. . � Lot 42 51 ,436 .28 NONE Lot 43 S 874.12 NONE LOt 44 b 680 .00 NONE . Lot 45 S 680 .00 NONE Lot 46 � 5 680 .00 �- NONE Lot 47 5 - 680 .00 NONE Lot 48 S 680 .00 NONE Lot 49 $ �680 .00 NONE Lot 50 S 680 .00 NONE LOt 51 51,835 .00 NONE Lot 52 $ 721 .25 NONE Lot 53 S -721 .25 NONE Lot 54 S 721 .25 NONE LOt 55 S 721.25 NONE Lot 56 S 721 .25 NONE LOt 57 S 762.50 NONE Lot 58 S 721 .25 NONE Lot 59 5 680 .00 NONE Lot 60 5 680 .00 NONE -� Lot 61 S 680 .00 NONE Lot 62 S �680 .00 NONE Lot 63 � S 721 .25 NONE Lot 64 5 721 .25 NONE Lot 65 S 963 .72 NONE Lot 66 S 988 . 47 NONE Lot 67 S 620 .35 NONE Lot 68 S 567 .11 NONE Lot 69 5 � 587 .11 NONE Lot 70 S 680 .00 NONE LOt 71 51,463 .75 NONE Description Qf Pcemises Fisrt Addition to Shadow Creek , Lots 26 thcu 61 (36 Lots) BENEFITS DAMAGES Sanitary Sewer 540 ,735 .00 x 68 Eng . _ 543 ,993 .80 Cost/LOt- 543 ,993 .60/36 51 ,222 .05/LOt NONE Sanitary S Water Lateral 5540 .00 x 88 Eng . _ 5583 .20 Cost/LOt= 5583 .20 5583 .20/Lot NONE Watee Main 595 ,509 .00 x 88 Eng . _ 549 ,149 .72 Cost/LOt= 549 ,149 .72/36 $1 ,365 .27/LOt NONE Developer Cost = Assessment + � Reac Drain + Stocm Laterals - Credit from ociginal plat 512 ,385 .51 Cost/LOt= 512,385 .51/36 5344 .04/LOt NONE - 28c - ' July 21 , 1988 #184 Cont'd. Calculate actual cost paid by developer for all stoem sewe� excluding rear yard drains and storm laterals 518,573 .00 Rnaus Construction S 7 ,670 .00 R & J Excavating +S 1,129.85 R & J Excavating (Extra Work) 527,372 .85 Total Paid -5 8,850 .00 Assessment due to frontage 518,522 .85 Credit due to over-payment Detecmine cost for First Addition to Shadow Creek (Costs based on Contract 88-10 prices) Developer Cost = Assessment + Reae Drain + Stocm Laterals Assessment = SS x Footage measuced at buidling setback line = SS x 3 ,019 = 515,095 Rear Drains (4 inlets plus leads) Construction Cost = S 7 ,362 .00 86 Engineering = S 588 .96 Total Cost S 7 ,950 .96 Storm Lateeals Stoem latecals installed to 28 Lots, remaining lots can connect dicectly to �eac dcains . Constcuction Cost = S 7 ,280 .00 88 Engineecing = S 582.40 Total Cost S 7 ,862 .40 Developer Cost = S 15 ,095 .00 S 7,950 .96 S 7,862 .40 Total Cost S 30 ,908 .36 -S 18,522.85 Credit from original plat Adjusted Total Cost S 12,385.51 Cost/LOt = S 12 ,385 .51/36 �� = 3 344.04 - 28d - '. � , Res. #184 WAIVER OF SPECIAL ASSESSMENT NOTICES AND BEARING UNDER SECTION 66 .60� WISCONSIN STAT[JTES The undersigned , owner of pcopecty benefited by the following improvements to be made by the City of Oshkosh, Winnebago County, state of Wisconsin, to wit: ENGINEERING SERVICES� SANITARY SEWER� WATER MAIN� LATERALS� GRADING & GRAVELING� CONCRETE PAVING� STORM SEWER� AND CONCRETE SIDEWALR . In consideration of the constcuction of said improvements by the City of Oshkosh, wisconsin, I heceby admit that such public impcovement will benefit said property and consent to the levying of special assessments against the premises under Section 66.60 of the Wisconsin Statutes for the cost of such impcovements. In acco=dance with Section 66.60 (18) of the Wisconsin Statutes, I hereby waive all special assessment notices and heacings required by Section 66.60 of the Wisconsin Statutes; and i further agree and admit that the benefit of my property from the construction of such improvements is in proportion to the footage thereof: . Descciotion of Premises � Luebke Plat, Lots 1-4, 6-10 (9 Lots) BENEFITS DAMAGES Sanitary Sewer 57,800 .00 x 88 Eng . _ 59,424 .00 Cost/LOt= 58,424 .00/9 5936 .00/LOt NONE Laterals 5535 .00 x 8� Eng . _ 5577 .80 COSt/LOt= 3577 .80 5577 .80/LOt NONE Watec Main 511 ,895 .00 x 88 Eng . _ 512,846.60 Cost/LOt 512,846 .60/9 51,427.60/i.ot NONE Storm Sewer Developer Cost = Assessment + Rear Deains + Storm Laterals = 510 ,166.61 Cost/LOt 310,168 .61/9 51 ,129 .85/Lot NONE - 28e - 1 �� � � REs. ki64 Gcading 6 Graveling 510,400.00 x 88 Eng. _ 511�232 .00 Cost/LOt 311,232.00/9 51,248.00/LOt NONE Concrete Paving 529,900 .00 x 8fi Eng . _ 532,292.00/9 Cost/LOt 532 ,292 .00/9 53,588 .00/Lot NONE Sidewalks Lot 1 51,703 .00 NONE Lot 2 S 684.00 NONE Lot 3 5 366 .00 NONE Lot 4 $ 495 .00 NONE Lot 6 S 366 .00 NONE Lot 7 51,076 .00 NONE Lot 8 $1 ,722 .00 NONE Lot 9 S 746 .00 NONE Lot 10 ' S 995 .00 NONE Signature of Owner DOROTE3Y LUEBRE Stceet Address City Date: - 26f - 2 � � Res. #184 WAIVER OF SPECIAL ASSESSMENT NOTICES AND HEARING UPIDER SECTION 66 .60� WISCONSIN STATUTES The undersigned , ownec of propecty benefited by the following impcovements to be made by the City of Oshkosh, Winnebago County, state of Wisconsin, to wit: - ENGINEERING SERVICES� SANITARY SEWER� WATER MAIN� LATERALS� GRADING fi GRAVELING� CONCRETE PAVING� STORM SEh'ER� AND CONCRETE SIDEWALR . � In considecation of the construction of said improvements by the City of Oshkosh, Wisconsin, I hereby admit that such public improvement will benefit said property and consent to the levying of special assessments against the premises undee Section 66.60 of the Wisconsin Statutes for the cost of such impzovements. In accocdance with Section 66.60 (18) of the Wisconsin Statutes, I hereby waive all special assessment notices and hearings required by Section 66.60 of the Wisconsin Statutes; and i furthec agcee and admit that the benefit of my property from the constcuction of such impcovements is in proportion to the footage theceof. Descriotion �f Premises � Graceland Plat (71 Lots) BENEFITS DAMAGES Sanitary Sewer 386,961 .00 x 88 Eng . _ 593 ,918 .00 Cost/LOt 593,918.00/71 51,322 .79/LOt NONE Sanitary & Water Laterals 5540 .00 x 8$ Eng . _ 5583 .20 Cost/LOt 5583 .20 $583 .20/LOt NONE Water Main 593,834 .00 x 88 Eng . _ 5101 ,340 .72 Cost/LOt $101,340 .72/71 51,427 .33/LOt NONE Storm Sewer Developer Cost = Assessment + Rear Yard D�ains + Stocm Laterals 558,543 .88 Cost/LOt $58 ,543 .88/71 5824 .56/LOt NONE - 28g - 1 � � Res. #184 Grading 6 Gcaveling 570,866 .00 x 8S Eng . _ 576,535 .28 Cost/LOt 576 ,535 .26/71 51,077 .96/LOt NONE Concrete Paving 5226,377.50 x 68 Eng . _ 5244,487 .70 Cost/LOt 5244,487 .70/71 53,443 .49/LOt NONE Sidewalk Lot 1 S 845 .00 NONE Lot 2 S 762.50 NONE Lot 3 51 ,929 .38 NONE LOt 4 $ 680 .00 NONE Lot 5 $ 721 .25 NONE Lot 6 S 771 .25 NONE Lot 7 S 721 .25 NONE Lot 8 S 721 .25 NONE Lot 9 ' $1 ,850 .43 NONE Lot 10 $ 882.13 NONE Lot 11 S 717 .13 NONE Lot 12 $ 431 .43 NONE Lot 13 S 468 .14 NONE Lot 14 S 762 .50 NONE Lot 15 51,853 .40 NONE Lot 16 51,958.75 NONE Lot 17 $ 737 .75 NONE Lot 18 S 601 .79 NONE Lot 19 S 433 .00 NONE Lot 20 $ 486 .13 NONE Lot 21 $ 436 .79 NONE Lot 22 $ 737 .75 NONE Lot 23 $ 737 .75 NONE Lot 24 52,206.25 NONE Lot 25 52�205 .84 NONE Lot 26 S 680 .00 NONE Lot 27 S 680 .00 NONE Lot 28 S 680 .00 NONE Lot 29 S 680 .00 NONE Lot 30 $ 680 .00 NONE Lot 31 S 680 .00 NONE Lot 32 $2,205.84 NONE Lot 33 52,413 .29 NONE Lot 34 52,076 .48 NONE Lot 35 S 645 .93 � NONE Lot 36 S 925.24 NONE Lot 37 S 400 .74 NONE Lot 38 S 442.81 NONE Lot 39 91,880 .79 NONE Lot 40 $ 721 .25 NONE � Lot 41 S 721 .25 NONE � - 28h - 2 . � ' . Res. #184 Lot 42 31 ,436 .28 NONE Lot 93 $ 674.12 NONE Lot 49 8 680.00 NONE . Lot 45 $ 680.00 NONE Lot 46 � S 660 .00 — NONE Lot 47 S 680 .00 NONE Lot 48 S 680 .00 NONE Lot 49 S 680 .00 NONE Lot 50 S 680 .00 NONE Lot 51 $1,835.00 NONE Lot 52 5 721 .25 NONE Lot 53 $ 721 .25 NONE Lot 54 S 721 .25 NONE Lot 55 S 721.25 NONE Lot 56 S 721 .25 NONE Lot 57 S 762.50 NONE Lot 58 5 721 .25 NONE Lot 59 S 680 .00 NONE Lot 60 S 680 .00 NONE Lot 61 S 680 .00 NONE Lot 62 $ 680 .00 NONE Lot 63 ` $ 721.25 NONE Lot 69 $ 721.25 NONE Lot 65 $ 963 .72 NONE Lot 66 S 988 .47 NONE Lot 67 S 620 .35 NONE Lot 68 $ 587 .11 NONE Lot 69 S 587 .11 NONE Lot 70 S 680 .00 NONE Lot 71 $1,463 .75 NONE Signature of Owner RONALD C. LEICHTFUSS Street Address City Date: � - 28i - � . . . , z , ' � Rs. #184 WAIVER OF SPECIAL ASSESSMENT NOTICES AND HEARING UNDER SECTION 66 .60 , WISCONSIN STATUTES The undersigned , owner of property benefited by the following improvements to be made by the City of Oshkosh, Winnebago County, state of Wisconsin, to wit: ENGINEERING SERVICES� SANITARY SEWER� WATER MAIN� LATERALS� GRADING & GRAVELING� CONCRETE PAVING� STORM SEWER AND CONCRETE SIDEWALR . In consideration of the construction of said improvements by the City of Oshkosh, Wisconsin, I hereby admit that such public improvement will benefit said property and consent to the levying of special assessments against the premises undec Section 66.60 of the Wisconsin Statutes foc the cost of such impcovements. In accozdance with Section 66.60 (18) of the Wisconsin Statutes, I hereby waive all special assessment notices and heacings cequired by Section 66.60 of the Wisconsin Statutes; and i furthec agree and admit that the benefit of my property fcom the construction of such improvements is in propoction to the footage theceof: uescription of Premises Fisxt Addition to Shadow Creek , Lots 26 thru 61 (36 Lotsl BENEFITS DAMAGES Sanitary Sewer 540 ,735 .00 x 88 Eng . _ 543 ,993 .80 Cost/LOt- 543,993 .80/36 51,222 .05/LOt NONE Sanitary & Watec Lateral 5540 .00 x 8� Eng . _ 5583 .20 Cost/LOt= SSB3 .20 5583 .20/LOt NONE Water Main 545 ,509 .00 x 88 Eng . _ 549,149 .72 Cost/Lot= 549,149 .72/36 51 ,365 .27/LOt NONE Developer Cost = Assessment + Rear Drain + Storm Latecals - Credit from original plat 512,385 .51 Cost/Lot= 512,385 .51/36 6344 .04/LOt NONE - 287 - ' • Res. #184 Calculate actual cost paid by developer for all storm sewer excluding rear yacd dcains and storm laterals 318,573 .00 Knaus Construction $ 7 ,670.00 R & J Excavating +S 1,129.85 R 5 J Excavating (Extra Work) 527 ,372 .85 Total Paid -S 8,850 .00 Assessment due to frontage 518,522 .85 Credit due to ovec-payment Determine cost for Ficst Addition to Shadow Cceek (Costs based on Contract 88-10 prices) Developer Cost = Assessment + Rear Dcain + Stoxm Latecals Assessment = SS x Footage measured at buidling setback line = SS x 3 ,019 = 515,095 Rear Drains (4 inlets plus leads) Consteuction Cost = 5 7 ,362.00 88 Engineecing = 5 588.96 Total Cost S 7 ,950 .96 Storm Laterals Storm laterals installed to 28 Lots, remaining lots can connect directly to rear drains. Construction Cost = S 7,280 .00 88 Engineering = S 582.40 Total Cost S 7 ,862.40 Developer Cost = & 15 ,095 .00 S 7 ,950 .96 S 7 ,862 .40 Total Cost S 30,908.36 -S 18,522.85 Credit from original plat Adjusted Total Cost S 12,385.51 Cost/LOt = 3 12,385 .51/36 = S 344.04 - 28k - 2 �_. : s � � ,' , , Res. #784 I Signatuce of Owner THOMAS N. ROSCH , Stzeet Address City Date: Signature of Ownec RICHARD L. GABERT Street Address City Date: - 28L - 3 � = � � N � LL � ¢ � N m h .Ci Y �F ' C O L N �O E i v ry N 2 > > O �+ � i v� � d C 3 v� E O W � ..� I� N V In > ..� L ..� F� Oi� i� > d (n L 0..� ..� ¢Z3a W pT o n rn ¢ ¢ ¢ ++ � � v c o in m w v ... � � N U j N Z W d ✓� N O O«+ mac ... �/1 U N C L .-�i F- 2' d' QQU �i r] � U