HomeMy WebLinkAbout35585 / 89-324 October 19, 1989 # 32� RESOLUTION
(CARRIED LOST LAID OVER WITHDRAWN )
PURPOSE: ACCEPT AND APPROVE WAIVER OF SPECIAL ASSESSMENT
NOTICES AND HEARING IN CONNECTION WITH IMPROVEMENTS
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
BE IT RESOLVED by the Common Council of the City of Oshkosh that
the Waiver of Special Assessment Notices and Hearing under Section
66 . 60 of the Wisconsin Statutes, for various utilities, street improve-
ments and sidewalks described below is hereby accepted and approved:
Description of Premises
Revised Waiver - SECOND ADDITION TO FOX CHASE PLAT
(Lots 32-57 , 63-80 , 87-102) , 60 lots
�HIRD ADDITION TO FOX CHASE PLAT
(Lots 103-112) , 10 lots
SANITARY SEWER BENEFITS
Costs based on Contract 89-09 prices
Construction cost = S 97 ,106 .30
8$ Engineering = $ 7 ,768.50
Total Cost 5104,874. 80
COST/LOT = $104 ,874 .80/70
_ $1,498.21
SA?dITARY & WATER LATERALS
Costs basec3 on Contract 89-09 prices
Construction cost = S42 ,000
8$ Engineerinq = S 3 ,360
Total Cost S45 ,360
COST/LOT = $45 ,360/70
= 5648.00
SIIBbIITTED BY
�L����� ,
APP�O?'r:�
- 17 - "'"..�`` .:
-- -,.,.���.
October 19, 19g9 #324 cont � d.
WATER MAIN
Cost based on Contract 89-09 prices ,
10" and 12" main assessed at II" costs
Construction Cost = 594,408.00
8$ Engineering = 7,552 .64
Total Cost 5101 ,960 .64
COST/LOT = 5101 ,960 .64/70
= 51,456.58
STORM SEWER
Cost based on Contract 89-09 prices
Developer Cost = Assessment + Rear Yard Drains & Storm Laterals
Assessment = S5 x front footage as measured at building
setback line (25 ' )
= S5 x 7,285 .28 '
= 536,426.40
Rear yard drains (3 inlets plus leads)
Construction Cost = S 6 ,110 .10
88 Engineering = S 488.81
Total Cost S 6,598.91
Storm Laterals
6" storm lateral provided to all lots except those which
can connect to rear yard drains
Construction Cost = $11 ,456 . 80
8$ Engineering = S 916 .54
Total Cost = 512 ,373 .34
Total Developer Cost = $36 ,426 .40
S 6 ,598.91
512 ,373 .34 .
555 ,398.65
COST/LOT = 555,398.65/70
_ $791 .41
- 18 -
October 19, 1989 #324 Cont � d.
GRADING � GRAVELING
Includes WINDHURST from Wah Wah Taysee to So. Oakwood ,
WAH WAH TAYSEE WAY, FOX TAIL LANE, BERNHEIM STREET, and
MONTCLAIR PLACE from Mereworth Court west to end of plat
2nd Addition to Fox Chase Plat (Lots 41-57, 63-80,87-102)
3rd Addition to Fox Chase Plat (Lots 103-112)
(WEST 20TH AVENUE NOT INCLUDED)
Approximate length = 3 ,920 feet
Estimated Construction Cost = 570,560
8$ Engineering = S 5,645
Total Cost = $76,205
COST/LOT = 576,205/61
= 51,249.26 '
CONCRETE PAVING
Includes same streets as Grading & Graveling
(WEST 20TH AVENUE NOT INCLUDED)
2nd Addition to Fox Chase Plat (Lots 41-57, 63-80,87-102)
3rd Addition to Fox Chase Plat (Lots 103-112)
Estimated Construction Cost = 5235 ,225 .80
8� Engineering = S 18, 818.06
5254,043 . a6
COST/LOT = 5254,043 . 86/61
= 54,164.65
SIDEWALKS
Assums side��alks required on aIl streets .
Distribute total cost equally among all lots .
Estimated Construction Cost = S 65 ,000
COST/LOT = $65,000/70
_ $928.57
- 19 -
� ' Res. #324
WAIVER OF SPECIAL ASSESSMENT NOTICES AND
HEARING UNDER SECTION 66 .60 , WISCONSIN STATUTES
The undersigned , owner of property benef ited by the fo 1 lowing
improvements to be made by the city of Oshkosh, Winnebago County,
state of Wisconsin, to wit:
SANITARY SEWER, WATER MAIN, SANITARY SEWER & WATER LATERALS,
STORM SEWER, GRADING & GRAVELING, CONCRETE PAVING, CONCRETE SIDEWALK
In consideration of the construction of said improvements by the
city of Oshkosh, Wisconsin, I hereby admit that such public improve-
ment will benefit said property and consent to the levying of special
assessments against the premises under Section 66.60 of the Wisconsin
Statutes for the cost of such improvements. In accordance with
Section 66.60 (18) of the Wisconsin Statutes , I hereby waive al l
special assessment notices and hearinqs required by Section 66.60 of
the Wisconsin Statutes; and i further agree and admit that the benefit
of my property from the construction of such improvements is in
proportion to the footage thereof:
Description of Premises
Revised Waiver - SECOND ADDITION TO FOX CHASE PLAT
(Lots 32-57, 63-80 , 87-102) , 60 lots
THIRD ADDITION TO FOX CHASE PLAT
(Lots 103-112) , 10 lots
SANITARY SEWER BENEFITS
Costs based on Contract 89-09 prices
Construction cost = S 97,106 .30
8$ Engineering = $ 7,768.50
Total Cost 5104,874. 80
COST/LOT = $104 ,874.80/70
_ $1,498.21
SANITARY & WATER LATERALS
Costs based on Contract 89-09 prices
Construction cost = 542 ,000
8$ Engineering = $ 3 ,360
Total Cost $45 ,360
COST/LOT = $45 ,360/70
= 5648.00
- 19a -
� Res. #324
,
WATER MAIN
Cost based on Contract 89-09 prices
10" and 12" main assessed at II" costs
Construction Cost = 594,408.00
8% Engineering = 7 ,552 .64
Total Cost 5101 ,960 .64
COST/LOT = 5101 ,960 .64/70
_ $1 ,456 .58
STORM SEWER
Cost based on Contract 89-09 prices
Developer Cost = Assessment + Rear Yard Drains & Storm Laterals
Assessment = S5 x front footage as measured at building
setback line (25 ' )
_ $5 x 7 ,285 .28 '
_ $36 ,426 .40
Rear yard drains (3 inlets plus leads)
Construction Cost = S 6 ,110 .10
8� Engineering = $ 488.81
Total Cost $ 6 ,598.91
Storm Laterals
6" storm lateral provided to all lots except those which
can connect to rear yard drains
Construction Cost = 511 ,456 . 80
8� Engineering = S 916 .54
Total Cost = $12 ,373 .34
Total Developer Cost = 536 , 426 .40
S 6 ,598.91
512 ,373 .34 .
555 ,398.65
COST/LOT = $55,398.65/70
_ $791 .41
- 19b -
" • ' ' Res. #324
GRADING & GRAVELING
Includes WINDHURST from Wah Wah Taysee to So . Oakwood ,
WAH WAH TAYSEE WAY, FOX TAIL LANE, BERNHEIM STREET, and
MONTCLAIR PLACE from Mereworth Court west to end of plat
2nd Addition to Fox Chase Plat (Lots 41-57 , 63-80 ,87-102)
3rd Addition to Fox Chase Plat (Lots 103-112)
(WEST 20TH AVENUE NOT INCLUDED)
Approximate length = 3 ,920 feet
Estimated Construction Cost = 570 ,560
8� Engineering = $ 5,645
Total Cost = 576,205
COST/LOT = $76,205/61
= 51,249.26 �
CONCRETE PAVING
Includes same streets as Grading & Graveling
(WEST 20TH AVENUE NOT INCLUDED)
2nd Addition to Fox Chase Plat (Lots 41-57 , 63-80 ,87-102)
3rd Addition to Fox Chase Plat (Lots 103-112)
Estimated Construction Cost = 5235 ,225 .80
8� Engineering = $ 18,818.06
5254,043 . £36
COST/LOT = 5254,043 . 86/61
= 54,164.65
SIDEWALRS
Assume sidewalks required on all streets .
Distribute total cost equally among all lots .
Estimated Construction Cost = $ 65 ,000
COST/LOT = $65,000/70
= 5928.57
Signature of Owners:
THOMAS N. RUSCH RICHARD L. GABERT
Date: Date:
- 19c -
c� 3 O 'v �--� � D �
D o n '—' � (D C� fD
� r�--� O c+� c+ fD 'n
�--� O Q cn O 'a
mz m < zc-+ �
� �� � � c+ f2o N
� (p �-'• -P
� � n �
z D D � � � �
O -G � N cn '�
rnmo � �
cn cn � � � szo 0
�-.� �o ci = m
V �
�� Q� A� �
'S '�
W �,. �-.
-S � <
Q(n CD
'S
D �
C1 � O
Q fi
� n r a
• O (n .,a!
-� � (D 4�t
O (D C� t n
(") ►'• id�
�'1 c�- A� �
O � � V 1
X � D
c7 cn
�" � N
� �' C�
(n c+ N
N � N