Loading...
HomeMy WebLinkAboutInspection Report - 04/23/1979� �i% � c��;����ci� r.�nN��.r�; ni�;.,,�.�� ; _, ������,. �' April 23 , 1979 I ' 1NSPECTION REPORT Addr�•ss of Inspection : ll ''3 No . Sawyer Street , Oshkosh , Wi . Date of inspection : Apri ] 19 , 1979 For : Russell Beck of Valr�'y Realty & Construction By ; Merlin G. Raab Assist +�nt Building Inspector Approximately 3/4 of the area under the house crawl--space -. with the remainder being full basement . The crawl space has a dirt floor approximately thre� feet below the floor system. The floor syst��ms structural suppork members do not meet present code require- mentr; , but do not appear to sag . The house is supported by a series of ston�� piers . Floor joists are supported by a series of wood beams spanning between piers . 'The floor joists are let-in to the beams sidc� for support . Sever�� l floor joists framing into the north exterior wall beam have separated or are about to separate from the beam . Corrective measures should be taken to support floor joists in this : and any other areas wherr this has occurred . Other than serveral windows ( Closed at time of inspection) I found no measns of ventilating the crawl area . I recommend that several screened and louvered vents be installed . � Merlin G. Raab Assist.ant Building Inspector • P. O. BOX 1130 • OSHKOSH, WISCONSIN 54901