HomeMy WebLinkAbout35405 / 89-112 June 1, 1989 q112 RESOLUTION
(CARRIED LOST LAID OVER WITHDRAWN )
PURPOSE: ACCEPT AND APPROVE WAIVER Of SPECIAL ASSESSMENT NOTICES
AND HEARING IN CONNECTION WITH IMPROVEMENTS
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
BE IT RESOLVED by the Common Cou�ci] of the City of Oshkosh taht the
Waiver of Special Assessment Notices and hearing under Section 66.60 of the
Wisconsin Statutes, for grading and graveling, concrete paving and engineering
services, for the premises described below is hereby accepted and approved:
Desciiotion of P[emises
SECOND ADDITION TO FOX CHASE PLAT
(LOTS 32 - 102J (71 LOTS)
BENEFITS
SANITARY SEWER �
Costs based on Cont[act 89-09
pcices
Construction cost = 3100 ,391 .65
88 Engineering= 8,031 .03
Total Cost 5106, 422 .68
Coat/LOt = 5108,422 .68/71
_ $1,527 .08
SANITARY ¢ P7ATER. LATERP.LS
Coats based on Contcact 89-09
prices
Construction cost = S 42 ,360 .00
88 Engineering = S 3 ,388 . 85
Total Cost = S 45 ,748 . 85
Cost/LOt = 595 ,798.85/71
= S644.35
�-
SUaMIT1'FD BY
AFPRO'.�'r,D G%:t��� �
20 -
Res. #112
WATER MAIN
Cost based on contcact 89-09
prices
10" and 12" main assessed at 8" costs
Consteuction Cost = 596 , 880 .00
88 Enginee�ing = S 7 ,750 .90 �
Total Cost = 5109,630 . 40
Cost/LOt = 5104 ,630 .90/71
= 51, 973 .67 .
STORM SEWER
Cost based on contract 89-09
pcices
Developer Cost = Assessment + Rear Yacd Dcains & Storm Latecals
Assessment = SS x front footage as measuced at building
setback line (25 ' )
= 55 x 57 ,226 .62
= 536,133 .10
Rear yacd dcains (3 inlets plus leads)
Construction Cost = 56 ,208 .00
88 Engineering = S 996 .64
Total Cost = 56 ,704.64
Storm Laterals
6" storm lateral provided to all lots except those which
can connect to rear yacd drains
Consteuction Cost = 511 ,480 .00
88 Engineering = S 918 .40
Total Cost = 512 ,398. 40
Total Developer Cost = 536 ,133 .10
S 6 ,704 .64
.. 912 ,398. 90
555 ,236 .14
Cost/Lot = 555 ,236 .14/71
= 3777 .97
- 2i -
Res. #112
GRADING ¢ GRAVELING
Includes WINDHURST fcom Wah Wah Taysee to So . Oakwood ,
WAH WAH TAYSEE WAY � FOXTAIL LANE� BERNHEIM STREET� and
MONTCLAIR PLACE from Me�ewocth Couct west to end of plat
( lots 41 - 102 only)
(West 20th Avenue not included? �
Approximate length = 3 ,920 feet � .
Estimated Construction Cost = 570 ,560
88 Engineecing = S 5,695 _
Total Cost = 576 ,205
Cost/LOt = 576 ,205/62
= 51 �229 .11
CONCRETE PAVING
Includes same streets as Geading 6 Gcaveling
(Weat 20th Avenue not included)
Lots 91 — 102 only
Estimated Construction Cost = 5235 ,225 . 80
88 Engineecing = 5 18, 818 .06
Total Cost = 5254 ,043 . 86
Cost/LOt = 5254 ,043 .86/62
= 54 ,097 . 48
SIDEWALKS
Assume sidewalks requieed on all streets .
Dist[ibute total cost equally among all lots .
Estimated Construction Cost = 565 ,G00
Cost/LOt = 565 ,000/71
= 5915 . 49
- CZ -
RFS. ,Y712
WAIVER OF SPECIAL ASSESSMENT NO'PICES AND
HEARING UNDER SECTION 66 .60 , WISCONSIN STATOTES
The undecsigned , owner of pcoperty benefited by the following
improvements to be made by the city of Oshkosh, Winnebago County,
state of Wisconsin, to wit:
SANITARY , SEWER� WATER MAIN, SANITARY SEWER & WATER LATERALS� STORM
SEWER� GRADING & GRAVELING, CONCRETE PAVING� CONCRETE SIDEWALK
In considecation of the constcuction of said impcovements by the
city of Oshkosh, Wisconsin, I hereby admit that such public improve- -
ment will benefit said property and consent to the levying of special
assessments against the premises under Section 66.60 of the Wisconsin
Statutes for the cost of such improvements. In acco[dance with
Section 66.60 (18) of the Wisconsin Statutes , I hereby waive all
special assessment notices and hearings required by Section 66.60 of
the Wisconsin Statutes; and i further agcee and admit that the benefit
of my propexty from the construction of such improvements is in
pcoportion to the footage thereof:
Descriqtion of Premises
SECOND ADDITION TO FOX CHA56 PLAT
(LOTS 32 - 102) (71 LOTS)
BENEFITS
SANITARY SEWER
Costs based on Contract 89-09
prices
Constcuction cost = 5100 ,391 .65
8& Engineering= 8,031 . 03
Total Cost 5108, 922 .68
Cost/LOt = 5108,422 .68/7].
_ $1 ,527 .08
SANITARY & WATER LATERALS
Costs based on Contract 89-09
p�ices
Constcuction cost = S 42 ,360 .00
88 Engineering = S 3 ,388 . 85
Total Cost = S 45 ,74� . 85
Cost/LOt = 595 ,748 . 85/71
_ &649 .35
22a -
1
� Res. #712
WATER MAIN
Cost based on contract 89-09
prices
10" and 12" main assessed at B" costs
Construction Cost = 596 , 880 .00
88 Engineering = $ 7 ,750 . 40 �
Total Cost = $104,630 . 40
Cost/LOt = 5104,630 .90/71
= 51,973 .67
STORM SEWER
Cost based on contract 89-09
prices
Developer Cost = Assessment + Reac Yard Drains & Storm Latecals
Assessment = SS x fcont footage as measured at building
setback line (25 ' )
= 65 x 57 ,226 .62
= 536 ,133 .10
Reac yacd drains (3 inlets plus leads)
Construction Cost = $6 ,208.00
89 Engineering = S 496 .64
Total Cost = 66 ,704 .64
Stocm Laterals
6" stocm lateral provided to all lots except those which
can connect to rear yard drains
Construction Cost = 511 ,480 .00
8� Enginee�ing = 3 918. 40
Total Cost = 512 ,398. 90
Total Developer Cost = 536 ,133 .10
S 6 ,704 .64
.. 512 ,398 . 40
555 ,236 .14
Cost/LOt = 355 ,236 .14/71
= 5777 .97
- 22b -
2
. � Res. #112
GRADING & GRAVELING
Includes WINDHORST fiom Wah Wah Taysee to So . Oakwood ,
WnH WAH TAYSEE WAY , FOXTAIL LANE, BERNHEIM STRGET, and
MONTCLAIR PLACE from Mecewocth Couxt west to end oP plat
(lots 41 - 102 only)
(West 20th Avenue not included) �
Appcoximate length = 3 ,920 feet
Estimated Construction Cost = 570 ,560
88 Engineering = S 5 ,645 .
Total Coet = �?� ;?�5
Cost/LOt = 576 ,205/62
= 51,229 .11
CONCRETE PAVING
Includes same stxeets as Gcading & G�aveling
(West 20th Avenue not included)
Lots 41 - 102 only
Estimated Construction Cost = 3235 �225 . 80
88 Engineering = S 18,818 .06
Total Cost = 5254 ,043 . 66
Cost/LOt = 5254 ,043 . 86/62
= 54,097 . 46
SZDEWALKS
Assume sidewalks cequired on all streets .
Distribute total cost equally among all lots .
Estimated Consteuccioii Cos� = +'o` ,G^uG
Cost/LOt = 565,000/71
_ $915 . 49
Signature of Ownecs:
THOMAS N. ROSCH RICHI112D L . GABERT
Date: Date:
- 22[ -
3
� � D � ➢ T A
L O c ¢ O N �
z ti a � �
A r N � J N N •
i-.O . N �n -O
m z n �n �+ _¢
O .. � yc+ �
. O r. N W
O � N
ZYY l0 T � cb ➢
�mTO �O �% £ Za
N (n 'D .•• O Z
-i � .+ � o
� � .. <
�� a n m
�._. .. m
m � �n
a
NZPo �
C O
Q < 2lD
QNlDl
r. � pi
< (D Z O
... � �-, �
u � �
.-. tn �p N
� �ti� '^
�NJ VI
� '`
Q G IPn
•- �
�