Loading...
HomeMy WebLinkAbout35518 / 89-244 -.. August 17, 1989 #244 RESOLUTION (CARRIED LOST LAID OVER WITHDRAWN ) PURPOSE: AUTHORIZE AGREEMENT FOR UNIVERSAL DRIVE DESIGN OF STREET & STREET IMPROVEMENTS INITIATED BY: DEPARTI�ENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the attached agreement with J. E. Arthur and Associates, Inc. for engineering services for the design and improvements of Universal Drive is hereby approved and the proper City officials are hereby authorized and directed to enter into same. BE IT FURTHER RESOLVED that money for this purpose is hereby appro- priated from: Account No. 780-991 - Tax Incremental Finance District #7 - Street Expenses. SUB���i'PTE7 BY APPPu'�'E�1 _ _____i��%��' ( _ �..�r. - 22 - . Res. #244 J. L�. Af�THUR AND ASS�CIA TES, INC. ENGINEERS . SURVEY� RS . PLANNERS 548 Prairte Road . P.O. Box 1779 Fond du Lac W) 54936-1779 . 414/922-5703 August 9, 1989 City of Oshkosh 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54902-1130 Re: Engineering Services Proposal Universal Drive Street Improvement Gentlemen: In accordance with your request, we are submitting the following engineering services proposal tor the preparation of drawings and specifications for street improvements and storm sewer on Universal Drive from State Trunk Highway 44 to the west property line of Manufacturer ' s Niarketplace, approximately 1400 feet . Such engineering services will include the following: 1 . Obtain Topographic survey 2. Design street grades and draft existing and proposed information on drawings 3. Determine storm sewer requirements and prepare storm sewer drawings 4 Provide one master set of special specifications and drawings The total fee for the above services will be based on our standard hourly rates and will not exceed a maximum of $12, 500.00. We expect the fee to be approximately $9, 500.00. Any additional services required due to changes, alterations, or additions beyond the original scope of the project or beyond our control will be based on our standard hourly rates. If any such conditions arise, we will notify you of same . In addition to the above services, a survey, monumentation map and description of the right of way of Universal Drive will be prepared. The fee for these services will , not exceed a maximum of $1, 300.00. Al1 original field notes shall remain in our possession, but if desired, duplicate originals will be furnished at cost . It is agreed that payment be made on the basis of monthly invoices as work progresses. - 22a - , • Res. #244 City of Oshkosh , 2 August 9, 1989 Your signatures below will indicate your acceptance of this proposal. Sincerely, Accepted by: J. E. ARTHUR AND ASSOCIATES, INC. Engineers-Surveyors-Planners City of Oshkosh BBY. .,�.�--� Y Ja es E. Arthur, President Date: Date: l� `- � '—"�� By Date: - 22b - ' h � � � oa � � o c m c � � -� cn cn �+ cn � �--� c �-. �- . �--� O cn tn O m z c+ � -s r� � • �'• N •• O N .A �I --h lD � zn � � cn � o � o c-+cn mmo � � -s cn cn -v oo �D m -� �o m � .-.� �+ � � m �� � � � � � � � o � -s � c+ c � � �• � < �cV � N + '� � tii� O (n Y 7� < � i/� � ~' � N � � � 'S c-i- o--�. N < �