Loading...
HomeMy WebLinkAbout90-150 JUNE 21, 1990 # 90-150 RESOLUTION (CARRIED LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVE WATER DISTRIBUTION STUDY INITIATED BY: DEPARTMENT OF PUBLIC WORKS WHEREAS, the City of Oshkosh requested a proposal for analysis of improvements to the City's water distribution: NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the proper City officials are authorized and directed to enter into an appropriate agreement to obtain engineering services for improvements to the City's water distribution system as per the attached scope of services with: HOWARD NEEDLE5 TAMMEN & BERGENDOFF One Park Plaza, STE 600 11270 West Park Place Milwaukee, WI 53224 at a cost not to exceed $16, 000. 00. Money for this purpose is appropriated from: Acct. No. 810-701 - Water Utility - Const. in Progress. SUBMITTED BY . _.Pr C y'EP, � - 28 - . � REs. 90-150 � HOWAFaD NEEDL�S 7/aMMEN &.BERGENDOFF ARCHITECTS ENGINL=EqS PLANNERS SCOPE OF SERVICES , In response to the City of Oshkosh request for a proposal for the analysis of improvements to the water distribution system, we are pleased to respond with the following information: � The Firm , Howard Needles Tammen & Bergendoff's qualifications for professional engineering services are extensive. The Wisconsin office was established in 1956, and is locally managed to serve our clients° individualized and specific project needs. Our clients benefit from this on-site personalized service, , and also from the bnoad range of experience and highly speciaiized skilis of the firm's totafl � organization. The Wisconsin office has a total staff of 190, with capabilities in planning, design and construction of Iwater works projects. The staff specialists include civil, environmental, mechanical, electrical, structural, and transportation engineering and architecture. The firm has effectively pioneered the use of multi-disciplined design teams to solve the needs of both large and small projects, 1 Biographical data on the staff proposed for the analysis of the water distriburion system are contained in the Personnel Section of this proposal. That section also contains biographical data on additional � staff inembers available for any subsequent design work that could follow the water system analysis. 1fie firm has extensive experience in the planning and design of water supply and water and � wastewater treatment systems. More than 800 water and wastewater projects, valued at about $2.5 billion, were completed over the last 40 years. Of these, over 200 were waterworks projects. The Experience section of this proposal lists some representative projects involving water pumping stations 1 and storage tanks. Other broader-based experience is documented in the enclosed brochures, HNTB has extensive computer capabilities and would utilize the appropriate computer systems for � undertaking the analytical analyses proposed. Analvsis of Water Service in the Southwest Area � The expansion of the City of Oshkosh to the south and west has strained the abilit of the water Y distribution system to reach out to those extended areas. The higher elevations in that region and high I water demands of some industries in the Southwest Industrial Park, has also caused a drop in water � pnessures at peak usage periods. The potential for reduced water pressures is becoming a concern to the City, � In response to this concem for maintaining adequate water pressure in the southwest growth area, and an paracular the Southwest Industrial Park, HNTB proposes to: l1. Perform a computer analytical analysis of the water distribution piping system in the south and west regiono � -� - 28a - � , ` Res. 90-150 I NOWARD NEEDLES TAMMEN & BERGENDOFF � ARCNITECTS ENGINEERS PLANNERS _� SCOPE OF SERVICES (Contfnued) ' 2. Evaluate the need for a booster pressure zone and/or an elevated water storage tank for maintaining adequate water pressures> 1 � 3. Outline the limits of a water service system for a booster pressure zone, including recommended tank site and booster station location, � � 4. Identify and locate connection points between the existing water distribution system and the new booster pressure zonee I 5. Identify and recommend locations for any additional or parallel water mains required for either the e�cisting distributi�n syst�m or the nev�! booster zone. i � 6. Develop a capital cost estimate for the construction of the entire booster pressure zone water system and interconnecting service with the exisdng distribution system. lThis analysis will be undertaken in two phases: a) The analytical data will be developed on the basis of data available, and will be evaluated to � determine whether or not there is a need for a new booster pressure zone, as outlined under 1 and 2 above. The results of this evaluation will be reviewed with the City before undertaking any �dditional work. . � b) If it is determined that a new water booster pressure zone is needed, and when directed by the City, complete the analysis as oudined under 3 through 6 above, � Analysis of an Elevated Tank Location North of the Citv � The City of Oshkosh anticipated its long term water needs approximately 20 years ago, and selected a site for an elevated tank in the north growth area. Since water service at that time was adequately � provided to that area without the tank, its construcdon was postponed. The City is now responding to potential demands for rapid expansion to the north and is concemed about the adequacy of water service in this area. . � In response to this concem for providing adequate water service to the growth area north of the City, HNTB proposes to; � 1. Perform a computer analytical analysis of the water distribution piping system in this north region, � 2. Evaluate the City's projected growth plan and corresponding water system needs north of Nevada Avenuee � 3. Develop a conceptual water system plan for this area. � � - 28b - � REs. 90-150 � � �� = HOWARD NEEDLES TAMMEN & BERGENDOFF AqCHITECTS ENC3INEERS PLANNER5 � y SCOPE OF SERVICES (Continued) ( 4. Evaluate suitable storage tank sites, and recommend an appropriate locarion for the new tank� giving consideration to the previously selected tanlc site location. � 5. Develop a capital cost estimate for the construction of the required new facilities. � I Presentadon and Reoore � HNTB would make a formal presentarion of the analysis of the southwest and north areas upon conclusion of Lhe work and would embody the results in a report document. Twenty copies of the repart would a° provi�ed. 1 Schedule lHNTB is prepared to commence work on the analysis proposed herein upon approval by the City, and proposes the following schedule: � June/July 1990 � Authorization to Start Work a Obtain Water System Data a Progress Review Meetings � Early August • Review Results of Southwest Area and North Area Analysis with City Staff � August, 1990 � Conlinue Analysis and Evaluation � Conduct Progress Review Meeting to Review Initial Evaluation � of Analysis Results • Prepare Capital Cost Estimates � Early September � Review Draft Report with City's Staff October, 1990 � Presentadon of Analysis Results to the City � e Completion of Report � Cost of Services Compensation for engineering consulting services proposed herein will be provided on an hourly Time- � Charge Plus Expense basis, computed as> s The sum of Direct Payroll times a muldplier of 2.80 (to cover overhead and profit) and � Reimbursable Expenses, � � - 28c - I - � � Res 90-150 HOWARD NEEOLES TAMMEN & BERGENDOFF � � ARCHITECTS ENGINEERS PLAIVNERS � SCOPE OF SERVICES (Continued) • Direct payroll is defined as the wages paid to personnel for time chargeable to the project. • Iteimbursable Expenses are defined as costs of transportation, computer time and other costso � Estimates of the andcipated work effort for the analysis proposed are tabulated as follows: Descrivtion Hours Cost � la. Analysis of Southwest area to detennine need of new 000ster � pressure zone 10� $4,700 lb. Compleuon of Analysis of ISouthwest area 88 4,000 2. North Area Analysis 164 7,300 , Total Not-to-Exceed Amount $16� These tabulated estimated costs include direct payroll with the multiplier and reimbursable expenseso 1 � 1 � 1 1 1 � ��,���C ! ] - 28d - i � -°-i � --°a o � � m -s i r-, o 0 m z iv < cn o .. � � o .. ,. � � a, z D D �o c+ o -< o � m rnmo o -s cn cn � --i o ��. �-• v cn �.� � � r• � C � �• O � N c-{- , � Q �