HomeMy WebLinkAbout90-36 April 19, 1990 #90-36 RESOLUTION
(CARRIED LOST LAID OVER WITHDRAWN )
PURPOSE: APPROVE ENGINEERING AGREEMENT FOR WESTHAVEN
DRIVE BRIDGE
INITIATED BY: PUBLIC WORKS DEPARTMENT
BE IT RESOLVED by the Common Council of the City of Oshkosh
that the attached agreement with OMNI ENGINEERS for design services
for Westhaven Drive Bridge is hereby approved and the proper City
officials are hereby authorized and directed to enter into same .
BE IT FURTHER RESOLVED that money for this purpose is hereby
appropriated from:
Account No. 338-999 -- Street Improvement Fund Exp .
f-
SJBMTTTED BY
.
_�,<I ,;n G%r����
- �� -
, ' Res. #90-36 �."C = .tj,-// ;==�� ,�
e-./�Y/1rl ��E'//C� L
OMN�I � � � ENGINEERS � / ��
.��� • ARCHITECTS �``,•�, J' "`�L`c
• SURVEYORS
���������� o SC ENT STS
April 2 , 1990
Mr. Gerry Konrad, Director of Public Works
Oshkosh City Hall
Oshkosh, Wisconsin
RE: Design Services for Westhaven Drive Bridge
Dear Mr. Konrad:
We are pleased to have this opportunity to make the following Proposal
to provide Engineering Services for the above project.
I. Pro�ect Description
Design of a structure for a new stream crossing over Sawyer
Creek on the extension of Westhaven Drive.
II. Services to be Provided
This Proposal is for the specific engineering services listed
below. OMNNI Engineers will provide the following professional
services for the design and preparation of construction plans
for this project.
1. Field survey necessary for the complete structure design
including:
a. Establish horizontal control from Abbey Drive to CTH E.
b. Obtain existing ground profile at the centerline of the
proposed road from Abbey Drive to CTH E.
c. Estab�ish existing cress-sActions at 104 foot stations,
500 feet on each side of the proposed structure.
d. Establish existing stream cross section as required for
the hydraulic analysis.
e. Locate pertinent topographic features in the vicinity
of the proposed structure.
2 . Preparation of the mapping necessary to accomplish the
design, based on the field survey.
3 . Coordination with the Wisconsin Department of Natural Re-
sources and the US Army Corps of Engineers, and the prepara-
tion and submittal of permit applications as required.
- 70a -
303 S. BLUEMOUND DR. •APPLETON, WI 54914 • (414)739-7814 • FAX(414)739-7765
• Res. #90-36
4 . Provide one soil boring at each abutment and the associated
Laboratory Tests and Soils Report. OMNNI Engineers will
receive proposals for the soils work from qualified consult-
ants and the City will be billed for the cost of the soils
work at OMNNI ' s cost.
5. Coordinate with the State Preservation officer at the State
Historical Society of Wisconsin to determine the impact of
this project upon historical or archaeological sites of
local , State or National interest. If an Archaeological
Survey is required, OMNNI Engineers would receive proposals
from qualified consultants and the City would be billed for
the cost of the survey at OMNNI ' s cost.
5. rreparati�n oF Construction plans (prepared on DOT Standard
Sheets) .
a. Title sheet showing project location.
b. Typical section sheet.
c. Plan and profile sheet showing utilities , proposed
right-of-way, property lines , benchmarks and other
information on existing features pertinent to the
project.
The plan and profile sheet will have a horizontal scale
1"=20 ' and a vertical scale of 1"=5 , ' and will show
proposed roadway location and vertical alignment for
maximum distance of 200 ' each side of the structure.
d. Cross sections will be plotted on both approaches, a
maximum of 200 ' on each side of the structure, for use
in the design of the project, and will become part of
the plan.
e. Structure plans and details.
7. Preparation of the necessary sp�cifications and estimates to
accommodate construction of the structure.
8 . Preparation of the necessary documents for bidding the
project.
9 . Other services and considerations
a. Attend informational meetings and public hearings as
requested by the Municipality.
b. Preparation of project cost estimates.
Westhaven Drive Bridge Engineering Proposal Page 2 of 4
- 70b -
• Res. #90-36
III. Pro�ect Timetable
We would anticipate commencing with the work as soon as author-
ized to proceed.
Upon authorization to proceed, the schedule for completing work
shall be as follows:
1. Complete field survey - i month
2 . Submit preliminary plans - 3 months
3 . Submit fina� plans, specifications and estimates - 4 months
4 . Letting - 5 months
IV. Fees to be Charqed
Fees for the design of the structure and preparation of the
bidding documents are based on time and materials not to exceed
$13 , 000. 00, with a fixed fee of $1, 950. 00, for a contract total
of $14, 950. 00.
Fees for the archaeological survey, soil borings, laboratory
tests and reports will be charged to the City at OMNNI ' s cost.
V. Additional Work
If required by the City, additional engineering services for
this project will be provided by OMNNI Engineers . Any such
additional work will be completed on the basis of base salary
times a multiplier of 2 . 4508 , plus reimbursable expenses .
Additional services are not anticipated at this time.
VI. Citv Responsibility
1. Approval of plans.
2 . Logistics , notices and meeting place for informational
meeting if required.
3 . Search of title.
4 . Obtaining easements or rights to lands affected by any
increase in the ?00 year flood elevation caused by the new
structure.
5. Reproduction and distribution of plans and specs used in
bidding the project.
6. Provide OMNNI Engineers with mylar of the contour map of the
site.
7 . Provide OMNNI Engineers with right-of-way information for
the extension of Westhaven Drive between Abbey Drive and CTH
nEu �
8 . Provide OMNNI Engineers with proposed pavement design and
typical section for the extension of Westhaven Drive between
Abbey Drive and CTH "E" .
VIII. Limitation of Liabilitv
Westhaven Drive Bridge Engineering Proposal Page 3 of 4
- 7 0 c -
' • Res. #90-36
The Owner agrees to limit the Design Professional 's Liability to
the Owner and to all construction contractors and subcontractors
on the project, due to the Design Professional ' s professional
negligent acts , errors or omissions , such that the total
aggregate liability of each Design Professional to all those
named shall not exceed $50 , 000 or the Design Professional ' s
total fee for services rendered on this project, whichever is
greater.
IX. Acceptance
If this Proposal meets y our approval, please sign where noted
below, and return a copy to our office to serve as o��r a��thcri-
zation. � �
Thank you for considering us for �his work. ti9e look forward to work-
ing with you.
Respectfully submitted,
OMNNI Enginee s
.�����
Robert J. Or h, PE
President
Authorization:
By: And:
Signature --- • DONNA C. SERWAS
Title: CITY ATTORNEY CITY CLERK
For: The City of Oshkosh
Date:
Westhaven Drive Bridge Engineering Proposal Page 4 of 4
- 70d -
� o -a m-� �
� —� -s cn -n cn
�L7 � .-.. c+ ^S •
�--� O �--' �' O
mz a < �
o .. � < � �
.. �o m o
� � m i
� w
z � � -° o cn rn
o -< o �o -s �..
mmo �o �• �
Cn N '� O < CD
--I fD CD
.-�.--. -S
U� CO �.
�� � �
►'•(�
d
� n
�p cn
-5
CD
fD
�
(D
�
c-F
�'I
O
'�