Loading...
HomeMy WebLinkAbout35585 / 89-324 October 19, 1989 # 32� RESOLUTION (CARRIED LOST LAID OVER WITHDRAWN ) PURPOSE: ACCEPT AND APPROVE WAIVER OF SPECIAL ASSESSMENT NOTICES AND HEARING IN CONNECTION WITH IMPROVEMENTS INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the Waiver of Special Assessment Notices and Hearing under Section 66 . 60 of the Wisconsin Statutes, for various utilities, street improve- ments and sidewalks described below is hereby accepted and approved: Description of Premises Revised Waiver - SECOND ADDITION TO FOX CHASE PLAT (Lots 32-57 , 63-80 , 87-102) , 60 lots �HIRD ADDITION TO FOX CHASE PLAT (Lots 103-112) , 10 lots SANITARY SEWER BENEFITS Costs based on Contract 89-09 prices Construction cost = S 97 ,106 .30 8$ Engineering = $ 7 ,768.50 Total Cost 5104,874. 80 COST/LOT = $104 ,874 .80/70 _ $1,498.21 SA?dITARY & WATER LATERALS Costs basec3 on Contract 89-09 prices Construction cost = S42 ,000 8$ Engineerinq = S 3 ,360 Total Cost S45 ,360 COST/LOT = $45 ,360/70 = 5648.00 SIIBbIITTED BY �L����� , APP�O?'r:� - 17 - "'"..�`` .: -- -,.,.���. October 19, 19g9 #324 cont � d. WATER MAIN Cost based on Contract 89-09 prices , 10" and 12" main assessed at II" costs Construction Cost = 594,408.00 8$ Engineering = 7,552 .64 Total Cost 5101 ,960 .64 COST/LOT = 5101 ,960 .64/70 = 51,456.58 STORM SEWER Cost based on Contract 89-09 prices Developer Cost = Assessment + Rear Yard Drains & Storm Laterals Assessment = S5 x front footage as measured at building setback line (25 ' ) = S5 x 7,285 .28 ' = 536,426.40 Rear yard drains (3 inlets plus leads) Construction Cost = S 6 ,110 .10 88 Engineering = S 488.81 Total Cost S 6,598.91 Storm Laterals 6" storm lateral provided to all lots except those which can connect to rear yard drains Construction Cost = $11 ,456 . 80 8$ Engineering = S 916 .54 Total Cost = 512 ,373 .34 Total Developer Cost = $36 ,426 .40 S 6 ,598.91 512 ,373 .34 . 555 ,398.65 COST/LOT = 555,398.65/70 _ $791 .41 - 18 - October 19, 1989 #324 Cont � d. GRADING � GRAVELING Includes WINDHURST from Wah Wah Taysee to So. Oakwood , WAH WAH TAYSEE WAY, FOX TAIL LANE, BERNHEIM STREET, and MONTCLAIR PLACE from Mereworth Court west to end of plat 2nd Addition to Fox Chase Plat (Lots 41-57, 63-80,87-102) 3rd Addition to Fox Chase Plat (Lots 103-112) (WEST 20TH AVENUE NOT INCLUDED) Approximate length = 3 ,920 feet Estimated Construction Cost = 570,560 8$ Engineering = S 5,645 Total Cost = $76,205 COST/LOT = 576,205/61 = 51,249.26 ' CONCRETE PAVING Includes same streets as Grading & Graveling (WEST 20TH AVENUE NOT INCLUDED) 2nd Addition to Fox Chase Plat (Lots 41-57, 63-80,87-102) 3rd Addition to Fox Chase Plat (Lots 103-112) Estimated Construction Cost = 5235 ,225 .80 8� Engineering = S 18, 818.06 5254,043 . a6 COST/LOT = 5254,043 . 86/61 = 54,164.65 SIDEWALKS Assums side��alks required on aIl streets . Distribute total cost equally among all lots . Estimated Construction Cost = S 65 ,000 COST/LOT = $65,000/70 _ $928.57 - 19 - � ' Res. #324 WAIVER OF SPECIAL ASSESSMENT NOTICES AND HEARING UNDER SECTION 66 .60 , WISCONSIN STATUTES The undersigned , owner of property benef ited by the fo 1 lowing improvements to be made by the city of Oshkosh, Winnebago County, state of Wisconsin, to wit: SANITARY SEWER, WATER MAIN, SANITARY SEWER & WATER LATERALS, STORM SEWER, GRADING & GRAVELING, CONCRETE PAVING, CONCRETE SIDEWALK In consideration of the construction of said improvements by the city of Oshkosh, Wisconsin, I hereby admit that such public improve- ment will benefit said property and consent to the levying of special assessments against the premises under Section 66.60 of the Wisconsin Statutes for the cost of such improvements. In accordance with Section 66.60 (18) of the Wisconsin Statutes , I hereby waive al l special assessment notices and hearinqs required by Section 66.60 of the Wisconsin Statutes; and i further agree and admit that the benefit of my property from the construction of such improvements is in proportion to the footage thereof: Description of Premises Revised Waiver - SECOND ADDITION TO FOX CHASE PLAT (Lots 32-57, 63-80 , 87-102) , 60 lots THIRD ADDITION TO FOX CHASE PLAT (Lots 103-112) , 10 lots SANITARY SEWER BENEFITS Costs based on Contract 89-09 prices Construction cost = S 97,106 .30 8$ Engineering = $ 7,768.50 Total Cost 5104,874. 80 COST/LOT = $104 ,874.80/70 _ $1,498.21 SANITARY & WATER LATERALS Costs based on Contract 89-09 prices Construction cost = 542 ,000 8$ Engineering = $ 3 ,360 Total Cost $45 ,360 COST/LOT = $45 ,360/70 = 5648.00 - 19a - � Res. #324 , WATER MAIN Cost based on Contract 89-09 prices 10" and 12" main assessed at II" costs Construction Cost = 594,408.00 8% Engineering = 7 ,552 .64 Total Cost 5101 ,960 .64 COST/LOT = 5101 ,960 .64/70 _ $1 ,456 .58 STORM SEWER Cost based on Contract 89-09 prices Developer Cost = Assessment + Rear Yard Drains & Storm Laterals Assessment = S5 x front footage as measured at building setback line (25 ' ) _ $5 x 7 ,285 .28 ' _ $36 ,426 .40 Rear yard drains (3 inlets plus leads) Construction Cost = S 6 ,110 .10 8� Engineering = $ 488.81 Total Cost $ 6 ,598.91 Storm Laterals 6" storm lateral provided to all lots except those which can connect to rear yard drains Construction Cost = 511 ,456 . 80 8� Engineering = S 916 .54 Total Cost = $12 ,373 .34 Total Developer Cost = 536 , 426 .40 S 6 ,598.91 512 ,373 .34 . 555 ,398.65 COST/LOT = $55,398.65/70 _ $791 .41 - 19b - " • ' ' Res. #324 GRADING & GRAVELING Includes WINDHURST from Wah Wah Taysee to So . Oakwood , WAH WAH TAYSEE WAY, FOX TAIL LANE, BERNHEIM STREET, and MONTCLAIR PLACE from Mereworth Court west to end of plat 2nd Addition to Fox Chase Plat (Lots 41-57 , 63-80 ,87-102) 3rd Addition to Fox Chase Plat (Lots 103-112) (WEST 20TH AVENUE NOT INCLUDED) Approximate length = 3 ,920 feet Estimated Construction Cost = 570 ,560 8� Engineering = $ 5,645 Total Cost = 576,205 COST/LOT = $76,205/61 = 51,249.26 � CONCRETE PAVING Includes same streets as Grading & Graveling (WEST 20TH AVENUE NOT INCLUDED) 2nd Addition to Fox Chase Plat (Lots 41-57 , 63-80 ,87-102) 3rd Addition to Fox Chase Plat (Lots 103-112) Estimated Construction Cost = 5235 ,225 .80 8� Engineering = $ 18,818.06 5254,043 . £36 COST/LOT = 5254,043 . 86/61 = 54,164.65 SIDEWALRS Assume sidewalks required on all streets . Distribute total cost equally among all lots . Estimated Construction Cost = $ 65 ,000 COST/LOT = $65,000/70 = 5928.57 Signature of Owners: THOMAS N. RUSCH RICHARD L. GABERT Date: Date: - 19c - c� 3 O 'v �--� � D � D o n '—' � (D C� fD � r�--� O c+� c+ fD 'n �--� O Q cn O 'a mz m < zc-+ � � �� � � c+ f2o N � (p �-'• -P � � n � z D D � � � � O -G � N cn '� rnmo � � cn cn � � � szo 0 �-.� �o ci = m V � �� Q� A� � 'S '� W �,. �-. -S � < Q(n CD 'S D � C1 � O Q fi � n r a • O (n .,a! -� � (D 4�t O (D C� t n (") ►'• id� �'1 c�- A� � O � � V 1 X � D c7 cn �" � N � �' C� (n c+ N N � N