HomeMy WebLinkAboutAECOM/AMEND 2 14-12 A_��1II AECOM 920.235.�2]0 lel
�~��V��� 558 North Main Slreel 92Q235A321 fax
Oshkosh,Wl Sa901
�_ - REC6l�ED - "
'=_.
APR 292015
DE?T UCjSH�V ISGONSIK',JS
March 78, 2015 pgE�K
Mr. Pete Gulbronson, Civil Engineer Supervisor
City of Oshkosh
215 Church Avenue
P.O. Box 1130
Oshkosh, Wisconsin 54903-1130
Subject: Amendment Request Number 2 tor Project Design, Specification Changes, anO
Additional Hydrologic Groundwater PermiHing, Relatetl To City Contrect 14-72,
Snell West Sanitary Pump SWtion, AECOM Project No. 60316513, City Resolution
Number 74-67
Dear Mr. Gulbronson,
AECOM Technical Services, Ina (AECOM)is requesting an amendment to[he agreement dated
February, 12, 2014, OPP-229722, and Amentlment No 1 dated July 25, 2014, for Design Services
related to this project This amendment request is for design and specification changes relatetl to
the addition of project work at the proposed West Snell Road Lift Station. The additions include:
• Abandonment of the Existing Snell Road LiR Station (prison);
• Addition of the Sanitary In[erceptor Sewer,
• Permit Motlifcations and Atlditional Hydrologic Subsurface Imestiqatiorc,
• Addition of Storm Sewer;
• Adtlressing Bidding Document Review Comments.
City Staff has requested that the abandonment of the Existing Snell Road Lift Station be added as
an altemale to the bidding documents. This work was added to accommodate abandonment of the
below ground lift station as it will no longer be requiretl once the sewer by pass and new intercepror
sewer are active. This alternate will allow cost effective abandonment of the lift sta[ion as a single
contrector will be responsible for the bypass work, list station abandonment and schedule. In
addition, no additional bidding documents will be requiretl.
The proposed West Snell Road Lift Station and Sani[ary In[erceptor Sewer projects have been
combined in an effort to reduce bidding document preparetioq permitting efforts, contractor
scheduling conFlicts, and project management efforts. The interceptor sewer will be designed by
Ciry staff
Results of the Hydrologic Study completed for the proposed West Snell Road lift Station indicate
that dewatering in excess of 6 million gallons per tlay will be occurring during the construction. In
additioq substantial tlewatering is anticipated during the installation of the Interceptor Sewer.
Because we anticipate that the interceptor sewer construction dewaterinq will be in ezcess of the 70
gallons per minute, the Wisconsin Department of Natural Resources(WDNR)will require a High
fi0318513 Am¢nOm¢nt2 031820154Ctz
AECOM 2
Capaciry Dewatering Permit. As a cost effective approach we plan to amend the existing permit
related to the proposed West Snell Road Lift Station. To complete the amendment additional
subsurtace and gmundwater information will be required. We propose to install four, new 6-inch
diameter groundwater wells on the south side of Snell Road belween Omni Drive and Vinland
Street. In addition, we budgeted to add a fifth well in case the su6surface conditions do not allow
the anticipated dewatering influence zone. These welis will provide the grountlwater dala requiretl
for the permit amendment In addi[ion we anticipate these wells will also be used by the Contractor
for dewatering during construction. 8y amentling the permit we anticipate reduction in permiriing
costs, consistency in dewatering efforts, providing the contractors with a uniform dewatering
approach !or bidtling purposes antl providing a reduction in the construction schedule.
The current High Capaciry Dewatering Permit requires a temporary 18-inch diameter water
discharge pipe be installed to the s[ream located several hundred feet west of the site. The
approximate cost of this temporary pipe is belween$25,000, antl $45,000. During tliscussions of
improving area dreinage the installation of permeant storm sewer to use as the tlewatering pipe was
selected. This stortn sewer will allow long term surtace tlreinaqe improvements to the area and will
shift the temporery dewatering pipe cost to a permeant infrestmcture improvement cost The storm
sewer will be tlesignetl by others.
During the bidding document preparetion, several discussions were had regarding potential
scheduling challenges for this project. Specifically, closure of Snell Road, bypass of Existing Snell
Road Lift station, installation of[he interceptor sewer, and mWtiple dewatering site specific efforts
were discussed. In summary, managing these issues can be reduced by wmbining all the phases
of work into one prqect and having one contractor responsible for managing the project schedule.
In addition, by having one general contractor selected for the project it will reduce the management
effort vs. managing several contractors. Finally because of the complexiry of the dewatering effort
requiretl for this project, combing the project with an estimated $6 million dollar project value, we
anticipate attracling experienced conVactors during the bidding phase that are qualified to mee[the
challenges this project represents.
Project cost savings will be realizetl by combining these four projects. By modifying the existing
bidding documents the bitltling document preparation will be retlucetl from potentially four to one
document. In adtlition the dewater permits that have been obtained for bidding purposes provides
the following benefits:
• Allows bidders to prepare bids that are similar in nature and based on known permit
requirements and conditions.
• Allows the projec[cons[ruc[ion schedule to be advanced approxima[e 6-8 weeks. This is
the length of time required to obtain these permits. Prqect work can proceed as soon as
the project is awarded and will allow maximizing the construction season in 2016.
• The installa[ion of the eMrac[ion wells installed during[he prepara[ion of[he permits allows
avoidance of contreclor markups for the installa[ion of the wells. In addition, these wells
were usetl for permitting and also will be used by the contrector for dewatering.
Ux or tlistlosure o(aa�a mn�aineJ on this sneet Is suojecl to IM1e reslnc[ion on Ne firs�page oi Nls tlocument.
C�.WSers\TimmpWppOaG\LOtaIVAicrosoX\Wintlwvs\TempoarylntemetFJes\GOn�enlDWlooktl%M]XU4M1fiO3t6513 MrenCment
Y OJ182015JOu
AECOM 3
This amendment was prepared based on the following assumptions:
. The proposed West Snell Lift Station (Work Unit A)will be combined with the Interceptor
Improvement Project(WOrk Unit B)and will be designed by City Staff. The City will provide
Special Provisions to be incorporated with project bidding documents
. The dewatering wnnivance pipe as approved in the High Capacity Dewatering Permit will
be replaced with a permanent storm sewer being designed by others. These plans will also
be includetl in the bidding documents for this project as Work Unit C. The City will provide
Special Provisions to be incorporated with project bidding documents
• AECOM will provide a Professional Engineer stamp for only the specifications and plans
prepared for Work Unit A.
. The High Capacity Dewatering and WPDES Discharge permits will be amended to include
Work Units B and C. Additional groundwater well installation and testing will be required to
amend the permits. This addition is approximately$32,000 in subcontractor fees for
installation of eztraction wells
• The City will provide abandonment drawings for Existing Snell Road Lik Station [o be
included as a bid item altemate in the bidding documents.
• The City will provide by sanitary sewer bypass drawings for the Ezisting Snell Road Lik
Station.
• The City will ob[ain access to the two private wells west of the site for well inspection antl
water quality testing. This addition indudes is approximately$3,100 for subcontractor costs
related to private well inspection and laboratory analysis.
. The City will provitle temporary water suppry to the two private wells west of the site, if
necessary
• The Project will be bid using Quest online bid item cost proposal. Bidding documents will
be reviewed by City staff for compliance with �uest bidding requirements. City staff will
prepare the CVS fle bidding format document required by�uest.
• Project biddinq schedule is anticipated to be November, 2015 with project award in
December 2015, and wnstruction in 2016.
Revised Budget—Design Changes and Specification Modifications
The additional design and Specifcation modifications services included
Desion Chanaes
• Installation of MH S-16 antl associated piping pass sanitary sewer for the existing Snell
Road Lift Station.
• Altemate for abantlonment of the ezisting Snell Road Lift Station.
• Incorporating the proposed sanitary interceptor sewer as Work Unit B into project bidding
documents.
. Incorporeting the proposed storm sewer as Work Unit C into the project bidding documents.
Use or oiuAOSUre of aata contalnea on Mls sneet Is suqect to ine reshi�.tion on ine first pa8e a inis aowmenl.
G\USeS\Tmmpl4pp�a�aLLOCaIVAlcrasoR\WinOOws\iempo�'dryln�emetFiles\COntenLOWlookN%M3%WAT6031fi51] Amentlmen�
] 03fB20t5.tlocx
AECOM 4
. Provide new Generator specification vs. reuse of Murdoc Avenue Lift Station Generator.
• Realignment of the inFluent piping at the lift station [o accommodate the interceptor sewer
project.
• Additional Civil Design Services related to greding the ditch antl installing a new culvert for
site access including redesign efforts to accommotlate the proposed storm sewer
wmeyance system. Including desiqn changes as a result of Work Unit C.
Soecifcation Modifications
• Inclusion of Work Units B and C in the project biddinq documents.
. Preparation of Dewatenng Specifwtion, including Work Unit B.
• Moditying Specifcation to match online bidding requirements.
. Review of multiple emails with questions and specifcatlon changes received after the fnal
specifcation and plan review meeting was completed on November 11, 2014.
• Change in specifcation based on comments received from CH2MHill.
Revised Budgel—Design Changes and Speci£cation Modifications
We are requesting that the budget be increased by$22,145 which equals an additional 56 hours of
time already incurred and an estimate 8Z25 hours of effort including reproduction expenses to
complete the documents. This increase in butlget will cover the additional design services and
specification modifcations required to complete the additional scope included for combining Work
Units A, B, and C.
Hytl�ologic Study Additions and Permit Amendments
The Hydrologic Stutly proposed in Amendment 1 was wmpleted. A de[ailed understanding of soil,
bed rock, and groundwater conditions has been completed for the design of the proposed lift station
and required constmction dewatering activities. We propose to amend the High Capacity
Dewatering and WPDES Discharge permits to indude the anticipated dewatering required for the
constmction of the Interceptor Sewer. Additional subsurface information will be required for
preparation of the amentlments. We propose to install four ro five, new 6-inch diame[er
groundwa[er wells on the south side of Snell Road between Omni Drive antl Vinlantl Street These
wells will provide the soil and groundwater data required for the permit amendments and can be
used for dewatering during constmction.
As a wndition of the High Capaciry Dewatering Permit a WPDES discharge permit was required.
This permit was not budgeted for in Amendment 1, but was prepared, submitted, and approved by
the WDNR. In addition, a dewatering specification was prepared basetl on the permit conditions for
bidding documenta We propose to amend the permits and modify the dewatering specifration for
inclusion of Work Units B.
Results of a review the area residential wells indicates lwo private wells to the west of the site
maybe impacted but site dewatering activities. AECOM prepared a draft letter to notify the owners
and request permission to complete well inspections and groundwater analytical testing. The well
inspections will be performed by a subcontracted WDNR Licensed Well Driller.
Use or dlulosure of tla�a mn�ained on inis sM1eet Is subl����e resNClion on iM1e first page a Nis tlowment.
Q\Uxrs\Tlmm0a0PDalaLLOCaI�Microsofl\W ntlaws\Temporary In@met Flles\COntent OutlookV XM3XUdM1Tfi0318513 AmenEmenl
z osiexais.aau
AECOM 5
Revised Budget-Hydrologic Study
We are requesting that the budget be increased by $36,995 which equals an adtlitional 59 hours of
time already incurred and approximate 200 hours of effort including reproduction expenses to
prepare and submit the amendments requests to dewatering permits. An addition subwntract
drilling cosl of$43,81125 for fhe installation of four to fve, 6-inch wells, and$3,100 is requested for
the residen[ial well inspec[ion and laboratory analysis. This increase in budget will cover the
additional services required.
Bidding Phase Services
Bitlding services were includetl in our onginal proposal. 7his project bitldinq schedule has
significantly changes and has been potential delayed until November or December 2105 to allow for
budqeting. In addition, the budget was based on a significantly different scope of work as is
currently planned. Therefore, we rewmmend removal of the bidding assistance budget of$8,364
from this wntrect We rewmmend that the bidding assistance be combined with a separate
contract for construction management once project funding is completed and the schedule is
verifetl.
The services provided will be pertormed in accordance with the 2015 Negotiatetl Fee Schetlule antl
conditions of the General Conditions of Service-Ciry of Oshkosh, April 2009, which are expressly
incorporated into, and are an integral part of, our agreement for professional services. AECOM can
begin providing these services immediately upon receipt of the signetl Amentlment Authorization
Form (attached).
If you have any questions or need to clarify a point, please call any of the undersigned at
920-236-6718.
Sincerely yours,
��� �pr � ;� �
E. Cliffo�d,��"- �� aul F. Timm
Vice President/District Manager Account Manager
AttaChments:
Amendment to Agreement Form
Amendment Authorization Form
Subsurface Cross Section 3/3/74
Use or elaclosure olOala mnNineU on iM1is sM1ret Is suol�b��e resNdlon on Vie firsl page ol Mis Eocument.
G:\UUrs\TlmmpWpp0alalLO�aIVAic�osafllWinGOV51TEmpOrarylnleme�Files\COn�enLOUYaokVXM3Xl14M1M0316513 Am2nOm¢nt
3 03182015don
A=COM
AECOM
558 Notlh Main Str¢e�,Os�kosh.Wl 54901
T920236.6]i8 F920235.0321
Amendment to Agreement Form Authorization
Amentlment No. 2
Design Services Related To CiTy Contract 14-12
Snell West SaniGry Pump SGtion
AECOM ProJect No.60376573
Cily of Oshkosh Resolution No. 14-61
RETURN TO: AECOM Date: March 17, 2015
558 North Main Street
Oshkosh,WI 54901
Attention: Paul Timm
SUMMARY: Original Contract Amount: 5137,834.00
ToWI Previous Amendments: E 92,582.00
AmountthisAmendment: S 97,687.25
Revised Contract Amount E328,703.25
Amendment# DESCRIPTION AMOUNT
2 Atltlitional Design Changes antl Specification
Modifcations: Additional 143.25 hours of $ZZ �45
effort inclutling reproduction expenses
Hydrologic Study: Additional 259 hours of $36,995
effort including reprotluction expenses
Subcontrect Residential Well Inspections and
Laboratory Testing $3,100
Subcontract Four 6ctraction Wells $q3,81125
Bidding Assistance Deducted from original
contract < 8 36a>
TOTAL
E97,687.25
C1USers\TmmpWpPOaG\lowlUllcrosott\WnGOws\Temporary In�ernel Flles\COntm1.0u0aokVXM3X04M�fi0316513 rMenEmen�
2 03t820t5dms
�/�M AECOM 920235.02]0 tel
���� 558 North Main Street 920235.0321 fax
Oshkas�,Wl 54901
Authorization
March 18, 2015
I hereby certify that the necessary provisions have been matle to pay the liabiliry which will accrue
under this contract.
I hereby authorize AECOM to proceed with the swpe of work outlined in Amendment 2, to amend
AECOM's proposal OPP-229722, dated Febmary 12, 2014 and Amendment No 1 dated July 25,
2014 for Design Services related to the proposed West Snell Roatl Lift Station with a revised budget
authorization of$326,10325 under the general terms and conditions specifietl in the proposal.
/7[s— ��i7�K/
SigrVature Date
Mark A Rohloff
Print Name
City Manager
Ti�le/Organization
:� �--����'1 ��r�_
Signature oat�
Pamela R. Ubrig;
Prinl Name
City Clerk
Title/Organizalion
n�Jl Ql� �h���l�
Signature Date
��°�'/<°��5,y'�J,�
Print Name
I� .�City Attomey
m Title/Organizalion
���`����Y� oa���� � I�
Trena Larson
Pnnt Name
Director of Finance
TiNe/Organization
C1UUn\TlmmpW00��1LO�a1RlicrosoMWintlowrs\Temporary Intemel Files\COnten�AU�looktl%M3XU<M18W�8513 Amentlmen�
2 031820t54ocv
N V �I J J
A V J J V �
c c � d m
0
/--/r :�o/iN. f: " , i16Dae _, aen .. ...t -tc.a[. )
� P f " �
�` �T �\ 1 tC P4 y { . �3 .
A �
N £
�`. t�' � 1-,et�,-]„i„q 1`�iIS 4f� c�'F'� SfaF+'.« y,'G
, �e.ti W ai
x �g1T '�?�s�''�g� ._ p �- = � g 't
1 2 � � j j
ti..
N �
R
� l
a
.� ,�
s+ {
m t�y 1
_ ___. � b - � � .
. . . �_` � . . .
�
, ,. r �� �-- �
k/<f(
> '^ � ' Q ? R r . � . .
;�. , �S � i � f � t�
� -
y� c
. _..._ . _ _. . ' �_.�h'. R�-.:._Z.F .� � � E.}B �` T@ ` , . .
t ^ -�: ��
y.. c ��1 =. ��+. k. . B fir. �� z T i - ' �
--•—
. � n �� . Rj. u ,�, ' 0.� / �� ��
� ; /
% � i .� ;�, � `
. '�` ` {
� � c a i. L�� �?C x� � "w n� ` ?� " °
� m i ,
�� ,� ,
� � ' y °' � �' ". N� ' '
� " ��. �� _
KI � � �W � n � w
9 S'' .o.{p�u �6-�.n _ � sC 4 - .
� ^64 � g�_"_'—_ `.Y i .
4
� 4
-0 � .�� � � it..vl.-/�' Nd ��/
� � �� � ' ' � � '
a . d'. � . . . ^ . . ♦:A°. .
3 �"�-:::�''�� ;� � „�. s� � ,
/ C
�� �! � �" ' 1�� � � � ` '
� I €p \ ^ ._ t'1- _ VLSNIZ
W <,,,y .f ������. a rI2sN-IZ+1
� ` � r '� \�< V� IY "'� _ . ��� .
� � � � i
k €i � � i ' i ' �
. � � �11� ? �' 3 �.�r w?�` TS <~� �-��i
Y
. � , c ti � , -� Y /
. / '`- r = °/�'
. O . . _. . . ... . "y� /
. . . S .� �x '.< � r3 '��
(� '
v �� � ..'�_� , . M'��. r�� r � �OT .
� � . . __�: � , � t� ��
1 s �,
* �iy /° ��.
�:, � :. N � � .
� ♦ ��
I �
i � �
4r. � y�a
. . T.� . � <.�.Li �. - ir�#\
�S jy
�R � C
. ��'T�'�— �e � � ^ P.�� G'
��"' . { . qa<. , n`IT.
Y� �`\\ j
. � . . _ . . .Q \ N .
. � � C� j �`�'� S
� �
�
� �. I p � J � j
t� ��', �� �f
, , �
� � � p h, � �, � � �' � �.� , � �', e
� a z-� y � � �.
���AAA � o � ^ � + ,�y� \ � � `
� S j °, ]' ^ �q . o `c �' i . . €�`Ll�s� :i .,� . "i �+ .. __ i ° '��
_ `, ., ' \
� r � � 3 � r � A� $„ , 0
a _ a � . p `� . . .`J. � . . . ... .� �n� + �' � aS :� ; �y . 4r
D �� � r v. �t- i � .f n �
4 �� � ri � . . �� . . A ( � , � .
P �} `" � �1.� 1- � . � " . 1
r i � i> �1 ? a e ^ : e r p
Y '�' $ F $ r � � �� : ��� • � F . F n
n 7-- � ��-e 1 � e ' ' �
3'v � � L' r ' ,
. . E4v< 1+ 's.� �i-r�T .-�bo✓�- �N.� .5ra. Cr�.XL}
5... . . a 6 e �
x � o Y �
SUMMppV OF CITY FINAL COMMENT FIlES
Os�kosh Snell Roatl Vump Station
3/i/]O15 by GPG,revised 03/03/IS by GNG
Sheb.
Public Works& Pf Commentr cna�¢e
OrEer Whahas
file No. Filn�Namp To°IC Effort ta
SeeNOtes GHGCOmments hrs AdEreu
. . ,,. '"'"�SnelllntercepmrPlans �wgs&speaoiCitysewercontract
NTI 0
� Asbulltslisted.... T�aqcommentabautattachingtlocuments
aboutsubsurfacemndkions PTA NTI
3 FountainTavemWell PetewanbmeetingwithFOUntainTavern p7q ryT� �
4 GroundwaterDewateringOVerlays �aWtromGireudshowinggrountlwater �
ovelays 7TA NTI
5 MessagefromWWrPp1 Brande-mailtaPTaboutadtlinglocatesan �
provah pmperty to specs PTA NTI
6 Oldspecrepuest Mohre-mailtoVTaboutadtlinglanguageto �
SCS 7�A NTI Paul,this is gand idea. PleosP add ro SC's.
0
� Oshkosh Snell West Lik Statian e-mail string(mm Pete&Killilea on
OlymplanGI50LG] genera[orsizing +nA
8 GNG&Wp
8 Snell West Bid Speu(e) Hollantl Ol/20/IS additional I&C changes STA
17 DH
SneII West Bid Spea(8) Holland 01/20/15 addlHOnal I&[camments
NTI Samecommentsasfileabwe p
.SnellWestBlASpecs Holland0l/70/SSaddltionall&CComments
� � - NTI Samemmmentsasflleabove �
11 SnellWestSpttqeview KIIlilea0l/19/SSComments
n� MosHyl&CandElec 14 GRG2,�H
Generator-Snell Greeneway0l/i]/ISe-mailtoPGOn 8• WP4
generetorsixing NTI CoveredunderN]above 0
13 NewName&Mforcontrac[s Controctnamechan eb Tra
8 9 �'/ P1A On holtl wtil resolveo �
Paul&OPWCOmmentTransmiKal PTemalltoGPGtransmittingalltheCiry
"` - -�' comments NTI Coveredinalltheatherflles Q
15 ProposedinserttorSnellWestsec[ion �HlMHi110]/0]/IScommentsonchanging
1fi900 and coardinating programming STA MosHy I&C,one HVAC comment 4 DH
Are there supposeC[o be 2 Eld items
. . _ . •M300007 e-mailfromPTtoTracyonbidform NTI
As-Buiits are Ilsted in atta<hetl �
ll Tracy asks why the change order form is not
paragraph.... Inqppentliz �A Onholtl ShoulCitbeinAppendix? �
� Bidding Snell Pump StaHOn and Preliminary tlwgs o/City interrepto�projeR
��hntercepmr toPr NTI
NotlticaHOn:Paul F.Timm has sent yau �
tlles SmalltalkbetweenPTandTrory NTI
Noti/ICaHOn:PaW F.Timm has sent you �
. files SmalltalkbetweenPTandTrary NTI
0
H SnellWest8id5pecs(9) Pehwantssomethingwritteninrospecsthat
Timsuggested �A � Havenoideawhatthlsisabo�t ] GRG
`SneII West BId 5pecs e+nails between VT&PG on schetlule
NTI 0
�Snell West pump staHOn questions Scheduling e-mails between PT&LM on
� - �' schedulingcon(call NT� 0
24 WestSnellPOadSankaryPUmpShtlon �°mment(romSBtoPTabautrevlsiansto
... OIS10regardingelettriwllowtes PTA NTI O
25 Remove Paragraph 16.01 Trary mmment on I6,01 of IB's
26 Sealon0261U- PTA 0
Canbattl5-13 questlonfromJamestoPT NA
� SneII West Bid Spea �
Halland0l/i0/15additlonall&CCOmments NTI Samerommentsasflek8
Snell West Pump StaHOn and Starm �
. . ..Seweradditionldea PTemailtoPGaboutstormsewerdesign NTI
0
29 Specissue�l) Tncycommentspecreferencein16130 yTq .
Elec[ricaltoaddress 0.25 AK
30 Spec issue�7) Traq comment:spec reference In 16731 5{�
Electricaltoaddress 0
31 Spec Issue(3) Trory comment:spec re/erence in 16060 yT�
Elearicaltoaddress Q
32 Speclssue�<J Tratycommenkspecreferencein1603U yTp
ElectricaltoadEress 0
33 Spec Issue(5) Traq commenC spec referena in 15915 57A
HVAC to address �
34 Spec issue(6) Traay commenF.spec reference In 15198 gq
HVAC ro address p
35 Spec issue(]) Trary comment:spec reierence In 35198 yTp
36 Specissue TracycommlOt1691fi,spPCnoteditetl HVA[taatldress Q
37 Specissues Tratymmmentonbitlform&16900 STA I&Ctoatldress �
'�iH�Specpuestions �A nA I&Ctoaddress �
Tracyspellingquestianon01210 NTI Spellingcorrettasis
Greeneway tlme ta read,reWew,& organixe comments,and put this Ilst cogecher Por all the atltlitional Public Works antl PT comments �
Natei 4 GpG
NTI=Nothing to Inwrparete by She6oygan
PTA=Paul Tlmm ta address
STA=Sheboygan to atldress
�.�„:�;',-'Green means nothing to adtlress or camment has been atldressetl(i.e.green is goadl)
SNff Shehoypan has to atltlress
GRG= GaryGreeneway�PM&process)
OH= DarrellHause�l&C) �
AK= Amy Klstner�admin)
WP= WaynePOtlalak�elec[tlfal�
KB= Ken Brendel(graphics)
Trecv Red Line Comments
Flle No. Flle Name Too 0
See Notes GRG Com �
Hours Persan
000000Cover [ontratt No.and name change pTp P�oject name Trary changed to tloes not
On Nold
rtiahhnamesheusasino[hersecuons ��2 AK
OOOOOTOC Changesmadebuttheydon'tshawupin p7q
On Hold Chanµes matle but tlon't show up In nar.k 0.3 AK
trackchanges
OOOOiProjectDirec[ary Minorchanges �hanKes. Sen�im!rackmangestilP.
00100��ial Noti<e
�A 0.2 AK
Bi0 format changetl(rom paper ta elettroinic PTA On Nold All the dates neetl tc be changed 0.2 AK
W200 instruc[ions to Bidders
Bldlormat changed from paperto electroiMc �A On Holtl QII the�ates neetl m ba chanReC p,2 AK
�isagree wrt�Irary's aele[ion n!
00410BitlFOrm MiscChanges acknowledgementotatltlendums. Disagree
PTA on Holtl
with Tracy i change o!makinR major �'= AK
equipment schetlule an attachment ro bitl
OOq308id Bontl Connatt No.and name change �orm smce i!is incivaen in[he bitl�orm
STA
0.2 AK
00460ListofApproved.... Changesmadebuttheytlon'tshowu In
0 PTA On Holtl Changes made�ut tlon'[show up in vack 0.7 AK
troekchanges c�anqes. Sentluzhackchangestile.
OOSIONOticeofAward Cantrac[num6erchange
STA 01 AK
OOSIO Stantlard Form a/Agreement Contract No.and name change pTq
On Holo All the dates nertl ro br changed 0.2 AK
00550 Notice to Proceetl Changes made but they don't show u in
p PTA On Hold Changes matle bue don't sM1Ow uu In trark
trackchanges 0.2 AK
0O610PeAortnanceBOnd ContreRNo.andnamechange changeti, sendus�rackohan@es !ile.
OU635 Payment Bond Contract Na.and name change �A 4.2 AK
STA
0.] AK
OOBOOSCsCiryo/OShkosh CiryAttomeychanges HavingtwoseparateSCseRionsisno[Me
STA properwaYtodoit. Thesechangesshould 0.2 AK
00810SCSNevised Mortlyiormatchanges belncludedln00830
STA
011105ummaryof Work
nll:hP dates neetl eo be mange�_ Some u� ��� �K
7TA On Holtl the mntact numbers frary manqec are
inmrrec� 0.2 AK
OS795SCheduleofValues Onlychangeisfoocec5eenotebelow
01315Pro�ectMeetings Onlychangeisfooter. 5eenote6elow �A 0.2 AK
01321 Conshuttlon Photographs Only change Is/aoter. See note below STA �.Z AK
01325 Construttlon 7rogress... Ontychange ls footec See note below �A ��Z /K
013<OSu6mittals Onlychangeisfooter. 5eenotebelaw �� 0.2 AK
01455Testing.... Onlychangeisfootec Seeno[ebelow �a ��Z AK
01456TesHngTanks.... Onlychangeisfoohr. 5eenatebelow �A 0.1 AK
01957TestingPlpingSystems Onlychangeis(ooter. 5eenotebelaw SFA 02 A�
01500TemporaryCanstmttion.... Onlychangelsfao[er. 5eenotebelaw �A 0.1 AK
01600 Materlal and Equlpment Only change is Poocer. See note below �q ��� AK
o1740Cleaning Only�hangeisPoohr. Seenotebelow �A 0.7 AK
0178508MOab Onlychangels(ootec Seenotebelow �A 02 AK
�S78BProfectRe[ordDocumen[5 Footerandminorchanges �^ 0.2 pl(
018145ystemsDemonshation Foaterandminorchanges �A 0.] AK
OIBIfi ElectHCalSystems Oemo Onlychange is Poa[er. See note below �A 0.2 qK
O]335SnutturalExcavation.... Footerantlminorchanges STA 01 AK
025305aNtarySewageFacllitles Faoterantlminorchanges �A 01 AK
O7filOCulverts Foa[erandminorchanges �� 0.2 AK
�!01450[onstructlonDamage.... NewPTSpec �� 0.2 AK
STA Greenewaymadeeditsasapproptlate 0.2 pK
FooteiChange Tratychangedfooteronallspecs DernotlikethewayTracvchangetlme
fmter. Makes[bespecsectiunnumberand
ReadandrevlewalltheaAdMOnalTracycommentsand utthlsllsttogMhecGqG UagedlHicWtmseeand?oomucncWttei
s7A
Atlditianal Effart
4 GRG
Assign&discuss with deslB�en the changes in this list.
Address future wmmeMS that are stlll to rome SiA
STA 4 GNG
Thisestimatelorertrawork 8 GRG
Graphlcstimetomakechanges,replotalldrawings,puttogethernewbidset �A 4 GRG
Admin[Imenotaccountedforaboverorevisespecs �� 1] KB
STA
Eatlmate W Cymplete
< AK
87.75 hours
T1ma alreatly InsurreE�ask 4.9 Dea�yn Change pMer AccouMetl�q ayav�
Greeneway, Gary R
Heuse, Darrell R 3.5 Gqe
Greenawey,Gary R 1 DH
Heu9e,�errell R 6 GRG
Greeneway,Gary R 1 oH
Heusa, Dartall R 6.5 GXG
? DH
Time alraedy Incurted 7ask 4.9 Deslgn Change Order Not accounted for ebave �� houn
30].25 hours
Greenewsy, Gery R
HaU9e, Dallell R 12 GpG
Potlolek,Wanyne 9 pH
Timm,Paul F. 7 y,�p
�o�el 8 ?T
Tofnl Sheboypan Changa Ortler Tlma Estlmatetl W Ottur 36 hours
Biflakdawn of Abo T tel chebo� n Time A oln w
Gary Greeneway(pM 8 Proceas) GRG 3x
Derrell Heuae(18C) DH Za 56,080.00
Weyne Podolak(EladACel) �yp g 53,360.00
AmyKlstner(Atlmin) AK 11.x5 $��240.00
$73125
Ken Brendel(Graphics) K8 Ix
$1.140.00
Totel e].35 574,6E0.15
Time elreatly Inwred qprne 2a 53,600.00
Plus Time incurre0 not abova � 55.883 00
ToGI RetlpiBn AmouM naeded 743.25 EY2,145
In addlHOn,Oshkosh penonnel have charged the follawing to Task 4.9 Design Change Order thmugh 02/D/IS
Giraud,Joel R WPOES 3.a y740
Timm,Paul F
Gireud,JoN R WPDES 2.0 §155
Timm, Paul F �✓P�ES 4.0
Timm,Paul F WPOES l.0
Gireutl,Joel R GrourMwetar Model 6.0
Groundweter Model 1.0
Timm, Paul F Grountlwater Model io.o
Giraud,Jael R Ciosb Seclion 10.0
Timm,Peul F Res. Letler, Inco .Senita and Storm 10.0
Timm, PaW F Cmss Section 1i.o
Total ms[incurred as o(3/d/15 59A haurs
Timm 41.0 $6,355.00
Giroud 18.0 i 520.00
Antitlpated Hytlm stuAy $8,6]5.00
TnM
Houn
WPDESPerml4AdtllHOnalOesign 59 $8,8]5
PermitAmendments 100 $14,375 PaW25hrsloel75hrs
NewWells/aquifertesting S00 $13,745 PaulBhn,lcelfi]hrs,5hannon25hne�pense$IOOU
Subconbacc�rilling/well Inspectlan 35 100
Design subtMal 572,495
527,145
Hydro Permlt5u6total 5]2,095
LessBiEtlingASSistance - 8364
Tat�l AmendmeM No 1 $85,8]6