HomeMy WebLinkAboutAECOM ' A_/�A� AECOM 920235.02]0 tel
' ��������� 558 Nohh Main SVee� 920235.0321 hx
Oshkosh,Wiswnsin 54901
c—�--
� [_ RECENED ��
MqY 1 12015
DEPTOF' PUL�LIC WC)Itl;y
OSHKOSH, WIyCp�,$�N
May 8, 2015 "
Mr. Steve Gohde
Interim Diredor of Public Works
Ci�y of Oshkosh _
215 Church Ave.
PO Boz 1130
Oshkosh,WI 54903-1130
Subject:Proposal for Environmental and Engincering Services Rela[ed to the Former
Kienast and Paulus Quarties in Oshkosh,Wisconsin
AECOM Proposal No.OPP-376768
Dear Mr. Gohde,
AECOM Technical Services, Inc. (AECOM) is pleased to present this proposal for professional
environmental engineering services involved with lhe imestigalion and poten[ial mitigation of lan�ll
gas as a resWt of historical municipal waste placement in the Kienast and Paulus Quavies in
Oshkosh,Wisconsin. As discussed during a meeting behveen AECOM and City of Oshkosh
personnel on May 5, 2015, the scope of work presen�ed below represents the initial stages of a
more comprehensive evalua[ion of the municipal waste material in the quarries.
Project Understanding
The scope of work that follows has been developed based on our understanding o(the project
site and is based on several discussions with City staff. The proposed scope of work includes:
A. Interfacing with the W isconsin Department of NaNral Resources(W DNR)regarding
planned actions and potential mitigation activities;
B. Preparing materials for and participating in public mee�ings to inform adjacent property
owners of planned ac[ions and potential mitigation activities;
C. Irnestigating lhe viability of formerly installed gas monitoring wells and sampling the
wells for methane(if viable), and;
D. Assisting in the inves[igation of adjacent properties for the presence of landfill gas,
including review of surrounding construction, survey of lot corners, and coordination of
explosive gas surveys and installation of explosive gas monitors in adjacent properties.
rn�:aoc�mem��cwee:o�oa��e�n ee�m.i snan noi oe a�o�����,usea o�amomxa o�mae c���v or osnxosn m�,�y o�mo:e ome�
Man to evaluate Ihis tlocumanL Tnis rasViction aoes not limil Gty o(Osnkosb's ngM1t to use info�mauon conUlretl in IM1IS tlocumem R tt
is ob�aineE fmm ano��er source vdlM1ON ras�nction.
OPPd]6]BB Em�mM Su00oM1 ProOOUl.tlocx
� r�coM z
Scope of Services
Task A: Initial CortesDOndence wilh WDNR
AECOM will wordinate with appropriate members of the WDNR in advance of project kick-oft[o
determine the required regula�ory steps and agency involvement for lhe proposed scope of work
described below. The cost estimate for this task assumes that one in-person meeting with
appropriate WDNR staff will be needed.
Task B: Adiacent Landowner Enqaqement
AECOM will prepare drafl nol�ca�ion letters(to be finalized and sent out by the City of Oshkosh)to
adjacent landowners and atlend meetings with the adjacent landowners and City of Oshkosh staff
to present known information. This will inGude a discussion of the potential envimnmental
imestigation and potential landfll gas mitigation activities. AECOM will produce supporting visual
materials(or the meeting, including maps. AECOM will assist in the preparation of access
agreemenis([o be finalized and sen�out by the City o(Oshkosh)for the landowners to allow for the
below[asks[o be completed.
Task C: Investioate VabiliN of Existino Gas Wells
Three gas monitoring wells were previously installed in ihe area of lhe(ormer Kienas[Quarry.
AECOM will investigate whether[hese gas wells are still in place and are still viable. If the wells are
determined to be viable,AECOM will perform one initial round of sampling of the wells according to
the following procedure:
At each gas monitoring well, ini[ial percent of the lower explosive limit(LEL)of inethane(percent
LEL methane), percen[me[hane gas(percent methane), percent ozygen(percent Oz), percent ot
carbon monoxide(percent COi), and groundwater levels(if applicable)will be measured. The LEL
is the minimum conceniration of a particular combuslible gas or vapor necessary to support its
combustion in air. The LEL of inethane gas is 5% methane by volume. Observalions(such as
ground condition, barometric pressure, and moniloring well conditions)will also he recorded.
After initial readings are recorded, monitoring wells will be purged with a pump at a rate of two liters
per minute. Continuous percent LEL methane will be measured as the well is purged. A fnal
reading will be recorded when consecutive methane readings are within+10 h LEL. Final
measurements include percent LEL methane, percent methane gas, percent COz,antl percent Oz,
Task D�Assist with Investioation of Adiacent Procerties for Landfll Gas
In order to delermine whe[her any landfll gases are currently impacting adjacent properties,the
City of Oshkosh will complete an explosive gas survey and possibly install explosive monitors in
adjacent sirudures. This will include a review of the surrounding constmction, including utility lines
and wnnections to stmctures, the basement construction of the structures, and a survey of bt
comers. AECOM will aid the City in preparation of a work plan for the ezplosive gas surveys and
the installation of the explosive gas monitors.
Ux or Eiuiosure M Oab canlalnetl on Mis s1ieM Is suEjecl ro Ue restr'tion m Ihe first page INNis tlocumeM.
K:\PROPOSRL\Ciry N OsM1kosF\OPP3]6]fi8 2015 Em Ouam�SuDWMOPP3)6)88 Em puerry5uppotl PmposeLEoa
AECOM 3
Project Fees
The following table summarizes our estimate of fees to complete the scope of services described
above.
Service Estimated Cost
Task A— Initial Correspondence with WDNR $3,800
Task B—Adjacent Landowner Engagement $8,400
Task C—Investigate Viability of Existing Gas Wells $3,600
Task D—Assist with Work Plan Development(or Landfill Gas
Surveys ot Adjacent Structures $12,000
Total Estimated Cost bZ7,600
If changes to the proposed scope of services or services beyond the scope presented in this
proposal appear to be necessary, AECOM will consult with the City of Oshkosh and obtain
approval prior to initiating the work.
Projec[Assumptions
In order to complete the scope of work described above, this proposal assumes the following:
i) The WDNR will concur with the proposed scope of work.
2) Current landowners will grant AECOM and City personnel access to their properties�o
complete Tasks C and D.
3) AECOM will no�enter individual residents' living spaces during any of the lasks
described above.
4) AECOM will be held harmless from any claims made by surrounding landowners related
to presence of the landfll, gas migration, all hazards, and consequential damages.
Terms and Conditions
Services desaibed in this proposal will be peAOrmed on a time-and-ezpense/uni4cost basis. The
project services will be pertormed in accordance with the 2015 Negotiated Fee Schedule and the
- April 2009 Negotiated Terms and Conditions behveen AECOM and the City of Oshkosh, which are
expressly incorpora[ed into, antl are an integral part of, our contract for professional services.
Please indicate your aaeptance of this proposal by having authorized individuals of the City
execute the attached Authorization Form and retum it b our Oshkosh office. If you have any
questions regarding the proposed scope of services and corresponding costs, please contact us at
yourconvenience.
Use or EisGOSUre IN Oad canlaiMG on INS sliee�is su0Kc1 b Ne reSNCtion on ihe frsl page of�MS Eocumenl.
KWROPOSRL\CiryofOSM1kmM1\OPG-3]6]�]015Em0uaMSuOWmOPP-3]fi]69EnvWartySuDWM1Propovltlou
AECOM Q
OF wurse, if you wish to discuss the terms,conditions, and provisions of our proposal, we would be
pleased to do so.
SincQrey, � �����LE^'�°" 'v
/ /
:F�r.r
Cliff Shierk, PE chelle Freimund, PG
Projed Engineer Project Manager
��i` w � ���`�` a�,�,..,
Ibert Cole Jennifer Oberlino, PE �'v �
Senior Program Manager Vice President
Attachments:
Authoriza[ion Form
Fee Schedule
Uu or Elubsure M Ea�a conpinetl on t1�LS sliee�is wEKcl W Ne rPSMCtlon an iM fiM pape ot IMS Exumerrt.
K WROPOSAL1Ctly of OsM1kmM1\OPP3]6]6B ]f115 Em Ouarry Suppo�IWPP-31fi]68 Env Warry SuppoM1 Prapoul.tlou
A-M� AECOM 920.235.02]0 tel
' ��r�w�� 558 No�h Maln Slreet 920.235.0321 tax
Oshkosh,Wismnsin 54901
Authorization
May 8, 2015
I hereby certiy ihat the necessary provisions have been made to pay the liability which will accrue
under this wntrad.
I hereby au[horize AECOM to proceed with[he scope of work for the Environmental and
Engineering Services Related to the Former Kienast and Paulus Quarries in Oshkosh,Wisconsin,
as described in AECOM's proposal OPP376768 dated May 8, 2015, with a budget au[horization of
$27,600 under the general[erms and wnditions specfied in the proposal.
��-- ��r..� 5 �! �S
Sig Nre Date .
Mark A Rohloff
Pnnt Name
Ciry Manager
Title/Organization
`__ ..... � _ � .
U, �-f �-�f �
Signature Date ° '
Pamela R. Ubrig
Pnnt Name
City Clerk
Title/ r aniza6on
u - 4`l��S
Si n Date
Lynn A L renson
Pnnt Name
City Atlorney
TiUe/Or9aniuUon
!�ra.rko n�„-, 5. 13. 15
Signature Date
Trena Larson
Print Name
Director of Finance
Title/Organization
u�o�a.��wre aeam�m��ea o�N�snan m s�ei�ro me�v�mo�o�u�nrs�a.ce au�:aa��m.
K�PROP0.5AL\Gry W OsFkex�\OPP-31fi]�2015 Env Warry SuppoM1\OPP-3]6]fi8 Em Ouarty Supporl Proposal tlocz
AECOM 6
I agree to accept invoices from AECOM via e-mail and not postal mail:
� Yes
Signature:
E-mail address:
Recipient Mr.IMs.:
Retum to:
Name: Cliff Shierk
558 North Main Street
Address: Oshkosh, WI 54901
Fax: 920.235.0321
Phone: 920236.6718
Use or aiuAasure W aan conninm on mis sM1eet is subjatm ine restr'tion an ine first paga otNis axunrem.
K\GROPOSAL\CMa�M1kosM1\OPPd)fiifi8_2015 Env Warty SuppoM1�OPP3]6]fi8 Env puxny Supporl Pmppsxl Eou