HomeMy WebLinkAbout35566 / 89-304 October 5, 1989 #304 RESOLUTION
(CARRIED LOST LAID OVER WITHDRAWN )
PURPOSE: CHANGE ORDER NO. 1, PUBLIC WORKS CONTRACT NO. 89-01B
INITIATED BY: DEPARMENT OF PUBLIC WORKS
BE IT RESOLVED by the Common Council of the City of Oshkosh
that the following Change Order, a copy of which is attached, is
hereby approved:
REIGEL ELECTRIC CORP.
3050 West Elberg Avenue
Appleton, WI 54915
Amount Added: $2, 680. 00
PURPOSE: Revisions to electrical work for Wastewater
Treatment Plant Aeration System
BE IT FURTHER RESOLVED that money for this purpose shall be
appropriated from:
Account No. 919-191 - Construction in Progress - Sewer Utility
SuBi��fITTED BY
� ���
; -, .,�.-�� �
,.__.�_____�_____.___..___-� -. �_�,�,� -��,
- 17 -
Res. #304
CHAI'VGE Or�Dr'�i NG. �
TO e Re i ge 1 E 1 ectr i c Corp. DATLD: September 25, 1989
3050 West Elberg Avenue
Appleton, WI -54915
Your present contract with the City of Oshkoshs Co;�tract No. 89-01B y
is hereby amended and changed as followse
( lnsert here work and/or materials to be added or eLiminated and
the ur.it and/or lump sum �rice to be added to or deducted from the
contract. )
REVISIONS TO CONTRACT - ELECTRICAL WORK FOR WASTEWATER TREATMENT PLANT
AERATION SYSTEM.
1 . ADD - Change 3 existing motor control centers from
600 amp to 1200 amp $1 ,340.00
2. ADD - Upgrade vertical feeders in 2 motor control
centers from 600 amp to 1200 amp (TIME ANU
MATERIAL ESTTMATE) $2,100.00
3. Use existing conduits in lieu of new conduits for
DO probes power and signal cable on the aeration tanks ( $400.00)
4. Local Flow Rate Indicators shall be column mounted
in lieu of stand$ ( $360.00)
TOTAL ADDED BY CHANGE ORDER ��1 $2,680.00
Aecommended; CITY OF OS�iKQ9H
Director of ?ub11c ��lorks By� City Manager
City Clerk
Approved and accepted:
See attachments.
Contractc_
I certify that provision has been made to pay the liability that
will accrue to the City of Oshkosh, GJisconsin, �ander the within
Change Order.
Comptroller
Approved as �o forma
City Attorne.p - 17a -
Res. #304
� �wner�
c��N�E oRDIIZ No: E108-89-016-03 DATE: September 14, 1989
KAII�FII� & ASSOCIATES, INC. PF�O.TECI': Oshkosh Wastewater Treatment Plant
Consulting �►gineers Aeration System Modifications
Post Office Box 150
416 East Highland Drive
Oconto Falls, WI 54154 OWIdER: City Of OShkoSh
215 Church Street
Oshkosh, WI 54902
OWNER'S PI�O.TEGT NO. : II�IGINEII�'S PRO.TEGT NO. : E 10 8-89-01
STATE PI�OJECT NO. : FIDEFtP,L P1�OJ F,CT NO. :
------------------------------------------------------------------------------
------------------------------------------------------------------------------
cot�c�: Reigel Electric Corp. CX�I`I'RACT DATE: January 11 , 1989
COl`1PLEI'ION DATE: October 10. 1989
ADDRFSS: 3050 West Elberg Avenue
Appleton, WI 54915
CoN'��CT: E108-89-016 - Electrical Work
You are directed to make the changes noted below in the above contract and.
this Change Order becomes a pa,rt of your contract, subject to all the
conditions thereof;
�� oF cx��: Contractor shall provide three (3) new bus splices for NiCC 3,
three (3) new bus splices for MCC 4, and three (3) new bus
splices for MCC 9. Bus splices shall be GE splice kit or
equal .
ADDITIONAL NUhIBER OF CON'I�?AGT DAYS P�ZOVIDID BY THIS CHANGE ORDER: 0 DAYS
�closures: Reigel Electric Corp. Letter Dated 9/13/89.
------------------------------------------------------------------------------
------------------------------------------------------------------------------
The changes result in the following ad,justment of Contract Price:
Contract Price Prior to this Change Order $ 257,638.00
Net (Increase/���Q Resulting from this Change Order $ 1 ,340.00
G�rrent Price, including this Change Orcler $ 258.978.00
------------------------------------------------------------------------------
------------------------------------------------------------------------------
The above changes are approved;
FOR Tf� ENGINEIIZ: By: ���.-tn_ .r , Date: C1j 1r1��5`�
Christb her Kaemp� r, P.E.
FOR Tf-� OWNER: By: Date:
Gerald Konrad
Director of Public Works
------------------------------------------------------------------------------
------------------------------------------------------------------------------
The above changes are accepted;
FoR � cot�croR: Reigel Electric Cor�.
, , n �
By� ' �4' — I�--�-'' , � Da.te: � �/:�"":�t3
..1
L e Reigel
- 17b -
, - . Res. #304
,' Owner File
CF�NGE o1zD� No: E108-89-016-04 DATE: Sentember 18� 1989
KAII�PFER & ASSOCIATES, INC. P�OJF.(�'T: Oshkosh Wastewater Treatment Plant
Consulting �gineers Aeration System Modifications
Post Office Box 150
416 East Highland Drive
Oconto Falls, WI 54154 OWNER: City of Oshkosh
215 Church Street
Oshkosh, WI 54902
oWNER'S PRO,TECI' NO. : ENGINEg2'S P�O.TECT NO. : E108-89-01
STATE PROJ�.'GT NO. : FEDEfZP,L PROJE(,'I' NO. :
------------------------------------------------------------------------------
------------------------------------------------------------------------------
cONTRACPOR: Reigel Electric Corp. OONTRACT DATE: January 11 , 1989
CXx1PLETION DATE: October 10� 1989
ADDR�SS: 3050 West Elberg Ave.
Appleton, WI 54915
c�oNi�CT: E108-89-01B - Electrical Work
You are directed to make the chariges noted below in the above contract and
this Change Order becomes a pa.rt of your contra,ct, subject to all the
conditions thereof;
NATCJRE OF CHANGE: Contractor shall provide four (4) 350 MCM Conductors per
phase for MCC 3 and four (4) 350 MCM Conductors per phase for MCC 4 to connect
the main powerlugs to the distribution bus lugs. The Conductors shall be installed
on a time and material basis for an estimated cost of $2, 100.00
ADDITIONAL NUMBER OF CON'I'RAGT DAYS PfZOVIDID BY THIS (,'`f-IANGE ORDER: _� DAYS
�closures: Reigel Electric Corp. Letter Dated 9/18/89
------------------------------------------------------------------------------
------------------------------------------------------------------------------
The changes result in the following adjustment of Contract Price:
Contract Price Prior to this Change Order $ _258�978.00
Net (Increase/���� Resulting from this Change Order $ 2� 100_00
G�rrent Price, including this Change Order $ 261 ,Q78_00
------------------------------------------------------------------------------
------------------------------------------------------------------------------
The above changes are approved;
FC)R Tf� ENGINEIIZ: By: Date: 9� 21 I�`�l
Christo er Kaemp r, P.E.
FOR TF-� OWNER: By: Date:
Gerald Konrad
Director of Public Works
------------------------------------------------------------------------------
------------------------------------------------------------------------------
The above ct��;es are accepted;
FOR TI-IE CONI�?AGTOR: R�e 1 F j Pr t r 1� Cn rT
� �
By: � r Date: �"'/% —(�
Ly�� Reigel
- 17c -
� - Res. #304
- � '� wne : ,:
CI-�NGE ORDER No: _ E108-89-016-02 DATE: July 18. 1989
xAF�IPFER & .ASSOCIATES, INC. P�bOJEGT: Oshkosh Wastewater Treatment Plant
Consulting �gineers Aeration System Modifications
Post Office Box 150
416 East Highland Drive
Oconto Falls, WI 54154 OWNER: City of Oshkosh
215 Church Street
Gshkosh, WI 54902
OWNER'S PROJE(,T NO. : ENGINEIIZ'S PROJEG"r NO. : E108-89-01
STATE PfbOJECr NO. : FEDERAL PftOJEC'I' NO. :
--------------------------
ooN'IRACPOR: Reigel Electric Corp. CON'IRAGT DATE: January 11 , 1989
Gbi`1PLEPION DATE: October 10, 1989
ADDRE,SS: 3050 West Elberg Avenue
Appleton, WI 54915
t�oNIRP.c�r: E108-89-01B - Electrical Work
You are directed to make the changes noted below in the above contract and
this Change Order becomes a part of your contract, subject to all the
conditions thereof;
NATURE OF CHANGE: Contractor may use existing conduits in lieu of new conduits
for DO probes power and signal cable on the aeration tanks.
ADDITIONAL N[JMBER OF CON'IRAGT DAYS PROVIDID BY THIS CHANGE ORDER: � DAYS
�closures: Reigel Elect;ic ,Corp. letter dated 7/11/89.
- ---------------------------------
The changes result in the following ad,justment of Contract Price•
Contract Price Prior to this Change Order $ 258,038.00
Net (Xtlh��/Decrease) Resulting from this Change Order $ (400.00)
Gtu�rent Price, including this Change Order $ 257,638.00
-------------------------------------------------------------
The above changes axe approved;
FOR Tf� ENGINEfft: By: Date: 1�1$��`�l
Chris her Kaem er, P.E.
FOR THE OWNEFZ: BY� Date:
Gerald Konrad
Director of Public Works
---------------------------------------------------
The above changes are accepted;
� T� �"��R� �igel Electric
By• C�. _ _��-�. ~ (/Da.te: g '_'��"_,y�`?
.�_ T
Ly Reigel
- 17d -
Res. #304
� � ' _��?�.�
CHANGE oRDIIZ No: E108-89-01B-01 DATE: _ July 18, 1989
KAII�PFgt & ASSOCIATES, INC. PRO.TECI': Oshkosh Wastewater Treatmer:t Plant
Consulting F�gineers Aeration System Modifications
Post Office Box 150
416 East Highland Drive
Oconto Falls, WI 54154 OWNER: City of OshkOSh
215 Church Street
Oshkosh, WI 54°02
owl�gt'S �ECT NO. : ENGINEIIZ'S PRO,TECr NO. : E 108-89-01
STA'I'E PROJEGT NO. : FEDERAL PROJF.G'P NO. :
------------------------------------------------------------------------------
------------------------------------------------------------------------------
CONTRA,CI'oR: Reigel Electric Corp. (70IV'I'RACT DATE: January 11 . 1989
tJOMPLETION DATE: October 10, 1989
ADDRESS: 3050 West Elberg Avenue
Appleton, WI 54915
CoNTRACI': E108-89-01B - Electrical Work
You are directed to make the changes noted below in the above contract and
this Change Order becomes a part of your contract, subject to all the
conditions thereof;
NATIJRE OF CHANGE: Local Flow Rate Indicators FI-214A, 224A, 213A, 223A, 212A, and
222A shall be column mounted.
ADDITIONAL NUMBER OF CON`I�ZACT DAYS PROVIDID BY THIS (,"HANGE ORDER: 0 DAYS
�closures: Reigel Electric Corp. letter dated 7/11/89.
------------------------------------------------------------------------------
------------------------------------------------------------------------------
The changes result in the following adjustment of Contract Price:
Contract Price Prior to this Change Order $ 258,398.00
Net {���(�(/Decrease) Resulting from this Change Order $ (3b0.00)
G�zrrent Price, including this Change Order $ 258,038.00
------------------------------------------------------------------------------
------------------------------------------------------------------------------
The above changes are approved;
FiOR Tf� ENGINEEft: By: �� Da.te: "l�l$`F�
Christo er Kaem r, P.E.
FOR TI� OWNF.ft: By: Date:
Gerald Konrad
Director of Public Works
------------------------------------------------------------------------------
------------------------------------------------------------------------------
The above changes are accepted;
FOR �'f-� c70N'I�?AC'i'OR: Re i ge 1 E 1 ectr i c
. �
By: � �' ��-� Date: �� — I�-'�'9
Lyle igel �
- 17e -
n 3 O z � �
DO n O "a CD
� --I c+ • � tn
�7 � O 'S •
�-+ O a' 00 O
rn z rD �o < �
o .. � i m w
.. o 0
cn � c� �
� � �
zD � ¢'
O � � -� �
m m o �o cn
cn cn -o o� N
� �
0
�rn -z
.�� n.
m
-s
z
0
t� �
� •::�
o ��
� �
� �� �
a �
n
c+