Loading...
HomeMy WebLinkAbout35460 / 89-176 July 6, 1989 #176 RESOLUTION (CARRIED LOST LAID OVER WITHDRAWN ) PURPOSE: ACCEPT AND APPROVE WAIVER OF SPECIAL ASSESSMENT NOTICES AND HEARING IN CONNECTIO� WITH IMPROVEMENTS INITIATED BY: DEPARTMENT OF PUBLIC WORKS ' BE IT RESOLVED by the Common Coun�il of the City ofOshkosh that the Waiver of Special Assessment Notices and hearing under Section 66.60 of the Wisconsin Statutes, for grading and graveling, concrete paving and engineering services, for the premises described below is hereby accepted and approved: Description of Premises FIRST ADDITION TO WINDSOR GREEN SUBDIVISION BLOCK 2 , LOTS 2 THROUGH 17; BLOCK 3 , LOT 1; BLOCK 4 , LOTS 1 THROUGH 6 (23 LOTS) SANITARX SEWER, WATER MAIN, SANITARY SEWER SERVICE & WATER LATERALS, STORM SEWER - ESTIMATED TOTAL CONSTRUCTION COSTS Sanitary Sewer $20 ,568 . 80 Water Main 521 ,980 .00 Storm Sewer 527 ,360 .00 Laterals 813 , 800 .00 583 ,708 . 80 583 ,708 . 890 x 8$ Engineering = 56 ,696 . 70 Cost/Lot = 56 ,696 .70/23 lots = 5291 .16 (There is no additional charge for storm sewer, because the owner has already paid more than the city would assessj 527 ,360 compared to 59,596 . 80 . ) GRADING & GRAVELING Centerline footage = 1313 .37 1313 .37 x S20/ft .= 526 ,267 . 40 8$ Engineerinq = S 2 ,101 .39 528,368 .79 SUBtiiITTED BY - 28 - :tFP�O.'ED ���'��-'�--'%G'�� - July 6, 1989 #176 Cont' d. (GRADING & GRAVELING� CONTINUED) Cost/Lot = 528,368.79 = 51 ,233 . 42 23 CONCRETE PAVING � 1313 .37 ' x S60/ft .= S78, 802 .20 8$ Engineering = S 6 ,304 .18 � Total Cost = 585 ,106 .38 Cost/Lot = 585 ,106 .38/23 = 53 ,700 .28 SIDEWALKS Total Footage = 2 ,019 .36 feet Assume 1 - 20 ' driveway/lot Estimated 4" Walk = S12 , 864 .72 Estimated 6" Walk = $ 4 ,255 .00 517 ,119 .72 Cost/Lot = 517 ,119 .72/23 = 3744 .34 1 - 28a - - Res. #176 WAIVER OF SPECIAL ASSESSMENT NOTICES AND HEARING UNDER SECTION 66 .60 , WISCONSIN STATUTES � The undersigned , owner o£ property benefited by the following improvements to be made by the city of Oshkosh, Winnebago County, state of Wisconsin, to wit: . 8$ ENGINEERING FOR SANITARY SEWER, WATER MAIN, SANITARY SEWER SERVICE & WATER LATERALS, STORM SEWER INSTALLED PRIVATELY; GRADING & G.RAVELING, CONCRETE PAVING, CONCRETE SIDEWALK In consideration of the cor.structi�n of said impro�Pments by the city of Oshkosh, Wisconsin, I hereby admit that such public improve- ment will benefit said property and consent to the levyinq of special assessments against the premises under Section 66.60 of the Wisconsin Statutes for the cost of such improvements. In accordance with Section 66.60 (18) of the Wisconsin Statutes, I hereby waive all special assessment notices and hearings required by Section 66.60 of the Wisconsin Statutes; and i further agree and admit that the benefit of my property from the construction of such improvements is in proportion to the footage thereof: Description of Premises FIRST ADDITION TO WINDSOR GREEN SUBDIVISION BLOCK 2 , LOTS 2 THROUGH 17; BLOCR 3 , LOT 1; BLOCK 4, LOTS 1 THROUGH 6 (23 LOTS) SANITARY SEWER, WATER MAIN, SANITARY SEWER SERVICE & WATER LATERALS, STORM SEWER - ESTIMATED TOTAL CONSTRUCTION COSTS Sanitary Sewer 520 ,568. 80 Water Main 521 ,980 .00 Storm Sewer $27 ,360 .00 Laterals 513 ,800 .00 583 ,708. 80 $83 ,708. 890 x 8$ Engineering = $6 ,696 .70 Cost/Lot = 56 ,696 .70/23 lots = 5291 .16 (There is no additional charge for storm sewer, because the owner has already paid more than the city would assess; $27 ,360 compared to 59,596 .80 .) GRADING & GRAVELING Centerline footage = 1313 .37 1313 .37 x S20/ft .= 526 ,267 .40 8$ Engineering = S 2 ,101 .39 528,368.79 , - 28b - 1 � `� Res. #176 � (GRADING & GRAVELING, CONTINUED) Cost/Lot = 528,368.79 = 51 ,233 .42 23 CONCRETE PAVING 1313 .37 ' x S60/ft .= 578,802 .20 8$ Engineering = S 6 ,304.18 Total Cost = $85 ,106 .38 CostlLet = $85 ,106 .38/23 _ $3 ,700 .28 SIDEWALKS Total Footage = 2 ,019 .36 feet Assume 1 - 20 ' driveway/lot Estimated 4" Walk = 512 ,864 .72 Estimated 6" Walk = S 4,255 .00 $17 ,119.72 Cost/Lot = 517 ,119 .72/23 = 5744 .34 Signature of Ownerss THOMAS N. RUSCH RICHARD L. GABERT Date: Date: - 28c - 2 �. L � �� � � U C II�1 � � M'� Q � (n � N C �1-� � 4- •r+ C O 5� N � rts E S- N QJ N 2 > > O •'r o�f S- tO Q. 3 v� � �� 4J � I� N U �`--� > ..-� L I-- O +-� +� d (ntn S- O •� O W W QZ � Ol � � O Q �O Q Q Z � �F-� C � �O C O � I� �2S � •.-� � -N • 0 � -I-� t/1 U lD Z W a v� N O � � � C T � �' tn U V7 C �--� H Q' � Q Q U '7 � U , .. ' , �'.